Loading...
R-26-10 - Resolution Authorizing Award of Contract 2010 MFT ProgramRESOLUTION 'd)%' iD RESOLUTION AUTHORIZING AWARD OF CONTRACT FOR THE 2010 MFT RESURFACING PROGRAM WHEREAS, the Village of Lemont requires that the 2010 MFT Resurfacing Program be completed; and WHEREAS, the Village seeks to utilize the construction firm of Crowley- Sheppard Asphalt, Inc. for such work; and WHEREAS, Crowley- Sheppard Asphalt Inc. submitted a low bid for such work in the amount of $188,811.50. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Contract with Crowley- Sheppard Asphalt Inc. is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DuPAGE, ILLINOIS, on this 12th day of April, 2010. Debby Blatzer Paul Chialdikas Clifford Miklos Rick Sniegowski Ronald Stapleton Jeanette Virgilio AYES NAYS PASSED ABSENT v v V Approved by me this 12th day of April, 2010. Attest: CHARLENE SMOLLEN, Village Clerk CHARLENE SMOLLEN, Village Clerk BRIAN K. REAVES, Ilage President Approved as to form: Daniel P. Blondin, Village Attorney Date: Civil Engineers/ Municipal Consultants Frank Novotny & Associates, Inc. 825 Midway Drive • Willowbrook, IL 60527 4 Telephone: (630) 887 -8640 4 Fax: (630) 887 -0132 March 25, 2010 Mr. Ben Wehmeier Administrator Village of Lemont 418 Main Street Lemont, Illinois 60439 Re: 2010 MFT Resurfacing Program MFT Section No. 10- 00000 -01 -GM Dear Ben: Listed below and on the attached "Bid Tabulation ", please find the results of today's bid opening for the above - captioned project. Two (2) bids were received and tabulated, with no errors being found. Crowley- Sheppard Asphalt, Inc. $ 188,811.50 K -Five Construction Corp 213,989.25 Engineer's Estimate $ 196,000.00 The low bid submitted by Crowley- Sheppard Asphalt, in the amount of $188,811.50, is $7,188.50 (3.67 %) below the Engineer's Estimate of $196,000.00. Crowley- Sheppard Asphalt is prequalified by IDOT to perform this type of work. Therefore, we recommend that the Contract be awarded to Crowley - Sheppard Asphalt, P.O. Box 157, Chicago Ridge, IL. 60415, in the amount of $188,811.50. Should you have any questions concerning this matter, please do not hesitate to contact me. Very truly yours, FRAN O OTNY & ASSOCIATES, INC. es L. Cainkar, P.E., P.L.S. JLC/ce Enclosure cc: Mr. Dan Fielding, Director of Public Works, w /Enc. Mr. Ralph Pukula, Public Works Mr. Melchor R. Mangoba, P.E., w /Enc. File No. 09372 09372 Bid Tab letter 03%510.doc Date: 3/25/2010 OWNER: PROJECT DESCRIPTION: BID OPENING: TABULATION OF BIDS Village of Lemont 2010 MFT Resurfacing Program MFT Section No. 10- 00000 -01 -GM March 25, 2010 10:00 a.m. Page 1 Of 1 PROJECT NO: 09372 Engineers Estimate Crowley- Sheppard Asphalt 6525 W. 99th Street Chicago Ridge, IL. 60415 5% Bid Bond K -Five Construction 13769 Main Street Lemont, IL. 60439 5% Bid Bond Item Unit Unit Unit No Description Unit Quantity Price Amount Price Amount Price Amount 1 Hot -Mix Asphalt Surface Removal (Variable SQ YD 1678 2.50 4,195.00 1.75 2,936.50 2.75 4,614.50 Depth - 0" - 2 -1/2 ") 2 Hot -Mix Asphalt Surface Removal, 4" SQ YD 2685 3.50 9,397.50 4.25 11,411.25 6.00 16,110.00 3 Hot -Mix Asphalt Surface Removal - Butt Joint SQ YD 73 15.00 1,095.00 10.00 730.00 30.00 2,190.00 4 Bituminous Materials (Prime Coat) TON 3 400.00 1,200.00 405.00 1,215.00 1.00 3.00 5 Aggregate (Prime Coat) TON 8 20.00 160.00 10.00 80.00 40.00 320.00 6 Leveling Binder (Machine Method), N50, 3/4" Min. TON 212 85.00 18,020.00 87.00 18,444.00 85.00 18,020.00 7 Hot -Mix Asphalt Binder Course, IL -19.0, N50, 2-1/4" TON 334 80.00 26,720.00 74.00 24,716.00 78.00 26,052.00 8 Hot -Mix Asphalt Surface Course, Mix. "C ", N50, 1 -3/4" TON 694 85.00 58,990.00 81.00 56,214.00 80.00 55,520.00 9 Class D Patches, Type II, 5" SQ YD 24 80.00 1,920.00 50.00 1,200.00 45.00 1,080.00 10 Class D Patches, Type III, 5" SQ YD 54 60.00 3,240.00 47.00 2,538.00 45.00 2,430.00 11 Class D Patches, Type IV, 5" SQ YD 200 60.00 12,000.00 45.00 9,000.00 45.00 9,000.00 12 Area Reflective Crack Control Treatment SQ YD 7087 1.25 8,858.75 2.00 14,174.00 2.25 15,945.75 13 Driveway Pavement Removal SQ YD 100 8.00 800.00 15.00 1,500.00 45.00 4,500.00 14 Incidental Hot -Mix Asphalt Surfacing TON 33 150.00 4,950.00 135.00 4,455.00 95.00 3,135.00 15 Aggregate Base Repair TON 100 25.00 2,500.00 30.00 3,000.00 85.00 8,500.00 16 Preparation of Base SQ YD 2685 2.00 5,370.00 1.00 2,685.00 1.85 4,967.25 17 Sidewalk Removal SQ FT 400 2.00 800.00 1.50 600.00 1.70 680.00 18 Portland Cement Concrete Sidewalk, 5 Inch SQ FT 500 6.00 3,000.00 5.00 2,500.00 3.00 1,500.00 19 Detectable Wamings SQ FT 80 45.00 3,600.00 22.00 1,760.00 27.00 2,160.00 20 Combination Curb & Gutter Removal FOOT 165 5.00 825.00 11.00 1,815.00 5.35 882.75 21 Combination Concrete Curb & Gutter, Type M-4.12 FOOT 165 35.00 5,775.00 18.00 2,970.00 21.00 3,465.00 22 Porous Granular Embankment, Subgrade (PGES) CU YD 50 50.00 2,500.00 115.00 5,750.00 50.00 2,500.00 23 Frames & Lids to be Adjusted EACH 4 350.00 1,400.00 340.00 1,360.00 325.00 1,300.00 24 Clean & Grout Catch Basins EACH 10 250.00 2,500.00 230.00 2,300.00 220.00 2,200.00 25 Pipe Underdrain, Perforated PVC, 6" Dia. FOOT 108 25.00 2,700.00 24.25 2,619.00 23.00 2,484.00 26 Trench Backfill (CA -16) CU YD 35 40.00 1,400.00 26.25 918.75 25.00 875.00 27 Core Drill Connection to Existing Catch Basins EACH 3 200.00 600.00 315.00 945.00 300.00 900.00 28 Concrete Driveway Pavement Removal SQ YD 40 15.00 600.00 15.00 600.00 10.00 400.00 29 Portland Cement Concrete Driveway Pavement, 7 Inch SQ YD 40 5.00 200.00 40.00 1,600.00 80.00 3,200.00 30 Brick Paver Removal and Replacement SQ FT 50 20.00 1,000.00 11.00 550.00 22.00 1,100.00 31 Topsoil Fumish & Place CU YD 50 35.00 1,750.00 33.00 1,650.00 21.00 1,050.00 32 Sodding SQ YD 450 10.00 4,500.00 5.50 2,475.00 9.00 4,050.00 33 Thermoplastic Pavement Marking - Line 24" FOOT 65 7.00 455.00 40.00 2,600.00 37.00 2,405.00 34 Traffic Control & Protection L SUM 1 2,978.75 2,978.75 1,500.00 1,500.00 10,450.00 10,450.00 Totals: 196,000.00 188,811.50 213,989.25 Bid Error Corrections: Corrected Totals - - - 188,811.50 213,989.25 Over /Under - - - - - 7,188.50 17,989.25 Percent - - - - -3.67% 9.18% N ="O W x g 9yG •61p nod aiolaq poi ue 1lOO Aolaq sjots sou) NOLLVAVOX3 80.3 NOLLY O NJ NOLLVOOI ` j 18 unu 1MOr 44 sa.r /s a F ..=... . 1-4 s F� 11 H I S I O� N S ~� ` 1---1 , 1 w (� .,.��.,..,.�.� 0g £ 1r.�y' j--� ' err ♦♦♦♦® \ 'ice .f`.:. �.7 C5 os 8 FT = (0.4201 miles) DENOTES PROJECT LOCA ��� VILLAGE OF LEMONT, ILLINOIS 2010 M.F.T. RESURFACING PROGRAM - a �.:'! I w wN �� a , � �_ pow F+i ' _- 0 I- 0 W rte — -- .1., $ [ G- Ol N N d N E E E E �m IIII�II O .` �Q 9 e a\ 1 rr � a a a a 1� # a a a "" ' ,1:1!5:1.,..*.,.,.... �aaa a `„fir. ■IrilFa__� iistu wars 111.I.ji f) i:l�l , .� ■ �� 1- ' ��� M'1�ii i imp 1""'7 14,4,i-114 a Q , �F alit a a a iav ci z.?3 17 q % li �\ as aai�� p + J J:.. :1 ' ..:� 1 �—f r'C ilk -1�' • • .. yt 1•11111110 MU l ' w N W W W W W W W > N W N N ■ d W 0 0 W wJ N V M Ti OOOO IA'I b inlay *, 825Nldsylkin • WiDamfiroak 6 •6*62 MmWWmw.+.m tenet