Loading...
R-80-11 Res Approving Schematic Design Contract for Village HallRESOLUTION g. P-11 A RESOLUTION TO APPROVEE A SCHEMATIC DESIGN CONTRACT FOR VILLAGE HALL NOW, THEREFORE BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont that: SECTION 1: That the Village Administrator is authorized to enter into a Schematic Design contract with Wight not to exceed $40,000 for Village Hall. SECTION 2: Effective Date: This Resolution shall be in full force and effect from and after its passage, approval and publication in the manner provided by law. The Village Clerk of the Village of Lemont shall certify to the adoption of this Ordinance and cause the same to be published in pamphlet form. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COOK, WILL AND DU PAGE COUNTIES ILLINOIS on this 2 $ Day of Nowak r , 2011. AYES: NAYS: ABSENT: ABSTAIN Debby Blatzer V Paul Chialdikas ✓ Clifford Miklos ✓ Ron Stapleton V Rick Sniegowski V Jeanette Virgilio ATTEST: CHARLENE • MOLLEN Village Clerk BRIAN K. REAVES President November 22, 2011 Mr. Ben Wehmeier Village Administrator Village of Lemont 418 Main Street Lemont, IL 60439 VILLAGE OF LEMONT VILLAGE HALL RENOVATION SCHEMATIC DESIGN PROPOSAL Dear Mr. Wehmeier: Wight & Company is pleased to submit this proposal for Schematic Design Services related to the renovation of the Village Hall. We have prepared our proposal in the following four parts: • PROJECT UNDERSTANDING • SCOPE OF SERVICES • SCHEDULE • COMPENSATION PROJECT UNDERSTANDING We understand that the Village of Lemont (Village) wishes Wight & Company (Wight) to move forward with the schematic design for the renovation of the Village Hall. This design work will build on the conceptual planning work completed in late 2009 and will focus on the following major items: 1. Improvement of the main entry to accommodate a vestibule, lobby reconfiguration and modification of the stair to the second floor. 2. Building maintenance items including tuck - pointing, roofing, HVAC and fire protection modifications, and other deferred maintenance items. 3. Replacement of windows and exterior doors for enhanced efficiency and acoustical performance. 4. Toilet room and plumbing upgrades for the second floor, first floor staff toilets and incorporating public toilet rooms at the first floor lobby. 5. General interior renovations and space changes including addition of conferencing space. 6. Enhancements to the main network room and creation of additional editing support space for the local cable access television provider. 7. North facade upgrades to Village Hall and old Police Facility to enhance the entry and historic appearance. 8. Reconstruction of the east parking lot, front entry sidewalk improvements and landscaping, and exterior retaining wall repairs. The old police department space to the west of the Village hall is currently being leased and therefore the modifications to that space are intended to be more limited and confirmed to a new joint building front entry renovation, and exterior improvements including the north facade and roofing replacement. We understand that the presently targeted budget for the h Wqlrhi ` :& Company -wighlco.corn 2500 North Emit(age Road )arirsi, II.. 50561 P 630.965,7000 l' i30 959,7079 INTEGRATED SOLUTIONS Mr. Ben Wehmeier Village of Lemont November 22, 2011 Page 2 of 3 project is approximately two million dollars. The primary goal of this schematic design phase is to determine the exact scope of work that can be completed and develop cost estimates to confirm the scope is within the *_ s_c ! h!jdnet. SCOPE OF SERVICES Wight will provide architectural, mechanical, electrical, plumbing, structural and civil engineering services in the preparation of the project schematic design. The Schematic Design Documents will illustrate the basic scope, scale and relationship of project components through drawings and written scope narratives. Some of the work scope and deliverables for this phase of the project will include: • Additional field investigation to confirm the basic dimensional accuracy of existing conditions floor plans. This is not intended to be an exhaustive field investigation, but will be sufficiently complete to allow necessary schematic design decisions to be made. • Complete building code review to establish the code parameters that will shape the design. • Prepare schematic site plan showing proposed site work scope and improvements. • Preparation of principal floor plan(s) for areas that will be renovated with overall dimensions. • Preliminary building exterior elevations / descriptive building views to demonstrate the proposed facade enhancements. • Prepare basic building /wall sections as needed to convey scope especially related to the anticipated main front stair modifications. • Evaluate structural, mechanical, electrical, plumbing and fire protection modifications required and prepare a narrative on project design scope. • Prepare a project design narrative outlining the building architectural design elements, materials, and systems. • Prepare a preliminary estimate of construction cost. We anticipate the commencement of our work with a kick -off meeting to review and confirm the project goals and primary work items outlined in the Project Understanding. At this meeting, we will also walk the building and site to identify the areas of concern related to deferred maintenance items. Following this kick -off, additional field investigation and code analysis will be conducted to establish a baseline for design efforts moving forward. Design concepts will then be developed to convey options to address the primary design goals for the project, and as a decision is reached on the design direction, it will be further detailed to complete the schematic design scope. As the design scope is developed, we will also be developing cost estimates to confirm that the design decisions being made are in line with the targeted project budget. We anticipate utilizing our resources in the trade contracting community to assist with the development of the cost estimates. The conclusion of this work effort will be the presentation of a schematic design deliverable including drawings, written narratives and a project cost estimate. We will also join you in a presentation of the design scope and estimate to the Village Board as necessary. SCHEDULE Wight is prepared to begin work on this assignment within one week of the Village's authorization to proceed. We propose to coordinate with the Village Administration at the wightcaccrn iNT:EGRATED,SOLUTIONS' Mr. Ben Wehmeier Village of Lemont November 22, 2011 Page 3 of 3 outset of the project to develop a mutually acceptable working schedule. We understand that your goal is to target a year -end completion in order to provide a greater comfort level on the costs as you prepare for the issuance of bonds, and will work closely with you on this schedule to provide the necessary support. COMPENSATION We propose to complete the work defined in this proposal for a fixed fee of Thirty Thousand and 00/100 Dollars ($30,000). We will issue invoices to the Village on a monthly basis based on a percentage of work completed and invoices will be due within 30 -days. If this proposal is acceptable to the Village of Lemont, please signify your acceptance by signing in the space provided below and return one copy to us for our files. If you have any questions, please do not hesitate to contact Jason Dwyer at (630) 739 -6921. Respectfully Submitted, WIGHT & COMPANY Jason P. Dwyer, AIA, LEED AP Project Executive ACCEPTED BY: Village of Lemont Signature: Printed Name & Title: Date: Stephen J. Collins Vice President Government Programs wi(htco.com INTEGRATED SOLUTIONS