R-190-91 Resolution Authorizing Adoption of Agreement Between the Village of Lemont and Midwest Consulting EngineersITEM VII C.''
RESOLUTION 190
RESOLUTION AUTHORIZING ADOPTION OF AGREEMENT
BETWEEN THE VILLAGE OF LEMONT AND MIDWEST
CONSULTING ENGINEERS FOR PHASE II ENGINEERING
SERVICES ON STEPHEN STREET BRIDGE
WHEREAS, the Village of Lemont seeks to utilize Midwest
Consulting Engineers for Phase II Engineering for the Stephen
Street Bridge; and
WHEREAS, the Illinois Department, of Transportation has
agreed to participate in funding 80% of the cost of this project,
with the Village of Lemont funding 20%.
NOW, THEREFORE, BE IT RESOLVED by the President and Board
of Trustees that the attached Agreement for Engineering Services
in the Village of Lemont be approved.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES
OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DU PAGE,
ILLINOIS, on this d day of , 1991.
Kenneth Bromberek
Barbara Buschman
Bert Ercoli
Richard Kwasneski
William Margalus
Ralph Schobert
AYES NAYS PASSED ABSENT
v
i./
v
U
CHARLENE M. SMOLLEN, VILLAGE CLERK
Approved by me this G9 L!�(, day of
Attest:
, 1991.
/
.2g
so. PH � . FORZLEY, LLA E PRESIDENT
Charlene M. Smollen, Village Clerk
AGREEMENT FOR CONSULTANT'S SERVICES
between
VILLAGE OF LEMONT
COOK COUNTY
and
MIDWEST CONSULTING ENGINEERS, INC.
5151 North Harlem Avenue
Chicago, Illinois 60656
PROJECT DESCRIPTION
The reconstruction of the Stephen Street Bridge over the Illinois
and Michigan Canal located in the Village of Lemont, Cook County,
Illinois.
AGREEMENT FOR CONSULTANT SERVICES
Route:
Project:
County:
Section:
Job No.:
Stephen Street
BR- OS- D1(247)
Cook
90- 00013 -00 -BR
D- 91- 161 -90
THIS AGREEMENT, entered into this day of October, 1991,
by and between the VILLAGE OF LEMONT, hereinafter referred to as
the VILLAGE, and MIDWEST CONSULTING ENGINEERS, INC., a firm of
consulting engineers whose address is 5151 N. Harlem Avenue,
Chicago, Illinois 60656, hereinafter referred to as the
CONSULTANT.
WHEREAS, the VILLAGE proposes to engage the CONSULTANT to
render certain professional Phase II engineering services in
connection with the proposed improvement: The reconstruction of
the Stephen Street Bridge superstructure, including necessary
surfaced approaches, on Stephen Street over the Illinois and
Michigan Canal, hereinafter referred to as the PROJECT.
This AGREEMENT contains all the terms and conditions of the
agreement between the VILLAGE and the CONSULTANT and any changes in
this AGREEMENT shall have no effect unless they are made in
writing, signed by both parties, and incorporated as an amendment
to this AGREEMENT. No other written or oral understandings,
representations or agreements, other than those herein, have been
made by and between the parties hereto.
In consideration of these premises, the parties hereto agree
as set forth in the following pages numbered 1 thru 17 inclusive.
Executed by the VILLAGE OF LEMONT, Cook County, State of
Illinois, acting by and through its Board of Trustees.
ATTEST:
L t -: / •' l�C � G�; .4 --
VILLAGE CLERK
Executed by MIDWEST CONSULTING ENGINEERS, INC.
ATTEST:
e 17✓ sr •ofe /It
MDE017 -12
-1-
Project BR- OS- D1(247)
CERTIFICATION OF THE CONSULTANT
I hereby certify that I am the President and a duly authorized
representative of the firm of MIDWEST CONSULTING ENGINEERS, INC.
whose address is 5151 North Harlem Avenue, Chicago, Illinois
60656, and that neither I nor the above firm I herein represent:
(a) Has employed or retained for a commission, percentage,
brokerage, contingent fee or other considerations, any
firm or person (other than a bona fide employee working
solely for me or the above consultant) to solicit or
secure this contract;
(b) Has agreed, as an express or implied condition for
obtaining this contract, to employ or retain the services
of an firm or person in connection with carrying out the
contract;
(c) Has paid, or agreed to pay, to any firm, organization or
person (other than a bona fide employee working solely
for me or the above consultant) any fee, contribution,
donation or consideration of any kind, or in connection
with, procuring or carrying out the contract; except as
herein expressly stated (if any);
(d) Are presently debarred, suspended, proposed for
debarment, declared ineligible, or voluntarily excluded
from covered transactions by any Federal department or
agency;
(e) Have within a three -year period preceding this AGREEMENT
been convicted of or had a civil judgement rendered
against them for commission of fraud or a criminal
offence in connection with obtaining, attempting to
obtain or performing a public (Federal, State, or local)
transaction or contract under a public transaction:
violation of Federal or State antitrust statutes or
commission or embezzlement, theft, forgery, bribery,
falsification or destruction of records, making false
statements, or receiving stolen property.
Are presently indicted for or otherwise criminally
civilly charged by a governmental entity (Federal, State,
local) with commission of any of the offenses enumerated
in item (e) of this certification.
(f)
(g)
Have within a three -year period preceding this AGREEMENT
had one or more public transactions (Federal, State,
local) terminated for cause or default.
MCE017 -12 -2-
Project BR- OS- D1(247)
I acknowledge that this certificate is to be furnished to the
DEPARTMENT and the Federal Highway Administration, U.S. Department
of Transportation, in connection with this contract involving
participation of Federal -Aid highway funds, and is subject to
applicable State and Federal Laws, both criminal and civil.
DATE rC)'(7
MCE017 -12 -3-
Project BR- OS- D1(247)
CERTIFICATE OF VILLAGE
I hereby certify that I am the President of the VILLAGE OF LEMONT,
Cook County, of the State of Illinois, and that the CONSULTANT,
MIDWEST CONSULTING ENGINEER, INC., or their representative, has not
been required directly or indirectly as an express or implied
condition in connection with obtaining or carrying out this
AGREEMENT to:
(a) Employ or retain, or agreed to employ or retain, any firm
or person; or
(b) Pay or agree to pay, to any firm, person or organization
any fee, contribution, donation or consideration of any
kind; except as herein expressly stated (if any).
I acknowledge that this certificate is to be furnished to the
ILLINOIS DIVISION OF HIGHWAYS and the Federal Highway
Administration, U.S. Department of Transportation, in connection
with this AGREEMENT involving participation of Federal -Aid highway
funds, and is subject to applicable State and Federal Laws both
criminal and civil.
DATE
IllAfeiv, 41.46 die mr,
' .7 I • EN '
ILLAGE OF LEMONT
MCE017 -12 -4-
Project BR- OS- D1(247)
DELETION AND AMENDMENTS TO THE
ILLINOIS DEPARTMENT OF TRANSPORTATION'S
STANDARD AGREEMENT PROVISIONS FOR CONSULTANT SERVICES
DATED 1990
1. Incorporation by Reference
The Illinois Department of Transportation's "Standard
Agreement Provisions for Consultant Services," dated 1990
hereinafter referred to as the "STANDARD PROVISIONS ", are
incorporated and made part of this AGREEMENT except as deleted
or amended hereinafter. (STANDARD PROVISIONS' section
references shown in parenthesis):
1.1 (SP 1) Definitions, as they pertain to the PROJECT,
shall be set forth in Section 1 of the STANDARD
PROVISIONS, amended to add the following:
1.1.1 IDOT - Department of Transportation, State of
Illinois
1.1.2 Categorical Exclusion - A category of actions
which do not individually or cumulatively have a
significant effect on the human environment.
These actions, therefore, are excluded from the
requirement for development and processing of an
Environmental Assessment or an Environmental
Impact Statement (for Federal actions) or a State
Improvement Report (SIR) (for State -only or State
and local funded actions).
1.1.3 Proiect Development Report - A document
containing appropriate engineering information
and environmental documentation, which is
prepared for Federal or State -only funded actions
meeting the requirements for a Categorical
Exclusion. Adequate environmental analyses must
be conducted to substantiate a Categorical
Exclusion. Applicable information required for a
Combined Design Report would also be included in
a Project Report.
1.2 (SP 1.17) Wherever the word DEPARTMENT is used, it shall
be construed to mean the VILLAGE, except the word
DEPARTMENT shall also include IDOT in Subsections 2.12,
2.24(b), 2.27, 2.28, 2.29, and Section 6, in its
entirety, of the STANDARD PROVISIONS.
MCE017 -12 -5-
Project BR- OS- D1(247)
1.3 (SP 2.41) The CONSULTANT shall invoice the VILLAGE, not
the Liaison Engineer as provided in Section 2.41 of the
STANDARD PROVISIONS, in a format mutually agreed to by
the VILLAGE and the CONSULTANT.
2. Scope of Work
2.10 Phase II Engineering
Phase II Engineering includes preparation of contract
plans and documents in accordance with IDOT procedures
for FAUS projects. The work tasks required are:
a. Review Location Data and Supplemental Survey
b. Plan Development Criteria
- Develop ornamental railing study and design
- pavement selection analysis
c. Pre -final and Final Contract Plans
- Develop contract plans in accordance with IDOT,
FHWA, and Village Standards.
- A total of not more than 23 sheets are
anticipated.
d. Utility Coordination and Relocation Studies and
Design
e. Field and Office Plan Check
f. Quantity Calculations
g. Special Provisions for the Illinois Department of
Transportation Standard Provisions for Road and
Bridge Construction (adopted July 1, 1988)
h. Engineer's Cost Estimate
i. Right -of -Way Documents
j.
Project Administration, Documentation and
Coordination
k. Attendance at not more than one (1) pre -
construction meeting.
MCE017 -12 -6-
Project BR- OS- D1(247)
1. All reports, plans, plats and special provisions to
be furnished by the CONSULTANT, pursuant to this
AGREEMENT, will be in accordance with current
standard specifications and policies of the
DEPARTMENT. It is being understood that all such
reports, plats, plans and drafts shall, before
being finally accepted, be subject to approval by
the VILLAGE and the DEPARTMENT.
m. To attend conferences at any reasonable time when
requested to do so by representatives of the
VILLAGE or the DEPARTMENT.
n. Basic survey notes and sketches, charts,
computations and other data prepared or obtained by
the CONSULTANT pursuant to this AGREEMENT will be
made available, upon request, to the VILLAGE or the
DEPARTMENT without cost and without restriction or
limitations as to their use.
2.20 The CONSULTANT shall furnish the VILLAGE the following
documents and plans. Copies will be provided as needed:
a. Prefinal and Final Contract Plans and Documents
b. Engineer's Estimate of Cost
c. Right -of -Way Acquisition Plans, Plats and Legal
Descriptions
3. The VILLAGE agrees to furnish the following items:
a. All presently available survey data and information
including standard details and standard specifications
adopted by the VILLAGE and other available data useful to
the work being done by the CONSULTANT.
4. Project Schedule
The CONSULTANT shall commence work on Phase II within five (5)
calendar days after date of Authority to Proceed. The work
will be completed and delivered to the VILLAGE within the
following period:
Phase II - 127 calendar days after date of Authority to
Proceed. That duration allows 42 calendar days for VILLAGE
and IDOT reviews. For the purposes set forth in Section 2.21c
of the STANDARD PROVISIONS, the anticipated date of completion
shall be March 6, 1992. The anticipated project schedule is
included as Exhibit E.
MCE017 -12 -7-
Project BR- OS- D1(247)
5. Prime Compensation
5.1 Phase II
Subject to an Upper Limit of Compensation of $50,562.00,
the CONSULTANT shall receive, as full payment for
completing the Phase II work required of him under this
AGREEMENT, reimbursement of his eligible actual costs in
accordance with Section 2.45 of the STANDARD PROVISIONS,
plus a Fixed Amount of $6,349.00.
5.2 The Prime Compensation may be increased or decreased by
subsequent agreement between the contractual and
approving parties if there is a major change in the
scope, character or complexity of the work.
The fee may be adjusted in accordance with Section 2.21
of the STANDARD PROVISIONS if the duration of the work in
any phase extends more than six (6) months beyond the
date of completion stated in Section 4 of this AGREEMENT
due to no fault of the CONSULTANT.
For services rendered by any subconsultant retained by
the CONSULTANT, the CONSULTANT will be reimbursed for the
actual amount invoiced to the CONSULTANT. Any such
subcontracted fees are included in the Upper Limit of
Compensation.
5.3 In the event the CONSULTANT, upon written order from the
VILLAGE, is required to perform extra work he shall, in
addition to the Prime Compensation, receive payment for
such extra work on the following basis: The CONSULTANT'S
actual costs will be reimbursed in the same manner as set
forth in Section 5.1, plus a negotiated fixed amount
based on the estimated cost of the work, .subject to a
pre- agreed Upper Limit of Compensation for each item of
work.
5.4 Retainage - The retainage of sums to be paid to the
CONSULTANT shall be in accordance with Section 2.42(b) of
the STANDARD PROVISIONS with the exception that the
retainage shall not apply to direct non - salary costs.
MCE017 -12 -8-
EXHIBIT A
HOURLY RATE RANGE
CONSULTANT'S REGULAR STAFF
CLASSIFICATION FROM
TO
Principal Engineer
$35.00 $45.00
Project Manager 25.00
34.00
Resident Engineer 17.00
23.00
Structural Engineer
21.00 25.00
Chief of Survey
23.00 25.00
Survey Party Chief
14.00 17.00
Senior Project Engineer
26.00 29.00
Project Engineer
17.00 23.00
Design Engineer
13.00 19.00
Construction Engineer
14.00 17.00
Technician - Survey
9.00 16.00
Technician - Construction
10.00 15.00
Technician - Design
14.00 20.00
Senior Drafter
13.00 15.00
CADD Drafter
12.00 16.00
Drafter
6.00 15.00
Clerical /Word Processor
7.00 12.00
Date: 05/28/91
SEFC -02
EXHIBIT B
PAYROLL BURDEN & FRINGE COSTS
% of Direct
Productive
Payroll
Federal Insurance Contributions Act
10.77
State Unemployment Compensation
0.51
Federal Unemployment Compensation
0.27
Workmen's Compensation Insurance
0.91
Paid Holidays, Vacation, Sick Leave
13.99
Bonus and Incentive Payments
6.89
Qualified Deferred Retirement Benefits 0.00
Group Insurance
9.51
TOTAL PAYROLL BURDEN & FRINGE COSTS
42.85%
Source: IDOT Prequalification - Fiscal Year Ending 12 /31/90
SEFC -31
EXHIBIT C
OVERHEAD AND INDIRECT COSTS
% of Direct
Productive
Payroll
State Income Taxes
0.02
Business Insurance, including accident, liability
and valuable papers
9.64
Depreciation
8.05
Indirect Salaries - Administrative, Secretarial,
Messenger, Contracts, Negotiations, Proposals,
Unassignable Staff Time, and Professional
Education
39.65
Reproduction and Printing Costs
0.99
Office Supplies
3.98
Data Processing
0.82
Professional Services including Legal and
Accounting
7.99
Employees Travel, Business Meetings, and Pre - Contract
Expenses
5.56
Telephone and Postage
1.79
Recruiting and Relocation Expense
0.67
Training and Educational Non - Salary Expense
0.75
Fees, Licenses, Dues, Publications, (Technical and
Professional)
0.97
Utilities and Maintenance
2.54
Office Rent
6.23
Employee Relations
1.66
Other Expenses
1.64
TOTAL OVERHEAD
92.95*
Source: IDOT Prequalification - Fiscal Year Ending 12/31/90
SEFC -15
EXHIBIT D
COST ESTIMATE OF CONSULTING SERVICES
PHASE II ENGINEERING
STEPHEN STREET BRIDGE OVER ILLINOIS MICHIGAN CANAL
Route STEPHEN STREET
Section 90- 00013 -00 -BR
Project BR-OS - 01(247)
County COOK
Job No. D -91- 161 -90
Consultant: Midwest Consulting Engineers, Inc. Date: 09/26/91
ITEM
1 REVISED LOC. DATA/
DATA COLLECTION
2 SUPPLEMENTAL SURVEY
3 PLAN DEV. CRITERIA
4 PREL. ROADWAY PLANS
5 PREL. STRUCTURE PLANS
6 UTILITY COORD. /RELOC.
STUDIES
7 FINAL ROADWAY PLANS
8 FINAL STRUCTURE PLANS
9 QUANTITY TAKEOFFS
10 SPECIFICATIONS
11 COST ESTIMATES /UNIT
COST SHEETS
12 RIGHT -OF -WAY DOCS.
13 QUALITY CONTROL /FIELD
& OFFICE PLAN CHECK
14 PROJECT ADMIN./
DOCUMENTATION /COORD.
Dollars (S)
Number Overhead
of &
Man Payroll Fringe
Hours Benefits
(A) (8) (C)
12 254 345
16 229 311
44 875 1188
130 2179 2959
400 7741 10512
31 627 851
18 290 394
60 1145 1555
40 776 1054
32 541 735
40 728 989
61 1033 1403
30 550 747
60 1227 1666
In -House
Direct
Costs
(D)
26
180
159
387
504
53
Sub -Total
(E)
599
566
2063
5318
18253
1637
1071
2700
1830
1276
1717
2940
1350
2893
Net Fee
(F)
86
81
296
764
2621
235
154
388
263
183
246
423
194
415
(a)
Services
by
Others
(G)
X of
Total Grand
Total
(H) (I)
685 1.4
647 1.3
2359 4.7
6082 12.0
20874 41.3
1872 3.7
1225 2.4
3088 6.1
2093 4.1
1459 2.9
1963 3.9
3363 6.7
1544 3.1
3308 6.5
TOTALS
1 974 1 18195 1 24709 1 1309 1 44213 1 6349 1 1 50562 100.0
ROX#8 /STEPHEN.WK1
(a) Description of Services:
-12-
EXHIBIT D
Page 1 of 4
AVERAGE HOURLY PROJECT RATES
STEPHEN STREET BRIDGE OVER ILLINOIS MICHIGAN
COOK COUNTY
Date: 09/26/91
CLASSIFICATION
ITEM 1 ITEM 2 ITEM 3 ITEM 4 ITEM 5 .
•
. : • REVIEW LOCATION : SUPPLEMENTAL : PLAN DEVELOPMENT : PRELIMINARY PRELIMINARY :
: SAL- : DATA /DATA SURVEY CRITERIA ROADWAY PLANS : STRUCTURE PLANS :
: ARY : COLLECTION .
•
:X PART : WGT. RATE :X PART : WGT. RATE :X PART : WGT. RATE :X PART : WGT. RATE :X PART : WGT. RATE :
PRINCIPAL
:35.00 .
PROJECT MANAGER
:27.70 : 33.34 : 9.24 :
. 7.92 : 2.19 : 4.24 : 1.17 :
PROJECT ENGINEER
:19.35 : 33.33 : 6.45 :
18.18 : 3.52 : 32.93 : 6.37 .
DESIGN ENGINEER
:16.40 : 33.33 : 5.47 : 25.00 : 4.10 : : 6.10 : 1.00 .
CHIEF OF SURVEY
:24.00 .
SURVEY PARTY CHIEF :16.00 : : 37.50 : 6.00 :
TECHNICIAN - SURVEY :11.25 : : 37.50 : 4.22 : :
CADD DRAFTER :15.00 : : 36.36 : 5.45 : : 53.39 : 8.01 .
DRAFTER :14.00 : : 43.90 : 6.15 . .
WORD PROCESSOR :11.50 : : 9.15 : 1.05 .
STRUCTURAL ENGINEER :24.00 :
: 45.46 : 10.91 : : 42.37 : 10.17 :
AVERAGE PAYROLL RATE : :100.00 : 21.15 :100.00 : 14.32 :100.00 : 19.88 :100.00 :
16.76 :100.00 :
•
19.35 :
ROX#8 /STEPHEN.WK1
EXHIBIT D
Page 2 of 4
AVERAGE HOURLY PROJECT RATES
STEPHEN STREET BRIDGE OVER ILLINOIS MICHIGAN
COOK COUNTY
Date: 09/26/91
CLASSIFICATION
ITEM 6 ITEM 7 ITEM 8 ITEM 9 ITEM 10
: UTILITY COORD./ : FINAL ROADWAY : FINAL STRUCTURE : QUANTITY TAKEOFFS : SPECIFICATIONS :
: SAL- :RELOCATION STUDIES : PLANS PLANS .
ARY : :
:% PART : WGT. RATE :X PART : WGT. RATE :% PART : WGT. RATE :X PART : WGT. RATE :% PART : WGT. RATE :
PRINCIPAL :35.00 : ,
PROJECT MANAGER :27.70 : 32.26 :
8.94 : 11.11 : 3.08 :
3.08 : 6.26 : 1.73 .
PROJECT ENGINEER :19.35 : 6.45 :
1.25 : 11.11 : 2.15 :
5.55
1.07 : 34.37 : 6.65 :
DESIGN ENGINEER
:16.40 : 61.29 : 10.05 .
18.52 .
3.04 : 34.37 : 5.64 :
CHIEF OF SURVEY :24.00 :
SURVEY PARTY CHIEF :16.00 : ,
TECHNICIAN - SURVEY :11.25 :
CADD DRAFTER
:15.00 : : 50.00 : 7.50 : 37.04 : 5.56 :
DRAFTER
:14.00 : : 77.78 : 10.89 .
WORD PROCESSOR
:11.50 .
3.33 : 0.38
. 25.00 : 2.88 .
STRUCTURAL ENGINEER :24.00 :
. 46.67 .
11.20 : 27.78 : 6.67 :
AVERAGE PAYROLL RATE : :100.00 : 20.24 :100.00 : 16.12 :100.00 : 19.08 :100.00 : 19.41 :100.00 : 16.90 :
ROX#8 /STEPHEN.WK1
EXHIBIT D
Page 3 of 4
AVERAGE HOURLY PROJECT RATES
STEPHEN STREET BRIDGE OVER ILLINOIS MICHIGAN
COOK COUNTY
Date: 09/26/91
CLASSIFICATION
ITEM 11 ITEM 12 ITEM 13 ITEM 14 .
: COST ESTIMATES/ : RIGHT -OF -WAY : QUALITY CONTROL/ : PROJECT ADMIN./ :
: SAL- : UNIT COST SHEETS : DOCUMENTS : FIELD AND OFFICE : DOCUMENTATION, :
: ARY : PLAN CHECK COORDINATION .
:X PART : WGT. RATE :X PART : WGT. RATE :X PART : WGT. RATE :X PART : WGT. RATE :X PART : WGT. RATE :
PRINCIPAL :35.00 : :
PROJECT MANAGER :27.70 : 8.33 : 2.31 : : 13.33 : 3.69 : 55.26 : 15.31 : .
PROJECT ENGINEER :19.35 : : 46.67 : 9.03 :
DESIGN ENGINEER :16.40 : 22.92 : 3.76 :
CHIEF OF SURVEY :24.00 : : 32.79 : 7.87 :
SURVEY PARTY CHIEF :16.00 : : 19.67 : 3.15 :
TECHNICIAN - SURVEY :11.25 : : 19.67 : 2.21 :
CADD DRAFTER :15.00 : 2.09 : 0.31 :
DRAFTER :14.00 : : 19.67 : 2.75 : 40.00 : 5.60 :
WORD PROCESSOR :11.50 : 33.33 : 3.83 : 8.20 : 0.94 : : 44.74 : 5.15 .
STRUCTURAL ENGINEER :24.00 : 33.33 : 8.00 :
AVERAGE PAYROLL RATE : :100.00 : 18.21 :100.00 : 16.93 :100.00 : 18.32 :100.00 : 20.45 : .
ROX#8 /STEPHEN.WK1
EXHIBIT D
Page 4 of 4
1) PHASE I
DESIGN APPROVAL
(OCT. 1, 1991)
2) CONTRACT
APPROVAL BY
VILLAGE
(OCT. 18, 1991)
3) NOTICE TO
PROCEED FROM IDOT
(NOV. 1, 1991)
4) PREPARE
PREFINAL PLANS &
SUBMIT TO IDOT
(DEC. 22, 1991)
5) PREFINAL PLAN
REVIEW BY IDOT
(JAN. 15, 1992)
6) PREPARE FINAL
PLAN & SUBMIT TO
IDOT
(FEB. 15, 1992)
7) FINAL PLAN
REVIEW BY IDOT
(MARCH 6, 1992)
8) ADVERTISEMENT
(MARCH 27, 1992)
9) PROJECT LETTING
(MAY 1, 1992)
ROX#6 /STEPHEN.WK1
EXHIBIT E
STEPHEN STREET BRIDGE - PHASE II PROJECT SCHEDULE
1991 1992
OCT NOV. DEC. JAN. FEB. MAR. APR. MAY
**
1 WK
* * **
2 WKS
3 WKS
NOTES:
7 WKS
1) ** = DURATION OF 1 -WEEK
2) SCHEDULE REQUIRES 23 -WEEKS
3) SCHEDULE INCLUDES 6 -WEEKS
IDOT REVIEW TIME
3 WKS
-16-
* * * * * * **
4 WKS
3 WKS
* * **
2 WKS
5 WKS
EXHIBIT F
DIRECT COST SUMMARY
VEHICLE MILEAGE
Meetings /Coordination 11 trips @ $26.50 = $ 291.00
PRINTING /REPRODUCTIONS
Plans:
10 Sets Prefinal Plans @ $15.20 =
10 Sets Final Plans @ $15.20 =
1 Set Mylar Reproducibles @ $207
Specifications:
10 Sets Prefinal Specificatins @ $2.80 =
10 Set Final Specifications @ $2.80 =
RIGHT -OF -WAY DOCUMENTS
Title Commitment Policy (1 each @ $350.00)
Recording Fee (1 each @ $51.00)
Map and Plat Reproduction
MCE017 -12 -17-
$ 152.00
152.00
207.00
$ 28.00
28.00
$ 350.00
51.00
50.00
Total: $1,309.00