R-208-92 Resolution Authorizing An Agreement For Phase I EngineeringITEM VI.C.3 RESOLUTION g RESOLUTION AUTHORIZING AN AGREEMENT FOR PHASE I ENGINEERING WHEREAS, the Illinois Department of Transportation and Southwest Council of Mayors have committed resources to intersection improvements at State Street and Illinois Street; and WHEREAS, the Village of Lemont share of this project will be limited to 20% of all phases of engineering, with the aforementioned agreement funding 80% of engineering and 100% of construction costs; and WHEREAS, the Village of Lemont has selected Midwest Consulting Engineers to perform Phase I engineering on this project. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees that the attached engineering Agreement be approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DU PAGE, ILLINOIS, on this // day of ® g,ziI , 1992. AYES NAYS PASSED ABSENT Kenneth Bromberek Barbara Buschman ✓ Bert Ercoli V Richard Kwasneski William Margalus / Ralph Schobert Charlene M. Smol Village Clerk Approved by me this / day of 77 , 1992 Attest: ∎I_ 11/L at-t- Charlene M. Smollen, illage Clerk AGREEMENT FOR CONSULTANT'S SERVICES between VILLAGE OF LEMONT COOK COUNTY and MIDWEST CONSULTING ENGINEER'S, INC. 5151 North Harlem Avenue Chicago, Illinois 60656 PROJECT DESCRIPTION Preparation of Project Development Report for Illinois Street /State Street Intersection improvements located in the Village of Lemont, Cook County, Illinois. AGREEMENT FOR CONSULTANT SERVICES Route: Illinois Street at State Street Project: County: Cook Section: Job No.: THIS AGREEMENT, entered into this 24th day of February, 1992, by and between the VILLAGE OF LEMONT, hereinafter referred to as the VILLAGE, and MIDWEST CONSULTING ENGINEERS, INC., a firm of consulting engineers whose address is 5151 North Harlem Avenue, Chicago, Illinois 60656, hereinafter referred to as the CONSULTANT. WHEREAS, the VILLAGE proposes to engage the CONSULTANT to render professional Phase I engineering services in connection with the proposed improvement: Illinois Street at State Street Intersection Improvement. This AGREEMENT contains all the terms and conditions of the agreement between the VILLAGE and the CONSULTANT and any changes in this AGREEMENT shall have no effect unless they are made in writing, signed by both parties, and incorporated as an amendment to this AGREEMENT. No other written or oral understandings, representations or agreements, other than those herein, have been made by and between the parties hereto. In consideration of these premises, the parties hereto agree as set forth in the following pages number 1 thru 19 inclusive. Executed by the VILLAGE OF LEMONT, Cook County, State of Illinois, acting by and through its Board of Trustees. ATTEST: VILLAGE CLERK LAGE PRESID Executed by MIDWEST CONSULTING ENGINEERS, INC. ATTEST: SECRETARY MCE020 -05 - 1 - PRESIDENT CERTIFICATION OF THE CONSULTANT I hereby certify that I am the President and a duly authorized representative of the firm of MIDWEST CONSULTING ENGINEERS, INC. whose address is 5151 North Harlem Avenue, Chicago, Illinois 60656, and that neither I nor the above firm I herein represent: (a) Has employed or retained for a commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other than a bona fide employee working solely for me or the above consultant) to solicit or secure this contract; (b) Has agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out the contract; (c) Has paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above consultant) any fee, contribution, donation or consideration of any kind, or in connection with, procuring carrying out the contract; except as herein expressly state (if any); (d) Are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department of agency; (e) Have within a three -year period preceding this AGREEMENT been convicted of or had a civil judgement rendered against them for commission of fraud or a criminal offence in connection with obtaining, attempting to obtain or performing a public (Federal, State, or local) transaction or contract under a public transaction: violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (f) (g) Are presently indicted for or otherwise criminally civilly charged by a governmental entity (Federal, State, local) with commission of any of the offenses enumerated in item (e) of this certification; Have within a three -year period preceding this AGREEMENT had on or more public transaction (Federal, State, local) terminated for cause or default; MCE020 -05 - 2 - (h) Have been barred from signing this AGREEMENT as a result of a violation of Sections 33E -3 and 33 -4 of the Criminal Code of 1961 (Chapter 38 of the Illinois Revised Statutes); and (i) Are in default on an educational loan as provided in Public Act 85 -827. I acknowledge that this certificate is to be furnished to the DEPARTMENT and the Federal Highway Administration, U.S. Department of Transportation, in connection with this contract involving participation of Federal -Aid highway funds, and is subject to applicable State and Federal Laws, both criminal and civil. DATE: MCE020 -05 - 3 - CERTIFICATE OF VILLAGE I hereby certify that I am the President of the VILLAGE of LEMONT, Cook County, of the State of Illinois, and that the CONSULTANT, MIDWEST CONSULTING ENGINEERS, INC., or their representative, has not been required directly or indirectly as an express or implied condition in connection with obtaining or carrying out this AGREEMENT to: (a) Employ or retain, or agreed to employ or retain, any firm or person; or (b) Pay or agree to pay, to any firm, person or organization any fee, contribution, donation or consideration of any kind; except as herein expressly stated (if any). I further certify that to the best of my knowledge and belief that neither I nor any other Village Officials: (1) Are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (2) Have within a three -year period preceding this AGREEMENT been convicted of or had a civil judgement rendered against them for commission of fraud or a criminal offence in connection with obtaining, attempting to obtain or performing a public (Federal, State, or local) transaction or contract under a public transaction: violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (3) Are presently indicted for or otherwise criminally civilly charged by a governmental entity (Federal, State, - local) with commission of any of the offenses enumerated' in item (2) of this certification; (4) Have within a three -year period preceding this AGREEMENT had on or more public transaction (Federal, State, local) terminated for cause or default; (5) Have been barred from signing this AGREEMENT as a result of a violation of Sections 33E -3 and 33 -4 of the Criminal Code of 1961 (Chapter 38 of the Illinois Revised Statutes); and MCE020 -05 - 4 - (6) Are in default on an educational loan as provided in Public Act 85 -827. I acknowledge that his certificate is to be furnished to the ILLINOIS DIVISION OF HIGHWAYS and the Federal Highway Administration, U.S. Department of Transportation, in connection with this AGREEMENT involving participation of Federal -Aid highway funds, and is subject to applicable State and Federal Laws both criminal and civil. DATE: MCE020 -05 - 5 - t h %C 4 PRESIDENT LLAGE OF LEMONT MONT DELETION AND AMENDMENTS TO THE ILLINOIS DEPARTMENT OF TRANSPORTATION'S STANDARD AGREEMENT PROVISIONS FOR CONSULTANT SERVICES, DATED 1990 1. Incorporation by Reference The Illinois Department of Transportation's "Standard Agreement Provisions for Consultant Services ", dated 1990 hereinafter referred to as the "STANDARD PROVISIONS ", are incorporated and made a part of the AGREEMENT except as deleted or amended hereinafter. (STANDARD PROVISIONS' section references are shown in parenthesis): 1.1 (SP 1) Definitions, as they pertain to the PROJECT, shall be set forth in Section 1 of the STANDARD PROVISIONS, amended to add the following: 1.1.1 IDOT - Department of Transportation, State of Illinois. 1.1.2 Categorical Exclusion - A category of actions which do not individually or cumulatively have a significant effect on the human environment. These actions, therefore, are excluded from the requirement for development and processing of an Environmental Assessment or an Environmental Impact Statement (for Federal actions) or a State Improvement Report (SIR) (for State -only or State and local funded actions). 1.1.3 Project Development Report - A document containing appropriate engineering information and environmental documentation, which is prepared for Federal or State - only funded actions meeting the requirements for a Categorical Exclusion. Adequate environmental analyses must be conducted to substantiate a Categorical Exclusion. Applicable information required for a Combined Design Report would also be included in a Project Report. 1.2 (SP 1.17) Wherever the work DEPARTMENT is used, it shall be construed to mean the VILLAGE, except the word DEPARTMENT shall also include IDOT in Subsections 2.12, 2.24(b), 2.27, 2.28, 2.29, and Section 6, in its entirety, of the STANDARD PROVISIONS. 1.3 (SP 2.41) The CONSULTANT shall invoice the VILLAGE, not the Liaison Engineer as provided in Section 2.41 of the STANDARD PROVISIONS, in a format mutually agreed to by the Village of the Consultant. MCE020 -05 - 6 2 . Scope of Work 2.10 Phase I Engineering Study assumes no historical involvement, regional traffic studies, right -of -way acquisition or structure involvement. The CONSULTANT shall complete the following work: a. Compilation of data and preparation of early coordination notifications. b. Make a field survey for the design studies and data collection for traffic studies. c. Perform a traffic analysis (existing and proposed capacities), preliminary design studies (2 geometric options), and preliminary pavement investigation at the intersection. d. Prepare a construction cost estimate. e. Prepare a draft Project Development Report. f. Prepare the final Project Development Report. 2.20 The CONSULTANT shall furnish the VILLAGE the following documents and plans. Copies will be provided as needed: a. Project Report b. Construction Cost Estimates 3. The VILLAGE agrees to furnish the following items: All presently available survey data and information including standard details and standard specifications adopted by the VILLAGE and other available data useful to the work being done by the CONSULTANT. 4. Project Schedule The CONSULTANT shall commence work on Phase I within five (5) calendar days after the date of Authority to Proceed. The work will be completed and delivered to the VILLAGE within the following period: Phase I - 110 calendar days after date of Authority to Proceed. That duration allows 21 calendar days for VILLAGE and IDOT reviews. For the purposes set forth in Section 2.21c of the MCE020 -05 - 7 - STANDARD PROVISIONS, the anticipated date of completion shall be June 30, 1992. The anticipated project schedule is included as Exhibit E. 5. Prime Compensation 5.1 Phase I Subject to an Upper Limit of Compensation of $21,417.00 the CONSULTANT shall receive, as full payment for completing the Phase I work required of him under this AGREEMENT, reimbursement of his eligible actual costs in accordance with Section 2.45 of the STANDARD PROVISIONS, plus a Fixed Amount of $2,596.00. 5.2 The Prime Compensation may be increased or decreased by subsequent agreement between the contractual and approving parties if there is a major change in the scope, character or complexity of the work. The fee may be adjusted in accordance with Section 2.21 of the STANDARD PROVISIONS if the duration of the work in any phase extends more than six (6) months beyond the date of completion stated in Section 4 of this AGREEMENT due to no fault of the CONSULTANT. For services rendered by any subconsultant retained by the CONSULTANT, the CONSULTANT will be reimbursed for the actual amount invoiced to the CONSULTANT. Any such subcontracted fees are included in the Upper Limit of Compensation. 5.3 In the event the CONSULTANT, upon written order from the VILLAGE, is required to perform extra work he shall, in addition to the Prime Compensation, receive payment for such extra work on the following bases: The CONSULTANT'S actual costs will be reimbursed in the same manner as set forth in Section 5.1, plus a negotiated fixed amount based on the estimated cost of the work, subject to a pre- agreed Upper Limit of Compensation for each item of work. 5.4 Retainage - The retainage of sums to be paid to the CONSULTANT shall be in accordance with Section 2.42(b) of the STANDARD PROVISIONS with the exception that the retainage shall not apply to direct non - salary cost. MCE020 -05 - 8 - EXHIBIT A HOURLY RATE RANGE CONSULTANT'S REGULAR STAFF CLASSIFICATION FROM TO Principal Engineer $35.00 $45.00 Project Manager 17.00 35.00 Resident Engineer 16.00 22.00 Chief of Survey 20.00 25.00 Structural Engineer 18.00 27.00 Survey Party Chief 13.00 17.00 Senior Project Engineer 20.00 30.00 Project Engineer 15.00 24.00 Design Engineer 13.00 19.00 Construction Engineer 13.00 19.00 Technician - Survey 9.00 12.00 Technician - Construction 12.00 19.00 Technician - Design 12.00 19.00 Chief Drafter 12.00 16.00 CADD Drafter 11.00 16.00 Drafter 8.00 17.00 Clerical /Word Processor 8.00 13.00 Date: 04/28/90 I E037/5 - 9 - EXHIBIT B PAYROLL BURDEN & FRINGE COSTS % of Direct Productive Payroll Federal Insurance Contributions Act 10.77 State Unemployment Compensation 0.51 Federal Unemployment Compensation 0.27 Workmen's Compensation Insurance 0.91 Paid Holidays, Vacation, Sick Leave 13.99 Bonus and Incentive Payments 6.89 Qualified Deferred Retirement Benefits 0.00 Group Insurance 9.51 TOTAL PAYROLL BURDEN & FRINGE COSTS 42.85% Source: IDOT Prequalification - Fiscal Year Ending 12/31/90 SEFC -31 ( EXHIBIT C OVERHEAD AND INDIRECT COSTS % of Direct Productive Payroll State Income Taxes 0.02 Business Insurance, including accident, liability and valuable papers 9.64 Depreciation 8.05 Indirect Salaries - Administrative, Secretarial, Messenger, Contracts, Negotiations, Proposals, Unassignable Staff Time, and Professional Education 39.65 Reproduction and Printing Costs 0.99 Office Supplies 3.98 Data Processing 0.82 Professional Services including Legal and Accounting 7.99 Employees Travel, Business Meetings, and Pre- Contract Expenses 5.56 Telephone and Postage 1.79 Recruiting and Relocation Expense 0.67 Training and Educational Non - Salary Expense 0.75 Fees, Licenses, Dues, Publications, (Technical and Professional) 0.97 Utilities and Maintenance 2.54 Office Rent 6.23 Employee Relations 1.66 Other Expenses 1.64 TOTAL OVERHEAD 92.950 Source: IDOT Prequalification - Fiscal Year Ending 12/31/90 SEFC -15 ■ EXHIBIT D COST ESTIMATE OF CONSULTING SERVICES PHASE I ENGINEERING FOR ILLINOIS STREET AT STATE STREET Route ILLINOIS STREET COOK COUNTY Section Project County COOK Job No. Consultant: Midwest Consulting Engineers, Inc. Date: 01/06/92 ITEM 1 COORDINATION AND DATA COLLECTION 2 FIELD SURVEY 3 TRAFFIC ANALYSIS 4 PRELIMINARY DESIGN STUDIES AND SOIL INVESTIGATION 5 QUANTITIES AND COST ESTIMATE 6 EXHIBIT PREPARATION AND DRAFTING 7 DRAFT REPORT PREPARATION 8 REPORT REVIEW AND PROCESSING 9 FINAL REPORT 10 SUPERVISION AND ADMINISTRATION Number of Man Hours (A) 69 24 95 47 14 34 54 19 20 14 Dollars (S) Overhead Payroll Fringe Benefits (B) (C) 1211 1645 355 482 1820 2472 928 1260 245 333 551 748 1044 1418 415 564 400 543 270 367 In-House Direct Costs (D) 300 100 100 100 150 Sub -Total (E) 3156 937 4392 2188 578 1299 2462 1079 1093 637 Net Fee (F) 460 136 640 319 84 189 359 157 159 93 (a) Services by Others (G) 1000 % of Total Grand Total (H) (I) 3616 16.9 1073 5.0 5032 23.5 3507 16.4 662 3.1 1488 6.9 2821 13.2 1236 5.8 1252 5.8 730 3.4 TOTALS 390 7239 9832 750 17821 2596 1000 21417 100.00 (a) Description of Services: Item 4 - Soils Subconsultant Work STATE_IL.WK1 /RAR EXHIBIT D Page 1 of 3 AVERAGE HOURLY PROJECT RATES ILLINOIS STREET AT STATE STREET COOK COUNTY Date: 01/06/92 CLASSIFICATION ITEM 1 COORDINATION : SAL- : AND DATA : ARY : COLLECTION ITEM 2 ITEM 3 ITEM 4 ITEM 5 FIELD SURVEY TRAFFIC : PRELIMINARY DESIGN: QUANTITIES AND ANALYSIS : STUDIES AND PVMT.: COST ESTIMATE . INVESTIGATION . • :% PART : WGT. RATE :% PART : WGT. RATE :% PART : WGT. RATE :% PART : WGT. RATE :% PART : WGT. RATE : PROJECT MANAGER :27.05 : 7.25 : 1.96 : : 4.21 . 1.14 : 10.64 : 2.88 . PROJECT ENGINEER :24.00 : 26.09 : 6.26 : 4.17 : 1.00 : 31.58 : 7.58 : 31.91 : 7.66 : 7.14 : 1.71 : DESIGN ENGINEER :17.00 : 28.99 : 4.93 : : 46.32 : 7.87 : 31.91 : 5.43 : 92.86 : 15.79 : CHIEF OF SURVEY :24.00 : 1.45 : 0.35 : 4.17 : 1.00 : SURVEY PARTY CHIEF :16.00 : 1.45 : 0.23 : 33.33 : 5.33 : TECHNICIAN - SURVEY :11.00 : 34.78 : 3.83 : 33.33 : 3.67 : CADD TECHNICIAN :15.50 : . 16.67 : 2.58 . . 8.51 : 1.32 . DRAFTER :14.50 : : 8.33 : 1.21 : 16.84 : 2.44 : 17.02 : 2.47 : WORD PROCESSOR :11.50 : 1.05 : 0.12 . AVERAGE PAYROLL RATE : :100.00 : 17.55 :100.00 : 14.79 :100.00 : 19.15 :100.00 : 19.75 :100.00 : 17.50 : STATE_IL.WK1/RAR EXHIBIT D Page 2 of 3 AVERAGE HOURLY PROJECT RATES ILLINOIS STREET AT STATE STREET COOK COUNTY Date: 01/06/92 CLASSIFICATION ITEM 6 ITEM 7 ITEM 8 ITEM 9 ITEM 10 EXHIBIT DRAFT REPORT REPORT REVIEW FINAL : SUPERVISION AND : : SAL- : PREPARATION PREPARATION AND PROCESSING : REPORT : ADMINISTRATION : ARY : AND DRAFTING :% PART : WGT. RATE :% PART : WGT. RATE :% PART : WGT. RATE :% PART : WGT. RATE :% PART : WGT. RATE : PROJECT MANAGER :27.05 : • • • • • • : 9.26 : 2.50 : 36.84 : 9.97 : 10.00 : 2.71 : 50.00 : 13.53 : PROJECT ENGINEER :24.00 : 2.94 : 0.71 : 38.89 : 9.33 : 26.32 : 6.32 : 40.00 : 9.60 : DESIGN ENGINEER :17.00 : 50.00 : 8.50 : 25.93 : 4.41 : 21.05 : 3.58 : 30.00 : 5.10 : CHIEF OF SURVEY :24.00 . SURVEY PARTY CHIEF :16.00 : TECHNICIAN - SURVEY :11.00 : CADD TECHNICIAN :15.50 : 17.65 : 2.74 : DRAFTER :14.50 : 29.41 : 4.26 : 3.70 : 0.54 : 5.26 : 0.76 : 10.00 : 1.45 : WORD PROCESSOR :11.50 : : 22.22 : 2.56 : 10.53 : 1.21 : 10.00 : 1.15 : 50.00 : 5.75 : AVERAGE PAYROLL RATE : :100.00 : 16.21 :100.00 : 19.34 :100.00 : 21.83 :100.00 : 20.01 :100.00 19.28 : STATE_IL.WK1 /RAR EXHIBIT D Page 3 of 3 EXHIBIT E PROJECT SCHEDULE ILLINOIS /STATE STREET INTERSECTION IMPROVEMENTS January 6, 1992 ITEM * COMPLETION DATE Contract Approval by Village, IDOT 02/24/92 Notice to Proceed 03/23/92 Draft Project Development Report 05/11/92 Project Development Report Review By Village & IDOT 06/02/92 Final Project Development Report 06/30/92 Design Approval 07/24/92 Final Phase II Design 10/09/92 Project Letting 12/04/92 * Project schedule assumes no historical involvement, right -of -way acquisition or structure involvement. - 15 - MCE020 -05 EXHIBIT F DIRECT COST SUMMARY VEHICLE MILEAGE Survey /Data Collection Meetings /Coordination PHOTOGRAPH /PRINTING /REPRODUCTIONS Film and Development Xerox Reproduction for Draft Report Printing (Exhibits for Report) Xerox Reproduction for Final Report AERIAL PHOTOGRAPHY Reproducible Mylar Exhibit 10 trips @ $20.00 = $ 200.00 10 trips @ $20.00 = $ 200.00 TOTAL = $ 30.00 $ 70.00 $ 80.00 $ 70.00 $ 225.00 $ 875.00 EXHIBIT G SUB - CONSULTANT PROPOSAL (SOILS INVESTIGATIONS) (SCHLEEDE- HAMPTON ASSOCIATES) - 17 - SCI II.EEDE HAMPTON ASSOCIATES CONSULTING ENGINEERS January 6, 1992 Mr. Richard Russo Project Manager Midwest Consulting Engineers, Inc. 5151 North Harlem Ave Chicago, Illinois 60656 Re: Proposal for Geotechnical Services for soil survey Proposed Intersection Improvements at State and Illinois Lemont, II Dear Mr. Russo: In response to your request, we are pleased to have the opportunity to submit the following proposal for performance of geotechnical services for the for the referenced project. Project Description We understand the scope of the project involves improvements to the intersection of State and Illinois Streets in Lemont. The anticipated work will likely involve widening or pavement work on the two (2) Illinois Street legs only as the State St. legs were recently widened as part of other work. Of interest for this project would be the pavement and subgrade conditions for the PCC and Bituminous portions of those two legs. The proposed scope of exploration for this project will consist of 4 pavement core /soil probes. We would propose to conduct at each location explored a pavement core through the existing street, and a probe exploration to a depth of 12 to 18 inches below the surface. Samples of the base and subgrade are retrieved for classification and testing. This provides information on the thickness and condition of the existing pavement, and a moisture and consistency of the supporting subgrade. Laboratory testing will include moisture content determinations, and classification tests as required to identify major soil types. The classification data will be used to estimated an IBR value for the design subgrade soil. This value will be used in the pase 1 work and validated in phase 2 if necessary. 1601 NORTH BOND STREET SUITE 106 NAPERVII I F. ILLINOIS 6050 705- 369 -0710 FAX 70S-369-1723 SCHLEEDE HA \'PTON ASSOCIATES, INC. CONSULTING ENGINEERS Method of Performance - Analysis and Report The pavement core information will be presented in tabular form showing the core and subgrade and pavement condition data. We will provide a narrative of the existing pavement conditions. The results of this field exploration and laboratory testing would be used in an analysis and formulation of our recommendations. A letter report summarizing the data and recommendations concerning remedial treatments and earthwork will be prepared by a Registered Professional Engineer. Eiga On the basis of the above information, we estimate that these services can be provided for a fee of: $ 1,000.00. A breakdown of these costs is included on Attachment 1.1 to this letter. General For this project, we will assign Mr. Stephen C. Schleede, P.E. as Principal in Charge and Mr. William J. Wyzgala, P.E. as Project Engineer. They and our staff are acquainted with the local subsurface conditions and have participated in the planning, development and execution of numerous soil explorations in this area. We are looking forward to working with you on this project. Respectfully ,submitted, SCHLEE N ASSOCIATES, INC. eph- C.:chleede, P.E. Principal SCS /dla Attachment 1.1 SCHLEEDE HAMPTON ASSOCIATES, INC. CONSULTING ENGINEERS ATTACHMENT 1.1 ITEM EST. QUANTITY UNIT COST EXTENSION Mobilization, lump sum 1.0 $ 80.00 $ 80.00 Utility Clearance & meet, per hr. 4.0 $ 30.00 $ 120.00 Ragman and traffic Control, /hr. 4.0 $ 30.00 $ 120.00 Pavement Cores w/ subgrade probes, ea. 4.0 $ 95.00 $ 380.00 LABORATORY TESTS Moisture Contents, ea 4.0 $ 3.50 Grain Size Analysis, Including Hydrometer, ea. 1.0 $ 45.00 Atterberg Limits, ea. 1.0 $ 45.00 ENGINEERING SERVICES; Layout Coordination w /Engineer Pavement condition Narrative Prepare Togs and core records Analysis Report Preparation $ 14.00 $ 45.00 $ 45.00 Estimated Cost (@ Unit Rates Listed below) $ 175.00 TOTAL $ 979.00 SAY $ 1,000.00 Rate Per Hour Principal Engineer $ 85.00 Project Engineer $ 75.00 Staff Engineer $ 50.00 Field Engineer $ 48.00 Tech /Draftsman $ 30.00