Loading...
R-427-96 Authorizing adoption of an engineering agreement with beam, longest & neff for 1996 road program• RESOLUTION RESOLUTION AUTHORIZING ADOPTION OF AN ENGINEERING AGREEMENT WITH BEAM, LONGEST & NEFF FOR 1996 ROAD PROGRAM ITEM V.C.5 WHEREAS, the Village of Lemont is seeking to proceed with a Road Improvement Program during 1996; and WHEREAS, the funding of the program will consist of $460,000 in Motor Fuel Taxes; and WHEREAS, the Village has selected Beam, Longest & Neff, Inc. to perform all preliminary engineering and engineering inspections. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees that the attached Maintenance Engineering Agreement be approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DU PAGE, ILLINOIS, on this 13th day of May , 1996. Barbara Buschman Alice Chin Keith Latz Connie Markiewicz Rick Rimbo Ralph Schobert AYES NAYS PASSED ABSENT Approved by me this 13th day of Attest: 2EC NE SMOLLE , Village Clerk HARLENE SMOIJ.EN, Village Clerk 1996. KWASNESKI, Village President Illinois Department of Transportation Maintenance Engineering to be Performed by a Consulting Engineer (to be attached to BLR 8202 or BLR 8205) The services to be performed by the engineer, pertaining to the various items of work included in the estimated cost of maintenance operations (BLR 8202 or. 8205), shall consist of the following: PRELIMINARY ENGINEERING shall include: Investigation of the condition of the streets or highways for determination (in consultation with the local highway authority) of the maintenance operations to be included in the maintenance program; preparation of the maintenance resolution, estimate and proposal; attendance at meetings of the goveming body as may reasonably be required; attendance at public letting; preparation of the contract or acceptance of proposal forms; and the preparation of the maintenance expenditure statement. Preparation of watermain improvement plan. ENGINEERING INSPECTION shall include: Fumishing the engineering field inspection (including preparation of payment estimates and/or checking material invoices) of those maintenance operations requiring professional on -site inspection, as opposed to those ordinary operations such as street sweeping, snow removal, tree trimming, crack filling, cleaning ditches and culverts, etc., which typically require no professional inspection. Inspection of watermain construction. For fumishing preliminary engineering, the engineer will be paid a base fee .PLUS a negotiated fee percentage. For fumish- ing engineering inspection the engineer will be paid a negotiated fee percentage. The negotiated preliminary engineering fee percentage for each group shown in the "Schedule of Fees' shall be applied to the total estimated costs of that group. The negotiated fee for engineering inspection for each group shall be applied to the total final cost of that group for the items which required engineering. (See reverse side for additional instructions). In no case shall this be construed to include supervision of contractor operations. SCHEDULE OF FEES BASE FEE Programs of $15,000 or Less • Negotiated ($1,000 Maximum) Over $15,000 $1,000 PLUS • Group Preliminary Engineering Engineering Inspection Operation to be Inspected, Etc. Acceptable Fee % Negotiated Fee % Acceptable Fee % Negotiated Fee % I NA • NA NA NA NA II 2 % NA NA NA NA III 4 % NA 4% NA NA IV 5 % 5% 6% 5% as defined ab BY: ocal A. ency Official art Y [Q CIll Title SIGNATURES Beam, Longest Date IL 494 -0325 By: c. Engineer -282 5- 6- --- OF (P.E.Seal) BLR 4310 (Rev. 11/93) ve