Loading...
R-431-96 06/10/96RESOLUTION NO. AUTHORIZING LETTER OF CREDIT REDUCTION FOR HIRSEKORN RIDGE SUBDIVISION WHEREAS pursuant to the Subdivision Regulations, an owner or developer of a subdivision is required to deposit certain security or evidence thereof with the Village of Lemont to guarantee the installation of such improvements; and WHEREAS in the matter of Hirsekorn Ridge Subdivision, located on the north side of McCarthy Road and west of Carriage Ridge Estates Units I & II in Lemont, Illinois, an Irrevocable Letter of Credit #95 -437, State Bank of Countryside, in the amount of $400,000.00 was deposited with the Village of Lemont on September 18, 1995 and Irrevocable Letter of Credit #96 -458, State Bank of Countryside, in the amount of $1,275,997.56 was deposited February 6, 1996 to cover remaining public improvements; and WHEREAS Hirsekorn -Janas Partnership has made application for a reduction of the Irrevocable Letter of Credit #95 -437 in the amount of $3945.37 and Irrevocable Letter of Credit #96 -458 in the amount of $502,044.48; and WHEREAS a duly authorized agent of the Village of Lemont has inspected certain portions of the improvement and has found these portions to have been satisfactorily installed; NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont that: SECTION 1: Preliminary approval pursuant to the Lemont Subdivision Control Ordinance is hereby granted for the improvements identified in Attachment A and attached hereto. SECTION 2: The Irrevocable Letter of Credit #95 -437 is hereby reduced to $173,854.04. The Irrevocable Letter of Credit #96 -458 is hereby reduced to $773,953.08. NOW, THEREFORE BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont that the Irrevocable Letter of Credit #95 -437 for Hirsekorn Ridge Subdivision is hereby reduced to $173,854.04 and Irrevocable Letter of Credit #96 -458 is reduced to $773,953.08. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, UNTIES OF COOK, WILL, AND DU PAGE, ILLINOIS, on this day of �_ , 1996. Barbara Buschman Alice Chin Keith Latz Connie Markiewicz Rick Rimbo Ralph Schobert Approved by me this Attest: AYES v CHARLENE M. SMOLLEN, Village Clerk NAYS PASSED ABSENT day •, 4111,,e)i�' , /i► , 1996. HARD A. ASNESKI, Village President HARLENE M. M • LE ' , i lage Clerk Attachment "A" anz,tnt...ti-t_. Laser L onstructian, Inc. ASER CONSTRUCTION TO: 16 W 066 Jeans Rd. Lemont, Illinois 60439 Phone (708) 850 -7111 Fax (708) 850 -7213 PROPOSAL AND CONTRACT HIRSEXORN S. JANAS DEVELOPERS 531 WCODCREST LANE LEMONT, IL 60439 • •• tk • DATE: PROJECT NAME: PROJECT LOCATION: ENGINEER: DATE OF PLANS: TOTAL PRICE: Page 1 01/26/96 HIRSEXDRN RIDGE LE oNT, IL LASER CONSULTING IBW3 1,126,073.80 We are pleased to submit our Proposal for construction work at the above project as follows: DESCRIPTION OF WORK ESTIMATED QUANTITY R= _c�ac_s -� 8" DIA PVC: SANITARY SEWER 'i,.78 LE 4,479.000 LP 6" DIX PVC LONG SERVICE 3i 41.000 EACHI 6" DIA PVC SHORT SERVICE 36 43.000 EACH 48" DIX SANITARY MANHOLE 3 22.000 EACH SAN. SERVICE RISER 'i 4.000 EACH DROP PIPE ASSEMBLY S 5.000 EACH TRENCH RACXFILL, SANITARY MAIN 1100 1,100.000 CY TRENCH BAC."tI+ILL, SANITARY SERVICE I1o45O 1,700.000 CY UNIT PRICE AMOUNT amt tf 15.000 . 67, 185.00 ,,,..40?0 3,0,5- 4 700.000 - 28, 700.00 35,°to0 ...2,q%= S 300.000 . 12, 900.00 11,1400 (SOZ A 1,100.000 . 24,200.00 2 .00 0 Az0C O 140.000 . 560.00 5100 0 O 1,100.000 5,500.00 s--.5o0 0 O 13.400 . 14,740.00 I'4 , 7'(O 0 30 13.400 - 22,780.00 g ,SI s 11-4 SUBTOTAL FOR 1 SANITARY 176, 565.00 Itccorgba 97€ 3 .Z 8' DIA DIP WATERMAIN (Ds-IX 6,829.000 LP 311 15.000 . 102, 435.00 et7,0o00 4,755 8" VALVE W /BOX IS 16.000 EACH 1 550.000 . 8,800.00 $,250 '550 FIRS HYDRANT W /AUX VALVE Ito 18.000 EACH a 1,400.000 . 25,200.00 as 0-too 1.::c S __,,,,.. 1" LONG WATER SERVICE 23 37.000 EACH 14 300.000 - 11, 100.00 cp,4 00 'i 2-O7 S --, 1' SHORT WATER SERVICE ,,;.5' 47.000 EACH a2 175.000 8,225.00 4,37 5 3,650 • >4 7 1" DIA VALVE L BOX '18 84.000 EACH zj(o 75.000 . 6,300.00 3,000 a,7c0 ,c TRENCH BACXPILL, MAIN Sc,A 592.000 CY 0 13.400 7,932.80 'j,0t?2.90 0 -� TRENCH HACCFILL, SERVICE 19'.0 300.000 CY 111i 13.400 4,020.00 . ,'{g2.40 I,S,27.(< 24" DIA AUGHRED CASINO '70 70.000 LP 0 125.000 - 8,750.00 e,,,-7s0 O 8" PRESS. CONN. TO 16" MAIN 1 1.000 EACH 0 5,200.000 . 5,200.00 5;a00 0 C:ONN TO EXISTING 1 1.000 EACH O 300.000 . 300.00 -loco O SUBTOTAL POR 2 WATER 188,262.80 1101,P61;0 20..E 1 36" DIA STORM SEWER O 135.000 LF CBS- 50.000 - 6,750.00 O (0rl50 33' DIX STORM SEWER 'io 90.000 LF 0 46.000 . 4,140.00 40,40 D 30" DIA STORM SEWER A35" 325.000 LF q0 30.000 - 9,750.00 -Los-0 a.po0 27" DLA STORM SEWER 2'>� 250.000 LF o 29.000 . 7,250.00 7,050 0 24" DIA STORM SEWER '10 420.000 LF 0 24.000 10,080.00 Io,oOD 0 21" DIA STORM SEWER es-- 85.000 LP O 23.000 . 1,955.00 I,155- O 18" DIA STORM SEWER 0-(75 1,435.000 LP 0 18.000 . 25,830.00 5",a30 0 15" DIA STORM SEWER 1500 1,870.000 LF 3 -70 17.000 - 31, 790.00 ?S,5o0 tcia4 0 12" DIA STORM SEWER 30-14 4,522.000 LF 1'444 14.000 - 63,308.00 cf;,03(0 a0,�7: 12" DIA 04P 0 224.000 LP 2 }■f 22.000 - 4,928.00 0 4,411aE. 60" DIA C.H. 3 3.000 EACH 0 1,500.000 . 4,500.00 £45'00 0 60" DIA MANHOLE f3 8.000 EACH 0 1,700.000 . 13,600.00 13,000 48' DIA MANHOLE 40 49.000 EACH 3 950.000 . 46,550.00 I;,")o0 ..2.(657:-: 48" DIA CATCH BASIN ;1 23.000 EACH 2 920.000 . 21, 160.00 19 370 1 840 24" DIA INLET 02 26.000 EACH 8 500.000 . 13,000.00 goo() (400-0 (708) 850 -7111 ASER CONSTRUCTION Laser Construction, Inc. 8509 Gleneyre Road Darien, Illinois 60559 PROPOSAL AND CONTRACT TO: BIRSBNORN 4 JANAS DEVELOPERS 531 WOCDONE3T LANE LEMONT, IL 60439 DATE: PROJECT NAME: PROJECT LOCATION: ENGINEER: DATE OF PLANS: TOTAL PRICE: Page 2 Page 2 01/26/96 HIRSEXCRN RIDGE LEMONT, IL LASER CONSULTL`IG ENG 17r`n„ an We are pleased to submit our Proposal for construction work at the above project as follows: DESCRIPTION OF WORK ESTIMATED QUANTITY UNIT PRICE AMOUNT :,r16.u, lluh co 4r COSH 30" CONC. BN17 33CTION / 3.000 EACH a 750.000 - 2,250.00 -7.5O 1F'-- 36" CONC. END SECTION 0 1.000 EACH 1 1,050.000 - 1,050.00 0 1,0 yt0 15" CONC. END SECTION I 4.000 EACH, 3 430.000 = 1,720.00 430 J Ip'L4 O 12" CONC. END SECTION 1 4.000 EACH' 3 400.000 = 1,600.00 4 o O 11n o C 12. 0P END SECTION 0 2.000 SACS a 135.000 270.00 0 x"10 SSW BALES 25r I 246.000 EACH a a 1 5.000 - 1,230.00 I aS 1 i O 5 STONE RIP RAP 0 1 100.000 SY 20.000 - 2,000.00 O } O O ^v TRENCH BACEFtLL 4SS 500.000 CY Is 13.400 - 6,700.00 x,49 DC I ADJUST EXISTING MANHOLE 0 1.000 EACH I 250.000 - 250.00 V a SUBTOTAL FOR 3 STORM 281,661.00 a13,Ra' : u<<.‘ 7 ROLLED Lw PB 6, GUTTER 0 10, 520.000 LF 1 O S30 8.000 - 84, 160.00 v . t'oC 11" AOG. BASE, CA -6 0 18,613.000 SY 12,.a(2 6.400 - 119,123.20 O I19 1a3 BIT. MAT'L PRIME NAT O 5,585.000 GAL 5.505 0.680 . 3,797.80 a 3,147 ` 1.5" BIT CONC BINDER, CL I O 18,613.000 SY 161'DI3 2.250 = 41,879.25 o 41,8A 1.5" BIT CONC SURFACE CL I O 18,613.000 3Y 16,w13 2.450 - 45,601.85 0 6457,4,01 Am. A. SHOULDER, CA -6 O 4.000 TON 11 4.000 . 16.00 0 2AVT. MILL NG (BUTT JOINT) O 133.000 SY 133 8.600 1,143.80 O 1 1�= FINS OFADDVG 0 22,120.000 SY aa,1a0 0.550 . 12,166.00 £� 1Z,14c NOTE: ASPHALT PRICES BASED ON $130.00 PER TON FOR LIQUID ASPHALT SUBJECT - TO ESCALATION AND DE- ESCALATION AT . TIME OF DELIVERY ■ SUBTOTAL FOR 4 PAVING 307,887.90 O BACXPILL CURBS O 13,575.000 LF 13,S -/S 0.350 . 4,751.25 SUB-GRADE PAVEMENT 0 22, 115 .000 BY as 01 CT 0.500 - 11, 057.50 GRADE -OFF SEWER SPOIL O I 3,615.000 CY 3,017 0.450 . 1,626.75'. SUBTOTAL FOR 5 EARTH /7V3S� 12" ESVQ 0 I 7.000 LP 7 84.000 . 588.00 8" PVC 0 '1,329.000 LF 1,'? 19.400 - 25,782.60; NOTE: If this propose, meets with your approval and you desire to enter into a contract, please so indicate' by signing and returning to us the original and one copy of this proposal which shall become a contract upon, but not before, acceptance by us. Upon acceptance, a duly executed counterpart will be returned to you. This proposal may be withdrawn by us if not accepted within days. ASER CONSTRUCTION wag, 1 1 1 / Laser Construcllon, Inc. 8509 Gleneyre Road Darien, Illinois 80559 PROPOSAL AND CONTRACT TO: HIRSEIDORN G JANAS DEVELOPERS 531 WOODCREST LANE LEMONT, IL 60439 DATE: PROJECT NAME: PROJECT LOCATION: ENGINEER: DATE OF PLANS: TOTAL PRICE: Page 3 Page 2 01/26/96 HIRSEIOORN RIDGE LEMONT, IL LASER CONSULTING ENG We are pleased to submit our Proposal for construction work at the above project as follows: DESCRIPTION OF WORK 44' DIA MANHOLE DROP Pi'RH ASSEMBLY CONNECT TO NERD MANHOLE ESTIMATED QUANTITY UNIT PRICE IZ G,J =tip � O 6.000 EACH 1.000 EACH O 1.000 EACH AMOUNT 1,400.000 . 2,300.000 . 1,920.000 . SUBTOTAL FOR 6 OFF -SITS 8,400.00 2,300.00 1,920.00 38,990.60 9" HAM BASE COURSE 1 1/2' BIT CONC BINDER CL I 1 1/2' BIT CONC SURFACE CL I PAVT MILLING (BOTT JOINT) EXCAVATION FOR WIDENING 7JGT1o'i 5 TO 7qr t S fere -- .) i Q L) log ( -74-i S IZ_ Q S5.7- 4 n,.• 10— /tTo. ESr 1= pie o-rAc_ i2F_4.. A:'•ll 144 I/J �F z O 380.000 3Y 3' 16.500 O 380.000 BY 12a 2.250 O 465.000 3Y UrpS 2.450 O 85.000 3Y i✓S 8.600 0 1.000 LS I 1,000.000 SUBTOTAL FOR 7 McCARTHY 6,270.00 855.00 1,139.25 731.00 1,000.00 9,995.25 a col 1 ". 855 o ,137•:' O 131.1. 1,000 O q,9 ;1;47J2-1Cii4-44-l....- 7-0774 c- (4., 4 Z 4 —� Go Ce_ Lo sr CDS i C.4).>7 Ca. 1 or= G? _7 t i Al o • .Z wl r�- w,uati� �1 /, oao,796.o5- 0,0175-,S47.s ) o, OO ( o. co, 5:57, 55,1 -*So (-04 . i4 g (15t) � , 0,+4,4e 514,753,5 -K 773,953.c* —r-c. - d:::),. n✓4 -L 7T,77 -L- (e., /as% cos— ca. 13.5% CZ 5` Ca, 1 �S Mr1r1.s( de) 16C L+_ �.2 m C:Z 1T r.! o '7 O.., r =5� 1 coy"- Cul tr..0.-re,4 %•c, : ,) /..2, 3/V. � � ZroS, X93. 2510 ao,-1-75,4SC 1131SV4• o'{ NOTE: TERNS: oft.Hj141 I-S7. or- COS'- 7v ro- 2= G/it, is ,ice /, 5-4/ /, 310. 37 87,•`x3 , yd 50g, 98q, . B5 If this proposal meets with your approval and you desire to enter into a by signing and returning to us the original and one copy of this proposal upon, but not before, acceptance by us. Upon acceptance, a duly executed to you. This proposal may be withdrawn by us if not accepted within 9 y7, So7 . / a contract, please so indicate which shall become a contract counterpart will be returned days Paym:ant in full due upon completion of vork covered herein, unless prior terms have been agreed upon, and made a part of this contract in writing. Amounts not paid within that time period shall be subject to a service charge equal to 1.5% per month on the unpaid amount. ACCEPTANCE — BUYER: __A ■■ ..,..... .irie hereof are wnreeable B:CO SULT NG ENGtNEERS/SURVEYYORS INC. Hireskom FMAkt- S IT-F- v-No ,2.� c zT T- 0-1= iT April 24, 1995 Rev. 9-14-95 Job No. 92012A F:IDATA\92012a\LOTUS\quant95 - 2 FINAL ENGINEER'S QUANTI ESTIMATE FOR SITE DEVELOPMENT 0 EROSION & CONTROL PLAN LE7'Cc,...2. Oki AO, 01 iC ��► NO. ITEM I UNI QUANTITYI UNIT COST TOTAL AMOUNT Rrva�u GRADING 1 Site Clearing 2 Demolition 3 Tree Removal o LS LS o LS 11 $20,000.001 $20,000.00 11 $10,000.001 $10,000.00 11 $10,000.001 $10,000.00 4 5 Topsoil Excavation Earth Excavation o I CY 19 O. $1.20 aa8.00 8'30 CY © -I $1.75 1 p - 6 Borrow Excavation I(o-7 5 CY $1.751 p 7 8 Topsoil Repl., 6" Seeding SY 17,950 $2.84 $50, 978.00 0 AC 4 $3,500.00 $15,260.00 9 Geotextile Fabric o SY 100 $2.00 $200.00 10 Silt Fence cosy LF 0a.0 $1.25 as�� .3Y.�r�:szs orz.Ac 11A -c L.- TOTAL GRADING ru�a,tis $197,434.25 cxr,■•1.a3 STORM SEWER 1 30" Dia. RCP LF 901 $30.00 $2, 700.00 2 18" Dia. RCP 0 1 LF 01 $18.00 co 3 15" Dia. RCP o LF $15.00 0 .ea 4 48" Dia. Manhole o 1 EA 01 $950.00 30" Conc. End Section o EA 21 $750.00 $1,500.00 6 15" Conc. End Section 0 1 EA -01 $480.00 0 .Co ORzz'(c.114A\ TOTAL STORM SEWER $14,880.00 SUMMARY 4, aoa GRADING STORM SEWER I 04,341-7. .25 LI, ace, .00 Orz.,�1 4- I--. rL T o,= L,z =o,7- 1-4 L -TOn1S o nasr A ti 7JG-'1 O.J 1+ 5 1. i TOTAL. 7Z.r- /...lh i.l Lt. C1 67, .uas ,/c- 7fOVFST•� TOTAL 1 58?.aS Contingency -. L .�,r- I (.1,V. (e.i S'.) Co' Ce._ f >s" C ©S - COS-- co_ y ( IaS°'o� Lr 'T =-_2 A.-f 0 . COS. 7- co.un.A.0 .;c..P. 1,'-15�o� -SC Las" et) g-1.5et3.40( .381 . �S 4 3E. 34:, *3,9 45.3 i ( ya31 . ? i ) Ily,Coq ( 1'73, es-4. 04 )