Loading...
R-467-96 10/28/96ITEM V.C.6. VILLAGE OF LEMONT RESOLUTION NO. / O6 7 DATE OF APPROVAL /i -c16 RESOLUTION REQUESTING A VARIANCE TO VILLAGE OF LEMONT DESIGN STANDARDS AND APPROVAL OF ALTERNATE STORMWATER PLAN (Chestnut Crossing Subdivision) WHEREAS, the developer of Chestnut Crossing Subdivision is seeking to revise the original stormwater plan for the project as a result of involvement by the U.S. Army Corps of Engineers; and WHEREAS, this proposed alternative plan is based on increasing the depth of the existing pond along Archer Avenue; and WHEREAS, the original design of the stormwater facility included a variation to the Village engineering standards to allow an increase in the depth of the pond in order to protect the ravine conservation area to the north of the pond; and WHEREAS, Rob Davis of Strand Associates indicates in a review letter that the plan proposed would allow the pond to function as originally designed. NOW THEREFORE, BE IT RESOLVED, by the President and Board of Trustees of the Village of Lemont that the President and the Clerk be and are hereby directed to approve the requested variation and allow the additional 1' increase in pond depth. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE O LEMONT, COUNTIE OF COOK, WILL AND DuPAGE, on this day of 1 Barbara Buschman Alice Chin Keith Latz Connie Markiewicz Rick Rimbo Ralph Schobert Approved by me this Attest: AYES NAYS PASSED ABSENT HARLENE SMOLLEN, Village Clerk Aft D A. K SNESKI , VILLAGE PRESIDENT ,1996. R ARLENE SMOLLEN, Village Clerk Prepared by: Planning Department Village of Lemont 418 Main Street Lemont, I1 60439 ti 7¢ • T.F..718.5 SEE SHEET 11 FOR - DEiENT10N BASIN ti NORTH LINE OF /1/ / j; ROADWAr CON RU,tTIC _ , WN'YIL PRQ¢ER• Y. NE ) 27 +95.93 TO EXISTING BE BUILDABLE UNTIL RI FOR WORK WITHIN THE 1. THE AREA OF DISTRI 15' IN WIDTH. 2. NO TREES OVER 4'0 LOT 38 POP PI \ i wiu >v n e Rat 701.31 PoP.« MD. Aau nM fv. xa.o• j1 31•fc e__`\ , LOT 14 \ i:'■ i an 1 , Y ALIT I/ It tat fiRd I"' /4, MY 707.74 wml .n MAL •\ Po. "LL \ 1 n .. PEEK Ala 4213... Pp. vaLued WM POLY N RPM your( row Rp11yp o•a..1.PaOKum. • lUK•rt 1.111K •PT M PP) j` MAO PaO an Paso 7ffN 11a• IAD LW U•7 Lee UPN Up A•• N USN 74N 70..• a.• 76.11• IS Ma U. •• aa• •w MLA MAN a•• OM Tow .•orw... WAN DETENTION POND AS -BUILT CHESTNUT CROSSING. PROP VStb 6 jarktIN PROPOSES 4AC.N PEAR • GRAPHIC SCALE ENGINEERING RESOURCE ASSOCIATES. I' DR•M.