Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R-33-98 05/11/1998
RESOLUTION K-33-61 RESOLUTION AUTHORIZING ADOPTION OF SUPPLEMENT NO. 1 TO AN ENGINEERING AGREEMENT WITH TRANSYSTEMS CORPORATION FOR PHASE II DESIGN ENGINEERING ON STATE STREET (PEIFFER AVENUE TO ILLINOIS STREET) WHEREAS, the Village of Lemont has committed resources to perform Phase II design engineering services for a section of State Street; and WHEREAS, the Village of Lemont has selected TranSystems Corporation to perform design engineering on this project; and WHEREAS, the Village has received FAU funding on the construction of this project; and WHEREAS, the Village has expanded the scope of services on this project requiring additional engineering services. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the attached Supplement No. 1 to the Engineering Agreement be approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this llth day of May , 1998. Barbara Buschman Keith Latz Connie Markiewicz Rick Rimbo Ralph Schobert Mary Studebaker AYES v NAYS PASSED AB S SENT ENE SMOLLEN, Village Clerk Approved by me this llth da, of Ma , 1998. Attest: HARD KWASNES ge President CHARLENE SMOLLEN, Village Clerk AMENDMENT NO. 1 AGREEMENT FOR CONSULTANT SERVICES between the VILLAGE OF LEMONT and TRANSYSTEMS CORPORATION State Street Improvements Peiffer Avenue to Illinois Street Section No.: 93- 00021 -00 -PV Project No.: STPM -7003 (245) Job No.: D -91- 159 -95 Type of Funding: STU Existing Structure: N/A DESCRIPTION Design engineering services for improvements to State Street from Peiffer Avenue to Illinois Street, a distance of 1040 meters, in the Village of Lemont, Cook County, Illinois. AMENDMENT NO. 1 FOR CONSULTANT SERVICES FOR THE STATE STREET IMPROVEMENT This AMENDMENT No. 1 to the original AGREEMENT is made this day of , 1998 by and between the Village of Lemont, hereinafter referred to as the VILLAGE, and TranSystems Corporation, 1051 Perimeter Drive, Suite 1025, Schaumburg, Illinois, 60173, as the CONSULTANT, for professional engineering services required by the VILLAGE for the preparation of contract plans and documents in connection with construction of State Street from Peiffer Avenue to Illinois Street, a distance of 1040 meters, hereinafter referred to as the PROJECT. The original agreement enacted June 9, 1997 and authorized September 8, 1997 remains in place except for the items discussed in this AMENDMENT. The circumstances which necessitate this amendment were not reasonably foreseeable at the time the agreement was signed. This AMENDMENT is to include the modifications to the contract plans and documents not previously anticipated. The limit of compensation will be increased by $22,632 to not exceed the amount of $96,476. The fixed fee shall be increased by $2,374 to $11,175. The maximum retainage shall be increased to $2,888. In WITNESS WHEREOF, the parties hereto have caused the execution of this AMENDMENT by their duly authorized officers as of the day and year first above written. (SEAL) ATTEST: (SEAL) ATTEST: GE OF LEMONT President TRANSYSTEMS CORPORATION By: Vice President STATE OF ILLINOIS DRUG FREE WORKPLACE CERTIFICATION This certification is required by the Drug Free Workplace Act (111. Rev. Stat., ch. 127, par. 152.311). The Drug Free Workplace Act, effective January 1, 1992, requires that no grantee or contractor shall receive a grant or be considered for the purposes of being awarded a contract for the procurement of any property or services from the State unless that grantee or contractor has certified to the State that the grantee or contractor will provide a drug free workplace. False certification or violation of the certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of the contract or grant and debarment of contracting or grant opportunities with the State for at least one (1) year but not more than five (5) years. For the purpose of this certification, "grantee" or "contractor" means a corporation, partnership, or other entity with twenty -five (25) or more employees at the time of issuing the grant, or a department, division, or other unit thereof directly responsible for the specific performance under a contract or grant of $5,000 or more from the State. The contractor /grantee certifies and agrees that it will provide a drug free workplace by: (a) Publishing a statement: (1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance, including cannabis, is prohibited in the grantee's or contractor's workplace. (2) Specifying the actions that will be taken against employees for violations of such prohibition. (3) Notifying the employee that, as a condition of employment on such contract or grant, the employee will: (A) abide by the terms of the statement; and (B) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5) days after such conviction. (b) Establishing a drug free awareness program to inform employees about: (1) the dangers of drug abuse in the workplace; (2) the grantee's or contractor's policy of maintaining a drug free workplace; (3) any available drug counseling, rehabilitation, and employee assistance programs; and (4) the penalties that may be imposed upon an employee for drug violations. (c) Providing a copy of the statement required by subparagraph (a) to each employee engaged in the performance of the contract or grant and to post the statement in a prominent place in the workplace. (d) Notifying the contracting or granting agency within (10) days after receiving notice under part (B) of paragraph (3) of subsection (a) above from an employee or otherwise receiving actual notice of such conviction. (e) Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by, any employee who is so convicted, as required by section 5 of the Drug Free Workplace Act. (f) Assisting employees in selecting a course of action in the event drug counseling, treatment, and rehabilitation is required and indicating that a trained referral team is in place. (g) Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act. THE UNDERSIGNED AFFIRMS, UNDER PENALTIES OF PERJURY, THAT HE OR SHE IS AUTHORIZED TO EXECUTE THIS CERTIFICATION ON BEHALF OF THE DESIGNATED ORGANIZATION. TranSystems Corporation Printed Name of Organization Signature of Authorized Representative Vito P Sammarco - Vice President Printed Name and Title N/A Requisition/Contract/Grant ID Number 1//7/q6 Date EXHIBIT A SCOPE OF ENGINEERING SERVICES 4. Supplemental Soils Investigations • Additional soils investigations to obtain data on the limits of rock excavation for the construction of the storm sewer along Cass Street. 5. Public Informational Meeting • Preparation of exhibits, brochure and fact sheet for use at the open house public meeting. • Attendance by the project manager, project engineer and resident inspector at the open house public meeting. EXHIBIT B COST ESTIMATE OF CONSULTANT SERVICES • ORIGINAL • AMENDMENT NO. 1 ROUTE FAU 2632 PROJECT State Street SECTION 93 -00021 -00 -PV COUNTY Cook JOB NO. STPM -7003 (244) ORIGINAL SHEET 1 OF 3 FIRM TranSystems Corporation '] ......................... OVERHEAD RATE: 140.89% DATE: June 2, 1997 COMPLEXITY FACTOR 0 ITEM MANHOURS (A) PAYROLL (B) OVERHEAD & FRINGE BENF (C) IN-HOUSE DIRECT COSTS (D -1) OUTSIDE DIRECT COSTS (D -2) FIXED FEE (E) SERVICES BY OTHERS (F) TOTAL (G) % GRAND TOTAL (H) 1. Project Coordination 46 1,125 1,585 - - 375 - 3,085 4.2% 2 Supplemental Field Survey 56 1,016 1,431 96 - 353 - 2,896 3.9% 3 Preliminary Roadway Plans 784 15,217 21,439 4,375 432 5,709 - 47,172 63.9% 4 Preliminary Contract Documents 72 1,656 2,333 - 100 552 - 4,641 6.3% 5 Prefinal Contract Plans & Documents 166 3,440 4,847 750 600 1,256 - 10,893 14.8% 6 Final Contract Plans and Documents 72 1,557 2,194 250 600 556 - 5,157 7.0% TOTALS 1,196 24,011 33,829 5,471 1,732 8,801 - 73,844 100.0% G:\BUSDEV\LEMONI \STATE \[CECS0601.XLS]d rect ROUTE 1 PROJECT SG SECTION 93- wu21 -00 -PV COUNTY Cook JOB NO. STPM -7003 (244) ��nNAL .............................. .............................. .............................. SHEET 2 OF 3 TranSystens Corporation DATE: June 2, 1997 PAYROLL CLASSIFICATION AVG HOURLY RATES ITEM I Project Coordination and Administration ITEM 2 Supplemental Field Survey ITEM 3 Preliminary Roadway Plans ITEM 4 Preliminary Contract Documents ITEM 5 Prefinal Contract Plans & Documents HOURS % PART. WGTD RATE HOURS % PART. WGTD RATE HOURS % PART. WGTD RATE HOURS s% PART. WGTD RATE HOURS % PART. WGTD RATE Principal In Charge 45.00 2 4.4 $1.96 0 0.0 $0.00 6 0.8 $0.35 2 2.8 $1.25 2 1.2 $0.54 Project Manager 34.64 4 8.7 $3.01 0 0.0 $0.00 8 1.0 $0.35 4 5.6 $1.93 6 3.6 $1.25 Chief Structural Engineer 35.76 0 0.0 $0.00 0 0.0 $0.00 0 0.0 $0.00 0 0.0 $0.00 0 0.0 $0.00 Senior Project Engineer 29.88 8 17.4 $5.20 4 7.1 $2.13 54 6.9 $2.06 12 16.7 $4.98 24 14.5 $3.69 Project Engineer 25.52 16 34.8 $8.88 4 7.1 $1.82 66 8.4 $2.15 12 16.7 $4.25 22 13.3 $3.38 Design Engineer III 22.64 0 0.0 $0.00 0 0.0 $0.00 48 6.1 $1.39 16 22.2 $5.03 12 7.2 $1.64 Design Engineer II 19.20 8 17.4 $3.34 0 0.0 $0.00 112 14.3 $2.74 10 13.9 $2.67 22 13.3 $2.51 Design Engineer 1 18.64 0 0.0 $0.00 0 0.0 $0.00 118 15.1 $2.81 0 0.0 $0.00 10 6.0 $1.09 Survey Crew Chief 18.96 0 0.0 $0.00 24 42.9 $8.13 0 0.0 $0.00 0 0.0 $0.00 0 0.0 $0.00 Senior Engineering Tech. 18.08 0 0.0 $0.00 0 0.0 $0.00 78 10.0 $1.80 0 0.0 $0.00 36 21.7 $3.92 CADD Technician II 16.76 0 0.0 $0.00 0 0.0 $0.00 146 18.6 $3.12 0 0.0 $0.00 20 12.1 $2.02 CADD Technician I 14.16 0 0.0 $0.00 24 42.9 $6.07 136 17.4 $2.46 8 11.1 $1.57 8 4.8 $0.68 Word Processor/ Admin. 11.88 8 17.4 $2.07 0 0.0 $0.00 12 1.5 $0.18 8 11.1 $1.32 4 2.4 $0.00 TOTALS 46 100.0 $24.46 56 100.0 $18.15 784 100.0 $19.41 72 100.0 $23.00 166 100.0 $20.72 PAYROLL CLASSIFICATION AVG HOURLY RATES ITEM 6 Final Contract Plans and Documents TOTALS HOURS % PART. WGTD RATE HOURS % PART. WGTD RATE Principal In Charge 45.00 0 0.0 $0.00 12 1.0 $0.46 Project Manager 34.64 4 5.6 $1.93 26 2.2 $0.77 Chief Structural Engineer 35.76 0 0.0 $0.00 0 0.0 $0.00 Senior Project Engineer 29.88 8 11.1 $3.32 110 9.5 $2.82 Project Engineer 25.52 12 16.7 $4.25 132 11.3 $2.89 Design Engineer III 22.64 8 11.1 $2.52 84 7.2 $1.63 Design Engineer 11 19.20 8 11.1 $2.13 160 13.8 $2.64 Design Engineer I 18.64 4 5.6 $1.04 132 11.3 $2.11 Survey Crew Chief 18.96 0 0.0 $0.00 24 2.1 $0.39 Senior Engineering Tech. 18.08 12 16.7 $3.01 126 10.8 $1.96 CADD Technician II 16.76 8 11.1 $1.86 174 15.0 $2.51 CADD Technician I 14.16 8 11.1 $1.57 184 15.8 $2.24 TOTALS 72 100.0 $21.63 1164 100.0 $20.42 ORIGINAL State Street Village of Lemont Cook County Sheet 3 of 3 Direct Cost Summary 2 Supplemental Field survey Vehicle Expense 3 days © $ 32.00 per day $ 96.00 Subtotal $ 96.00 3. Preliminary Contract Plans Blueline Copies 54 sheets 10 copies © $ 0.80 /sheet $ 432 CADD 350 hours $12.50 per hour Subtotal 4. Preliminary Contract Documents $ 4,375 $ 4,807 Xerox Copies 100 sheets 10 copies $ 0.10 /sheet $ 100 Subtotal $ 100 5. Prefinal Contract Plans and Specifications Blueline Copies 60 sheets 10 copies © $ 0.80 /sheet $ 480 Xerox Copies 120 sheets 10 copies @ $ 0.10 /sheet $ 120 CADD 60 hours $ 12.50 per hour $ 750 Subtotal $ 1,350 Final Contract Plans and Specifications g Blueline Copies b 60 sheets 10 copies@ $ 0.80 /sheet $ 480 4. F Xerox Copies z 120 sheets 10 copies @ $ 0.10 sheet $ 120 0 L a CADD 0 20 hours $ 12.50 /hour $ 250 9 Subtotal $ 850 v TOTAL DIRECT COSTS $ 7,203 ROUTE FAU 2632 (State Street) PROJECT STPM- 7003(245) SECTION 93- 00021 -00 -PV COUNTY Cook JOB NO. D -91- 159 -95 Amendment No. 1 SHEET 1 OF 3 FIRM TranSvstems Corporation OVERHEAD RATE: 148.35% DATE: April 15, 1998 COMPLEXITY FACTOR: 0 ITEM MANHOURS (A) PAYROLL (B) OVERHEAD & FRINGE BENF (C) IN -HOUSE DIRECT COSTS (D -1) OUTSIDE DIRECT COSTS (D -2) FIXED FEE (E) SERVICES BY OTHERS (F) TOTAL (G) % OF GRAND TOTAL (H) Participating Items 1. Retaining Wall Design 80 1,730 2,566 480 - 647 - 5,423 36.7% 2. Supplemental Soils Investigation 12 258 383 - - 86 2,700 3,427 23.2% 3. Public Informational Meeting 78 1,975 2,930 310 - 704 - 5,919 40.1% Sub -Total Participating 170 3,963 5,879 790 - 1,436 2,700 14,768 100.0% Non - Participating Items 4. Sanitary Sewer Replacement 96 2,076 3,080 580 - 776 - 6,512 82.8% 5. Traffic Signal Modifications 20 431 639 120 - 161 - 1,351 17.2% Sub -Total Non- Participating 116 2,507 3,719 700 - 938 - 7,864 100.0% TOTALS 286 6,470 9,598 1,490 - 2,374 2,700 22,632 100.0% 0: \BUSDEV \LEMON? \ STATE \laddn0415. xlslcccs ROUTE FAU 2632 (State Street) PROJECT STPM- 7003(245) SECTION 93- 00021 -00 -PV COUNTY Cook JOB NO. D -91- 159 -95 Amendment No. 1 SHEET 2 OF 3 TranSystems Corporation DATE: April 15, 1998 PAYROLL CLASSIFICATION AVG HOURLY RATES ITEM 1 Retaining Wall Design ITEM 2 Supplemental Soils Investigation ITEM 3 Public Informational Meeting ITEM 4 Sanitary Sewer Replacement ITEM 5 T affic Signal Modifications HOURS % PART. WGTD RATE HOURS % PART. WGTD RATE HOURS % PART. WGTD RATE HOURS % PART. WGTD RATE HOURS % PART. WGTD RATE Principal In Charge 45.00 0 0.0 80.00 0 0.0 $0.00 4 5.1 $2.31 0 0.0 $0.00 0 0.0 $0.00 Project Manager 34.64 0 0.0 80.00 0 0.0 $0.00 8 10.3 $3.55 4 4.2 $1.44 0 0.0 $0.00 Chief Structural Engineer 35.76 6 7.5 82.68 0 0.0 80.00 0 0.0 80.00 0 0.0 $0.00 0 0.0 $0.00 Senior Project Engineer 29.88 8 10.0 $2.99 0 0.0 $0.00 16 20.5 $6.13 10 10.4 $3.11 0 0.0 $0.00 Project Engineer 25.52 10 12.5 $3.19 0 0.0 $0.00 16 20.5 $5.23 16 16.7 $4.25 2 10.0 $2.55 Design Engineer III 22.64 10 12.5 82.83 8 66.7 $15.09 6 7.7 $1.74 16 16.7 $3.77 12 60.0 $13.58 Design Engineer II 19.20 8 10.0 $1.92 4 33.3 $6.40 0 0.0 $0.00 8 8.3 $1.60 0 0.0 80.00 Design Engineer I 18.64 6 7.5 $1.40 0 0.0 80.00 0 0.0 $0.00 10 10.4 $1.94 0 0.0 $0.00 Survey Crew Chief 18.96 0 0.0 $0.00 0 0.0 $0.00 0 0.0 $0.00 0 0.0 $0.00 0 0.0 $0.00 Senior Engineering Tech. 18.08 14 17.5 $3.16 0 0.0 $0.00 20 25.6 $4.64 14 14.6 $2.64 6 30.0 $5.42 CADD Technician II 16.76 8 10.0 $1.68 0 0.0 $0.00 8 10.3 81.72 8 8.3 81.40 0 0.0 $0.00 CADD Technician I 14.16 10 12.5 $1.77 0 0.0 $0.00 0 0.0 $0.00 10 10.4 $1.48 0 0.0 $0.00 Word Processor/ Admin. 11.88 0 0.0 $0.00 0 0.0 80.00 0 0.0 $0.00 0 0.0 $0.00 0 0.0 $0.00 TOTALS 80 100.0 821.62 12 100.0 $21.49 78 100.0 825.32 96 100.0 $21.63 20 100.0 $21.55 PAYROLL CLASSIFICATION AVG HOURLY RATES TOTALS HOURS % PART. WGTD RATE Principal In Charge 45.00 4 1.4 $0.63 Project Manager 34.64 12 4.2 $1.45 Chief Structural Engineer 35.76 6 2.1 80.75 Senior Project Engineer 29.88 34 11.9 83.55 Project Engineer 25.52 44 15.4 83.92 Design Engineer III 22.64 52 18.2 $4.12 Design Engineer II 19.20 20 7.0 $1.34 Design Engineer I 18.64 16 5.6 81.04 Survey Crew Chief 18.96 0 0.0 $0.00 Senior Engineering Tech. 18.08 54 18.9 $3.41 CADD Technician II 16.76 24 8.4 81.41 CADD Technician I 14.16 20 7.0 $0.99 Word Processor/ Admin. 1 1.88 TOTALS 286 100.0 $22.61 EXHIBIT C SUBCONSULTANT SERVICES SCHLEEDE HAMPTON ASSOCIATES .e CONSULTING ENGINEERS November 20, 1997 Ms. Grace Dysico Transystems Corporation 1051 Perimeter Drive Suite 1025 Schaumburg, Illinois 60173 Re: Proposal for Geotechnical Exploration Cass Avenue Storm Sewer State Street to Lemont Street Lemont Illinois Dear Ms. Dysico: We are pleased to have the opportunity to submit the following proposal for performance of soil borings for the proposed improvements on the referenced project. Project Description and Scope of Work Proposed improvements along the alignment are to include construction of approximately 137 meters (450 lineal feet) storm sewer in the traffic lane along Cass Avenue. This work is tied to the proposed State Street storm sewer for which SHA conducted geotechnical explorations in June 1996 and February 1997. The sewer is estimated to be constructed at a depth of 4.0 to 4.6 meters (13 to 15 feet) below the existing pavement. Method of Performance - Fie!d Work Borings will be conducted in the roadway along the proposed sewer alignment at two (2) locations as directed. The borings will be advanced through the pavement to a nominal depth of 0.46m( 1.5 ft) feet below the proposed invert elevation of the storm sewer. Split spoon samples will be obtained at 2.5 foot intervals to the extent of the boring. Where spoon refusal is encountered, we will setup and core to a nominal depth below the proposed invert elevation to verify the presence and condition of bedrock. Prior to commencement of the work we would request that the proposed storm sewer mainline invert depths (from the existing ground surface) and manhole structure locations be provided for review so that boring locations and depths be determined. FROM / 102 WEST ILLINOIS STREET, SUITE D 1612 LANDMEIER ROAD, UNIT C 4041 ALBANY STREET, UNIT 4 REPLY 0 ST. CHARLES, ILLINOIS 60174 g ELK GROVE VILLAGE, ILLINOIS 60007 0 McHENRY, ILLINOIS 60050 TO: 630/377 -3270 • FAX: 630/377 -3585 847/228 -1079 • FAX: 847/228 -0633 815/385 -8351 • FAX: 815/385 -8456 SCHLEEDE HAMPTON ASSOCIATES, INC. CONSULTING ENGINEERS Method of Performance - Analysis and Report The boring and field test data will be summarized on boring logs. Information will include the depth from ground surface to sample refusal, Standard Penetration, N values for split spoon samples and Rock Quality Designation, RQD for core samples. A written report summarizing conditions encountered will be prepared by a Professional Engineer, licensed in the State of Illinois. Timing and Fee We will begin on work after notice to proceed. Based on our discussions we have tentatively scheduled the work for the first week of December. We plan on mobilizing and doing all the borings concurrently. We propose to provide this work at the unit rates quoted on the attached Schedule of Services and Fees, Attachments 1.1 and 1.2. These estimated quantities and unit rates are based on information as outlined in this proposal and experience on past projects. On the basis of the above information, we estimate that these services can be provided for a fee of: $ 2,700.00 General For this project, we will assign Mr. Stephen C. Schleede, P.E. as Principal in Charge and Mr. William D. Prigge, P.E. as Project Manager. They and our staff are acquainted with the local subsurface conditions and have participated in the planning, development and execution of numerous highway soil explorations in this area. We are looking forward to working with you on this project. Respectfully submitted, SCHLEEDE - HAMPTON ASSOCIATES, INC. William D. P ge, P.E. / / Project M. T•er Ste • en . Schleede, P.E. Principal WDP /SCS /kg Enclosure: Attachments 1.1 and 1.2 SCHLEEDE HAMPTON ASSOCIATES, INC. CONSULTING ENGINEERS ATTACHMENT 1.1 SCHEDULE OF SERVICES AND FEES STRUCTURE BORINGS FOR STORM SEWER Item Estimated Quantity Unit Cost Extension Mobilization of Drilling equipment, and personnel, lump sum 1 $ 250.00 $ 250.00 Traffic Control, lump sum 1 $ 250.00 $ 250.00 Soil borings with split spoon sampling, rock core set up, core and sample rock, lump sum, 1 $1,200.00 $ 1,200.00 Engineering Services for Soil Survey and Pavement Coring Including; Layout Coordination Utility Clearance and Permits Field Engineer /Geologist to Monitor Drilling Preparation of Boring Logs Analysis and Report Preparation Consultation Estimated Cost (I Unit Rates Listed on Attachment 1.2) $ 1.000.00 TOTAL $ 2,700.00 • SCHLEEDE HAMPTON ASSOCIATES, INC. CONSULTING ENGINEERS ATTACHMENT 1.2 ENGINEERING SERVICES Our fees for Engineering Services will be based on the actual number of hours required to complete the work, and will be determined on a Unit Rate Basis at these rates for each classification of personnel: Est. Quantity Rate Per Hour Extension Principal Engineer, per hr. 0 $ 105.00 $ 0.00 Project Engineer, per hr. 4 $ 95.00 $ 380.00 Staff Engineer, per hr. 2 $ 70.00 $ 140.00 Field Engineer, per hr. 8 $ 60.00 $ 480.00 Draftsman/Tech., per hr. 0 $ 35.00 $ 0.00 Total $1,000.00