Loading...
R-92-98 Authorizing letter of credit reduction for Oak Tree subdivisionRESOLUTION NO. RESOLUTION AUTHORIZING LETTER OF CREDIT REDUCTION FOR OAK TREE SUBDIVISION WHEREAS pursuant to the Subdivision Regulations, an owner or developer of a subdivision is required to deposit certain security or evidence thereof with the Village of Lemont to guarantee the installation of such improvements; and WHEREAS in the matter of Oak Tree Subdivision, located at the northwest corner of Archer Avenue and Parker Road, an Irrevocable Letter of Credit #60/87, Southwest Federal Savings, in the amount of $1,152,713.75 was deposited with the Village of Lemont on April 5, 1996; and WHEREAS Ranquist Home Builders has made application for a sixth reduction of the Irrevocable Letter of Credit #60/87 in the amount of $53,877.56; and WHEREAS a duly authorized agent of the Village of Lemont has inspected certain portions of the improvement and has found these portions to have been satisfactorily installed; NOW, THEREFORE BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont that the Irrevocable Letter of Credit No. 60/87 for Oak Tree Subdivision is hereby reduced to $136,226.78. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DU PAGE, ILLINOIS, on this 26th day of October.. 1998. AYES NAYS PASSED ABSENT Barbara Buschman Keith Latz Connie Markiewicz Rick Rimbo Ralph Schobert Mary Studebaker Approved by me this 26th Attest: 10 1 f// ENE M. SMOLLEN, Village Clerk / .kb 1'% LENS M. SMOLLEN, Village C erk Prepared by: Planning Department Village of Lemont 418 Main Street Lemont, 11 60439 doc.id.oaktree.loc bid 141=12.121:0T 866T S0 1-30 NESKI, Village Preside= 8S60 £bZ 0£9 '0N BNOHd : NOad Mayor ' Richard A. Kwasneski Village Clerk Charlene M. Smollen Administrator Steven A. Jones LEMONT Village of Faith 418 Main Street • Lemont, IL 60439 -3788 (630) 257 -1550 Fax (630) 257 -1598 email: vlemont @aol.com Memorandum To: Scott Buening Community Development Memorandum From: Joanna Littrell Village Engineer Date: October 1, 1998 Reference: Oak Tree Subdivision Letter of Credit - Reduction No. 6 Trustees Barbara Buschman Keith Latz Connie Markiewicz Rick Rimbo Ralph Schobert Mary Studebaker On September 18, 1998, I received a request from Ranquist Home Builders for a reduction in their Letter of Credit for Oak Tree Subdivision. Public Works and myself conducted a site inspection for the items requested and recommend only the generator building, sidewalk and partial release of retainage for water and sanitary. The following is a breakdown of the request: Present Letter of Credit: $190,104.34 Work Completed: $ 29,370.41 10% Retainage: $ 2,937.03 W/S Retainage Release (50 %) $ 27,444.18 Total Release: $ 53,877.56 Remaining Letter of Credit: $136,226.78 I recommend that Letter of Credit be reduced in the amount of $53,877.56. September 18, 1998 Joanna S. Littrell, P.E. Village Engineer Village Of Lemont 418 Main Street Lemont, IL 60439 -3788 Dear Joanna, BUILDER DEVELOPER On the following page is a breakdown of the remaining Letter of Credit balance and our draw request. Twelve sidewalks of twenty -one have been completed. As we agreed previously, the funds held relating to the Water & Sewer System (including retention) will be released to us after turning over this system to the Village. Are we at the point where we can draw on these funds? My calculation of the Water & Sewer System as a percentage of all letter of credit items (excluding the LC fee) comes out to just over 50 %. How soon will you be able to process this Letter of Credit reduction? Let me know if you need anymore information from me. Thank you for your attention to this matter. Sincerely, Peter J. Karavas Vice President cc. Scott Buening, AICP, Village Planner 1 - 158th Place, Calumet City, Illinois 60409 708 -201 -7250 FAX: 708- 201 -7251 RCRJOAK TREE ASSOCIATES, INC. LETTER OF CREDIT FUNDS REMAINING IN OAK TREE PROJECT • DETAIL DRAW #10 BALANCE BALANCE REQUEST Sanitary Sewer Gemerator Building (Linden) 7,000.00 7,000. ✓ Restoration 6,500.00 6,500.00,/ Total Sanitary Sewer 13,500.00 Roadway 1.5" Bit. Surface Course 18,444.00 Sidewalk (12 of 21 complete) 32,333.65 Total Roadway Earthwork Soil Erosion / Storm Control 50,777.65 2,240.00 2,240.00 == 2,240.00 Construction Totals 66,517.85 Retention Held (Release port 7 t o c_ut Sewer & Water Sxstem atter of Credit Fee for RCR! Oak Tree Assoc., sating to 92,022.28 ai Remaining In Letter of Credit ■∎6 J 0,J , < 5 \ Total Draw Request 31,564.41 12,992.00 1\;0 190,104.34 91,239.47 \. LETTER OF CREDIT PROJECT: Oak Tree LAST UPDATE: September 29, 1998 REDUCTION NUMBER: 6 CATEGORY QUANTITY COST ITEM UNIT ORIGINAL RELEASE TO DATE PRESENT THIS REQUEST REMAINING UNIT COST ORIGINAL RELEASE TO DATE PRESENT THIS REQUEST REMAINING SANITARY SEWER _ 8" PVC (6' - 12' deep) LF 1452 1452 0 0 0 $13.00 $18,876.00 $18,876.00 $0.00 $0.00 $0.00 8" PVC (13' - 20' deep) LF 908 908 0 0 0 $15.00 $13,620.00 $13,620.00 $0.00 $0.00 $0.00 6" PVC Service LF 1634 1634 0 0 0 $11.00 $17,974.00 $17,974.00 $0.00 $0.00 $0.00 6" PVC Force Main LF 3246 3246 0 0 0 $13.00 $42,198.00 $42,198.00 $0.00 $0.00 $0.00 48" Dia. MH (6' - 12') EA 7 7 0 0 0 $1,270.00 $8,890.00 $8,890.00 $0.00 $0.00 $0.00 48" Dia. MH (13' - 20') EA 3 3 0 0 0 $1,500.00 $4,500.00 $4,500.00 $0.00 $0.00 $0.00 Lift Station and Generator LS 1 1 0 0 0 $71,000.00 $71,000.00 $71,000.00 $0.00 $0.00 $0.00 Generator Building (Linden) LS 1 0.5 0.5 0 0.5 $14,000.00 $14,000.00 $7,000.00 $7,000.00 $7,000.00 $0.00 Electrical LS 1 1 0 0 0 $3,200.00 $3,200.00 $3,200.00 $0.00 $0.00 $0.00 Air Release VV EA 1 1 0 0 0 $1,700.00 $1,700.00 $1,700.00 $0.00 $0.00 $0.00 72" Drop Manhole EA 1 1 0 0 0 $2,000.00 $2,000.00 $2,000.00 $0.00 $0.00 $0.00 Trench Backfill - Main Line LF 228 228 0 0 0 $30.00 $6,840.00 $6,840.00 $0.00 $0.00 $0.00 Trench Backfill - Services LF 749 749 0 0 0 $15.00 $11,235.00 $11,235.00 $0.00 $0.00 $0.00 Televise LF 2360 2360 0 0 0 $1.00 $2,360.00 $2,360.00 $0.00 $0.00 $0.00 Restoration LS 1 0 1 0 1 $6,500.00 $6,500.00 $0.00 $6,500.00 $0.00 $6,500.00 SUBTOTAL $224,893.00 $211,393.00 $13,500.00 $7,000.00 $6,500.00 STORM SEWER 12" RCP LF 964 964 0 0 0 $13.00 $12,532.00 $12,532.00 $0.00 $0.00 $0.00 12" RCP w/ 0-Ring LF 329 329 0 0 0 $14.30 $4,704.70 $4,704.70 $0.00 $0.00 $0.00 15" RCP LF 70 70 0 0 0 $15.00 $1,050.00 $1,050.00 $0.00 $0.00 $0.00 15" RCP w/ 0-Ring LF 371 371 0 0 0 $16.00 $5,936.00 $5,936.00 $0.00 $0.00 $0.00 18" RCP LF 664 664.032 0 0 0 $17.15 $11,388.15 $11,388.15 $0.00 $0.00 $0.00 18" RCP w/ 0-Ring LF 145 145 0 0 0 $17.15 $2,486.75 $2,486.75 $0.00 $0.00 $0.00 18" RCP Removal LF 891 891 0 0 0 $2.00 $1,782.00 $1,782.00 $0.00 $0.00 $0.00 18" PVC Pressure Pipe LF 775 775 0 0 0 $30.00 $23,250.00 $23,250.00 $0.00 $0.00 $0.00 21" RCP LF 150 150 0 0 0 $18.00 $2,700.00 $2,700.00 $0.00 $0.00 $0.00 12" ADS LF 349 349 0 0 0 $11.75 $4,100.75 $4,100.75 $0.00 $0.00 $0.00 21" ADS LF 110 110 0 0 0 $17.00 $1,870.00 $1,870.00 $0.00 $0.00 $0.00 24" ADS LF 576 576 0 0 0 $19.50 $11,232.00 $11,232.00 $0.00 $0.00 $0.00 4" PVC Conduit LF 40 40 0 0 0 $10.00 $400.00 $400.00 $0.00 $0.00 $0.00 Page 1 LETTER OF CREDIT PROJECT: Oak Tree LAST UPDATE: September 29, 1998 REDUCTION NUMBER: 6 CATEGORY QUANTITY COST ITEM UNIT ORIGINAL RELEASE TO DATE PRESENT THIS REQUEST REMAINING UNIT COST ORIGINAL RELEASE TO DATE PRESENT THIS REQUEST REMAINING 12" RCP FEES EA 4 4 0 0 0 $325.00 $1,300.00 $1,300.00 $0.00 $0.00 $0.00 15" RCP FEES EA 2 2 0 0 0 $345.00 $690.00 $690.00 $0.00 $0.00 $0.00 18" RCP FEES EA 2 2 0 0 0 $380.00 $760.00 $760.00 $0.00 $0.00 $0.00 24" RCP FEES EA 1 1 0 0 0 $400.00 $400.00 $400.00 $0.00 $0.00 $0.00 Remove Existing Manhole EA 2 2 0 0 0 $300.00 $600.00 $600.00 $0.00 $0.00 $0.00 Adjust Existing Manhole EA 1 1 0 0 0 $100.00 $100.00 $100.00 $0.00 $0.00 $0.00 48" CB EA 17 17 0 0 0 $850.00 $14,450.00 $14,450.00 $0.00 $0.00 $0.00 24" Inlet EA 10 10 0 0 0 $420.00 $4,200.00 $4,200.00 $0.00 $0.00 $0.00 48" Manhole EA 14 14 0 0 0 $850.00 $11,900.00 $11,900.00 $0.00 $0.00 $0.00 R and R 18" FEES EA 1 1 0 0 0 $220.00 $220.00 $220.00 $0.00 $0.00 $0.00 Trench Backfill LF 575 575 0 0 0 $11.00 $6,325.00 $6,325.00 $0.00 $0.00 $0.00 Cog Hill Offsite LS 1 1 0 0 0 $10,270.65 $10,270.65 $10,270.65 $0.00 $0.00 $0.00 Off Site TBF TON 3372 3372 0 0 0 $6.75 $22,761.00 $22,761.00 $0.00 $0.00 $0.00 SUBTOTAL $157,409.00 $157,409.00 $0.00 $0.00 $0.00 WATER MAIN 6" DIP LF 30 30 0 0 0 $13.00 $390.00 $390.00 $0.00 $0.00 $0.00 8" DIP LF 1600 1600 0 0 0 $14.00 $22,400.00 $22,400.00 $0.00 $0.00 $0.00 12" DIP LF 3894 3894 0 0 0 $21.00 $81,774.00 $81,774.00 $0.00 $0.00 $0.00 16" DIP LF 945 945 0 0 0 $32.00 $30,240.00 $30,240.00 $0.00 $0.00 $0.00 8" Valve and Vault EA 3 3 0 0 0 $1,100.00 $3,300.00 $3,300.00 $0.00 $0.00 $0.00 12" Valve and Box EA 3 3 0 0 0 $1,700.00 $5,100.00 $5,100.00 $0.00 $0.00 $0.00 Fire Hydrant EA 23 23 0 0 0 $1,450.00 $33,350.00 $33,350.00 $0.00 $0.00 $0.00 B -Box Valve and Conn. EA 41 41 0 0 0 $50.00 $2,050.00 $2,050.00 $0.00 $0.00 $0.00 1" Service LF 1658 1658 0 0 0 $9.00 $14,922.00 $14,922.00 $0.00 $0.00 $0.00 T. Backfill - Main Line LF 770 770 0 0 0 $10.00 $7,700.00 $7,700.00 $0.00 $0.00 $0.00 T. Backfill - Services LF 811 811 0 0 0 $8.00 $6,488.00 $6,488.00 $0.00 $0.00 $0.00 Restoration LS 1 0 1 1 0 $6,500.00 $6,500.00 $6,500.00 $0.00 $0.00 $0.00 SUBTOTAL $214,214.00 $214,214.00 $0.00 $0.00 $0.00 Page 2 LETTER OF CREDIT PROJECT: Oak Tree LAST UPDATE: September 29, 1998 REDUCTION NUMBER: 6 CATEGORY QUANTITY COST ITEM UNIT ORIGINAL RELEASE TO DATE PRESENT THIS REQUEST REMAINING UNIT COST ORIGINAL' RELEASE TO DATE PRESENT THIS REQUEST REMAINING ROADWAY Curb and Gutter (M3.12) LF 5018 5018 0 0 0 $7.25 $36,380.50 $36,380.50 $0.00 $0.00 $0.00 Curb and Gutter (B6.12) LF 219 219 0 0 0 $9.00 $1,971.00 $1,971.00 $0.00 $0.00 $0.00 1.5" Bit. Surface Course TON 696 0 696 0 696 $26.50 $18,444.00 $0.00 $18,444.00 $0.00 $18,444.00 1.5" Bit. Binder Course TON 696 696 0 0 0 $26.00 $18,096.00 $18,096.00 $0.00 $0.00 $0.00 10" Agg. Base Course SY 7924 7924 0 0 0 $5.50 $43,582.00 $43,582.00 $0.00 $0.00 $0.00 Prime Coat GAL 4401 4401 0 0 0 $0.50 $2,200.50 $2,200.50 $0.00 $0.00 $0.00 2" Bit. Surface Course TON 172 172 0 0 0 $45.00 $7,740.00 $7,740.00 $0.00 $0.00 $0.00 10" BAM SY 3069 3069 0 0 0 $15.00 $46,035.00 $46,035.00 $0.00 $0.00 $0.00 4" Agg. Base Course SY 3069 3069 0 0 0 $2.65 $8,132.85 $8,132.85 $0.00 $0.00 $0.00 Agg. Shoulder TON 609 609 0 0 0 $15.00 $9,135.00 $9,135.00 $0.00 $0.00 $0.00 R and R B6.24 EA 1 1 0 0 0 $600.00 $600.00 $600.00 $0.00 $0.00 $0.00 2" Curb Base SY 1454 1454 0 0 0 $0.50 $727.00 $727.00 $0.00 $0.00 $0.00 Saw Cut Existing LF 2940 2940 0 0 0 $1.85 $5,439.00 $5,439.00 $0.00 $0.00 $0.00 12" Thermoplast LF 801 801 0 0 0 $2.00 $1,602.00 $1,602.00 $0.00 $0.00 $0.00 4" Thermoplast LF 8292 8292 0 0 0 $0.75 $6,219.00 $6,219.00 $0.00 $0.00 $0.00 6" Thermoplast LF 273 273 0 0 0 $1.30 $354.90 $354.90 $0.00 $0.00 $0.00 R & R Sign Assembly EA 4 4 0 0 0 $200.00 $800.00 $800.00 $0.00 $0.00 $0.00 Remove Posts EA 2 2 0 0 0 $100.00 $200.00 $200.00 $0.00 $0.00 $0.00 Power Pole Relocation LF 1 1 0 0 0 $2,767.00 $2,767.00 $2,767.00 $0.00 $0.00 $0.00 Install Stop Sign EA 1 0 1 1 0 $150.00 $150.00 $150.00 $0.00 $0.00 $0.00 Bituminous Driveway SY 123 123 0 0 0 $25.50 $3,136.50 $3,136.50 $0.00 $0.00 $0.00 Traffic Control LF 1 1 0 0 0 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00 $0.00 Sidewalk SY 15725 0 15725 1966 13759 $2.35 $36,953.75 $4,620.10 $32,333.65 $16,496.33 $15,837.32 Street Lights EA 9 0 9 9 0 $2,000.00 $18,000.00 $18,000.00 $0.00 $0.00 $0.00 Off site Driveways SY 335 335 - 0 0 0 $12.00 $4,020.00 $4,020.00 $0.00 $0.00 $0.00 SUBTOTAL $282,686.00 $231,908.35 $50,777.65 $16,496.33 $34,281.32 EARTHWORK Topsoil Strip and Stockpile CY 580 580 0 0 0 $2.00 $1,160.00 $1,160.00 $0.00 $0.00 $0.00 Page 3 LETTER OF CREDIT PROJECT: Oak Tree LAST UPDATE: September 29, 1998 REDUCTION NUMBER: 6 CATEGORY QUANTITY COST ITEM UNIT ORIGINAL RELEASE TO DATE PRESENT THIS REQUEST REMAINING UNIT COST ORIGINAL RELEASE TO DATE PRESENT THIS REQUEST REMAINING Fine Grade Archer Ave. CY 3069 3069 0 0 0 $1.00 $3,069.00 $3,069.00 $0.00 $0.00 $0.00 Backfill Curbs (Archer) CY 580 580 0 0 0 $3.00 $1,740.00 $1,740.00 $0.00 $0.00 $0.00 Material Haul Off CY 2740 2740 0 0 0 $8.00 $21,920.00 $21,920.00 $0.00 $0.00 $0.00 Mulch Archer Ave. AC 1.1 0 1.1 1.1 0 $1,000.00 $1,100.00 $1,100.00 $0.00 $0.00 $0.00 Seeding Archer Ave. AC 1.1 0 1.1 1.1 0 $1,500.00 $1,650.00 $1,650.00 $0.00 $0.00 $0.00 Replace Fence LF 780 780 0 0 0 $10.00 $7,800.00 $7,800.00 $0.00 $0.00 $0.00 Straw Bale and Maintain LF 20 10 10 10 0 $2.50 $50.00 $50.00 $0.00 $0.00 $0.00 Soil Erosion /Storm Control LF 4480 2240 2240 0 2240 $1.00 $4,480.00 $2,240.00 $2,240.00 $0.00 $2,240.00 SUBTOTAL $42,969.00 $40,729.00 $2,240.00 $0.00 $2,240.00 ITEM TOTALS SANITARY SEWER $224,893.00 $211,393.00 $13,500.00 $7,000.00 $6,500.00 STORM SEWER $157,409.00 $157,409.00 $0.00 $0.00 $0.00 WATER MAIN $214,214.00 $214,214.00 $0.00 $0.00 $0.00 ROADWAY $282,686.00 $231,908.35 $50,777.65 $16,496.33 $34,281.32 EARTH WORK $42,969.00 $40,729.00 $2,240.00 $0.00 $2,240.00 CONSTRUCTION COST TOTALS $922,171.00 $855,653.35 $66,517.65 $23,496.33 $43,021.32 Page 4 SUMMARY ORIGINAL LETTER OF CREDIT RELEASE REQUEST TO DATE RETAINAGE TO DATE PRESENT LETTER OF CREDIT THIS REQUEST PREVIOUS RETAINAGE RETAINAGE RELEASED TOTAL RELEASE REMAINING LETTER OF CREDIT TOTAL RETAINAGE COST OF CONSTRUCTION $922,171.00 $855,653.35 $152,082.98 $23,496.33 $2,349.63 $43,102.05 $21,955.35 $43,102.05 $108,980.93 $65, 959.61 ESTABLISHED LETTER OF CREDIT $1,152,713.75 $106,566.69 $1,069,566.69 $190,104.34 $29,370.41 $2,937.03 $27,444.18 $53,877.56 $136,226.78 $82,449.51 • • r.v.cJJI If-1 / .4.4.4 ml , 4 4 4 ;--4---- 44.4 A A 4 A 4 ■■•■■•••■ L VAA A 4 L LPoia 4 .4 A 44 .4 .4 a 1 44 • .4 4 A .4 1 4 4 A A A .444 I/T. ASSISSI A