R-32-99 Imporovement by Municipality Under the Illinois Highway CodeAp
Illinois Department Resolution for Improvement by Municipality Construction
Under the Illinois Highway Code
of Transportation
President and Board of Trustees
BE IT RESOLVED, by the of the
Village
Council or President and Board of Trustees
of Lemont ,Illinois
City, Town or Village
that the following described street(s) be improved under the Illinois Highway Code:
Name of Thoroughfare
Route
From
To
127th at Archer
171
at 127th Street
FAP577
BE IT FURTHER RESOLVED,
1. That the proposed improvement shall consist of Realignment of 127th Street at Archer
Avenue including exclusive left turn lanes and traffic signal
G� and shall be constructed 36 feet wide
and be designated as Sectir, - "N 1 t coo nJ i G
2. That there is hereby appropriated the (additional) sum of
seventy five Dollars ($ 9 '775 ) for the
improvement of said section from the municipality's allotment of Motor Fuel Tax funds.
nine thousand, seven hundred and
3. That work shall be done by IDOT
(Specify Contract or Day Labor)
BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to
the district office of the Department of Transportation.
; and,
APPROVED
, 19
Department of Transportation
District Engineer
ov_: to For
ilthAgib3#144k0
IL 494 -0352
e
John
Mr. Charlene Smollen
I, Miss Clerk
Mrs.
in and for the Village of Lemont
(City, Town or Village)
County of Cook ,hereby certify the
foregoing to be a true, perfect and complete copy of a resolution adopted by
the President and Board of Trustees
(Council or President and Board of Trustees)
at a meeting on
(Council or President and Board of Trustees)
( "i`_{ , 1999
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this
day of
Antonopoulos (S E A L)
i
Village
rn•••■
Cler'
1
RESOLUTION R /S' gd
RESOLUTION APPROVING FUNDING FOR THE IMPROVEMENT OF
ARCHER AVENUE AT 127TH STREET
WHEREAS, the Village of Lemont has entered into an agreement with the State of
Illinois for the improvement of Route 171 (Archer Avenue), FAP Route 577, known
as State Section: 3114N, Village Section: at 127th Street; and
WHEREAS, in compliance with the aforementioned agreement, it is necessary for
the Village to appropriate sufficient funds to pay its share of the cost for said
improvement; and
WHEREAS, in order to facilitate the improvement of Illinois Route 171 known as
Archer Avenue, State Section 3114N, the Village of Lemont hereby approves the
plans and specifications for the proposed construction.
NOW, THEREFORE, BE IT RESOLVED, that there is hereby appropriated the
sum of $9,775, or so much thereof as may be necessary, from any money now or
hereafter allotted to the Village to pay its share of the cost of this improvement as
provided in the agreement; and
BE IF FURTHER RESOLVED, that upon award of the contract for this
improvement, the Village will pay to the Department of Transportation of the State
of Illinois, in a lump sum from any funds allotted to the Village, an amount equal to
95% if its obligation incurred under this agreement, and will pay to said
Department the remainder of its obligation (including any nonparticipating costs
for FA projects) in a lump sum, upon completion of the project based upon final
costs.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES
OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE,
ILLINOIS, on this 23rd day of November , 1998.
Barbara Buschman
Keith Latz
Connie Markiewicz
Rick Rimbo
Ralph Schobert
Mary Studebaker
AYES NAYS PASSED ABSENT
L/
v
v
t,
CHARLENE SMOLLEN, Village Clerk
Approved by me this 23rd da, of November ,1998.
Attest:
KWASNESKI, Village President
ENE SM
Approved to
EN, Village Clerk
1
• r' N I ' OULOS, illage Attorney
NOV-09-1998 08:28
1
P.02
PAGE 2A
B TTMATE OF COST AN) PARTICIPATION
FEDERAT, ST6TF, IL •A . -
TYPE QF WORT{ COST 56 CQST Et COST °Is TOTAL
All roadway work $ 754,110 90% $ 83,790 10% $ N/A $ 837,90..
P &C Engineering $ 113,116 90% $ 12,569 10% $ N/A $ 125,68_
(15%)
TRAFFi CTCN i c
IL 171 at 127th $ 90,000 90% $ 7,500 7.5% $ 2,500 2.5% $ 100,00C
Street/Jane Street
P &C Engineering $ 13,500 90% $ 1,125 7.5% $ 375 2.5% $ 15,000
(15 %)
Emergency Vehicle $ N/A $ N/A $ 6,000 100% $ 6,000
Pre- emption
P &C Engineering $ N/A $ N/A $ 900 100% $ 900
(15%)
Total
$ 970,726 $ 104,984 $ 9,775 $ 1,085,485
Note: The Village's participation shall be predicated on the percentages shown above for the
specified work. The Village's cost shall be determined by multiplying the final quantities
times contract unit prices plus 15% for construction and preliminary engineering.
The Village's participation toward traffic signals shall not exceed $3,593.75 which
represents 125% of the estimated construction and engineering costs for the
aforedescribed signals.
&AwPlsupp(ssrnSUbso818c.doc