R-89-00 10/09/00RESOLUTION ,'
RESOLUTION AUTHORIZING CONTRACT CHANGE ORDER FOR
CONSTRUCTION SERVICES RENDERED IN CONJUNCTION WITH THE
DRAINAGE TUNNEL REPAIR (AREA 1— BOWL AREA) PROJECT
WHEREAS, the Village of Lemont has previously awarded a construction contract to Lakes
& Rivers Contracting for the Drainage Tunnel Repair Project, Area 1; and
WHEREAS, the Village of Lemont has determined that certain changes to the contract
totaling $ 5,943.68 are necessary to satisfactorily complete the construction project; and
WHEREAS, the contract changes are a result of final quantities as measured in place or
changes that were not originally contemplated at the time the contract was awarded.
NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the
Contract Change Order with Lakes & Rivers Contracting in the amount of $ 5,943.68
is hereby approved.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE,
ILLINOIS, on this 9th day of October , 2000.
AYES NAYS PASSED ABSENT
John Benik
Debby Blatzer
Keith Latz
Connie Markiewicz
Rick Rimbo
Mary Studebaker
Approved by me this 9th
Atte
ARLENE SMOLLE ', Village Clerk
October , 2000.
mr.KI illage President
Approved to fo A
OHN ANTONOPOULOS, . ' age Attorney
Village of Lemont
Project: Lemont Drainage Tunnel Repairs
Area 1 (Bowl Tunnel)
Owner: Village of Lemont
418 Main Street
Lemont, Illinois 60439
Contractor. Lakes & Rivers Contracting
P. O. Box 67
Lemont, Illinois 60439
Authorization of Contract Changes
Authorization No. 1
Date: September 11, 2000
Engineer. Christopher B. Burke Engineering, Ltd.
9575 West Higgins Road, Suite 600
Rosemont, Illinois 60018 -4920
The following change from the plans in the construction of the above designated project is authorized and directed. The estimated quantities
are shown below at the awarded contract prices except as indicated. The first addition of an item not in the original contract is indicated
by an asterisk ( *).
CHANGES TO QUANTITIES
ITEM NO.
* PAY ITEM
UNIT
QUANTITY
UNIT PRICE
A/D
ADDITION
DEDUCTION
N/A
* Replace Backstop (split cost)
LS
1.00
$ 2,000.00
A
$ 2,000.00
21101300
Furnishing and Placing Topsoil, 4"
SY
1667.30
$ 5.00
A
$ 8,336.50
25000100
Seeding, Class 1
AC
0.32
$ 8,000.00
A
$ 2,560.00
25100630
Erosion Control Blanket
SY
- 484.30
$ 3.00
D
$ 1,452.90
50105210
Remove Existing Culverts
FT
-3.00
$ 138.00
D
$ 414.00
50300225
Concrete Structures
CY
2.50
$ 880.00
A
$ 2,200.00
50301250
Formed Concrete Repair -Wall (Depth > 5 ")
SF
, -28.70
$ 75.00
D
$ 2,152.50
50301250
Formed Concrete Repair -Floor (Depth > 5 ")
SF
-7.00
$ 25.00
D
$ 175.00
50800105
Reinforcement Bars
LB
859.20
$ 1.90
A
$ 1,632.48
58500100
Epoxy Mortar Repair
CF
-5.92
$ 645.00
D
$ 3,818.40
Z0013825
Controlled Low - Strength Material
CY
-13.00
$ 100.00
D
$ 1,300.00
N/A
Drill and Grout Dowel Bars
EA
96.00
$ 23.75
A
$ 2,280.00
N/A
Crack Sealing
FT
- 158.00
$ 23.75
D
$ 3,752.50
Amount of Contract:
$ 204,629.50
Totals:
$ 19,008.98
$ 13,065.30
Net Change to Date:
$ 5,943.68
% Change:
2.90%
Net Change:
$ 5,943.68
Final Amount of Contract:
$ 210,573.18
Village of Lemont
Project: Lemont Drainage Tunnel Repairs
Area 1 (Bowl Tunnel)
Owner: Village of Lemont
418 Main Street
Lemont, Illinois 60439
Contractor: Lakes & Rivers Contracting
P. O. Box 67
Lemont, Illinois 60439
Authorization of Contract Changes
Authorization No. 1
Date: September 11, 2000
Engineer: Christopher B. Burke Engineering, Ltd.
9575 West Higgins Road, Suite 600
Rosemont, Illinois 60018 -4920
The following change from the plans in the construction of the above designated project is authorized and directed. The estimated quantities
are shown below at the awarded contract prices except as indicated. The first addition of an item not in the original contract is indicated
by an asterisk (•).
DESCRIPTION AND REASON:
N/A
Replace Backstop (split cost)
The tunnel alignment was discovered to be under the school's backstop during
construction of the new tunnel section. The old backstop was removed and
replaced with a new backstop.
21101300
Furnishing and Placing Topsoil, 4"
Due to the differing tunnel alignment, more area was disturbed which required
restoration.
25000100
Seeding, Class 1
Due to the differing tunnel alignment, more area was disturbed which required
restoration.
25100630
Erosion Control Blanket
Field measured quantity.
50105210
Remove Existing Culverts
Field measured quantity.
50300225
Concrete Structures
Field measured quantity.
50301250
Formed Concrete Repair -Wall (Depth > 5 ")
Field measured quantity.
50301250
Formed Concrete Repair -Floor (Depth > 5 ")
Field measured quantity.
50800105
Reinforcement Bars
Field measured quantity. The reinforcement bars for the wall repairs were not
included in the original quantity calculations.
58500100
Epoxy Mortar Repair
Field measured quantity.
Z0013825
Controlled Low - Strength Material
Field measured quantity.
N/A
Drill and Grout Dowel Bars
Field measured quantity. The dowel bars for the wall repairs were not included in the
original quantity calculations.
N/A
Crack Sealing
Field measured quantity.