R-90-00 10/09/00RESOLUTION RESOLUTION AUTHORIZING CONTRACT CHANGE ORDER FOR CONSTRUCTION SERVICES RENDERED IN CONJUNCTION WITH THE DRAINAGE TUNNEL REPAIR (AREA 2 — ILLINOIS STREET) PROJECT WHEREAS, the Village of Lemont has previously awarded a construction contract to Lakes & Rivers Contracting for the Drainage Tunnel Repair Project, Area 2; and WHEREAS, the Village of Lemont has determined that certain changes to the contract totaling $ 73,452.82 are necessary to satisfactorily complete the construction project; and WHEREAS, the contract changes are a result of final quantities as measured in place or changes that were not originally contemplated at the time the contract was awarded. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Contract Change Order with Lakes & Rivers Contracting in the amount of $ 73,452.82 is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 9th day of October , 2000. John Benik Debby Blatzer Keith Latz Connie Markiewicz Rick Rimbo Mary Studebaker AYES V NAYS PASSED ABSENT C ARLEN SMOLLEN, Village Clerk Approved by me this 9th day October , 2000. CHARLENE SMOLLEN, Village Clerk Approved to fo JOHN ANTONOPOULO Ilage Attorney e ' rest s ent Village of Lemont Project: Lemont Drainage Tunnel Repairs Area 2 (Cass / Illinois Tunnel) Owner: Village of Lemont 418 Main Street Lemont, Illinois 60439 Contractor: Lakes & Rivers Contracting P. O. Box 67 Lemont, Illinois 60439 Authorization of Contract Changes Authorization Summary Date: June 12 - September 11, 2000 Engineer: Christopher B. Burke Engineering, Ltd. 9575 West Higgins Road, Suite 600 Rosemont, Illinois 60018 -4920 The following change from the plans in the construction of the above designated project is authorized and directed. The estimated quantities are shown below at the awarded contract prices except as indicated. The first addition of an item not in the original contract is indicated by an asterisk ( *). AUTHORIZATION NO. 1 ITEM NO. * PAY ITEM UNIT QUANTITY UNIT PRICE ND ADDITION DEDUCTION 55023100 55023100A Storm Sewers, Type 1, RCC, Class II, 78" * Storm Sewers, Type 1, RCC, Class III, 90" FT FT -60.00 60.00 $ 1,200.00 $ 1,575.00 D A $ 94,500.00 $ 72,000.00 Totals: Net Change: $ 94,500.00 $ 72,000.00 $ 22,500.00 DESCRIPTION: The Illinois Department of Transportation, upon review of the road closure permit for this work, required that upsized to the equivalent area of the culvert section that is being replaced. the pipe section be AUTHORIZATION NO. 2 ITEM NO. * PAY ITEM UNIT QUANTITY UNIT PRICE ND ADDITION DEDUCTION 70101700A * Traffic Cont and Prot (Detour Revisions) LS 1.00 $ 4,970.00 A $ 4,970.00 Totals: Net Change: $ 4,970.00 $ - $ 4,970.00 DESCRIPTION: The Illinois Department of Transportation, upon review of the road closure permit for this work, required additional signage be placed for the detour. A secondary detour plan was also utilized for two evenings, due to a conflict, during the time period of this closure. AUTHORIZATION NO. 3 ITEM NO. * PAY ITEM UNIT QUANTITY UNIT PRICE ND ADDITION DEDUCTION N/A N/A * Rem & Repl Exist Brick Sanitary Manhole * Demolition & Shoring of Vault LS LS 1.00 1.00 $ 5,000.00 $ 1,690.00 A A $ 5,000.00 $ 1,690.00 Totals: $ 6,690.00 $ - Net Change: $ 6,690.00 DESCRIPTION: An existing brick sanitary manhole was determined to be along the edge of the tunnel section being replaced. Due to the condition of the existing manhole, the structure had to be removed and replaced during replacement of the tunnel to eliminate conflicts and facilitate construction of the tunnel. Also, a corner of a vault was constructed over the top of the existing tunnel. The corner of the vault had to be removed and shored to facilitate replacement of the tunnel section. Page 1 of 3 Village of Lemont Project: Lemont Drainage Tunnel Repairs Area 2 (Cass / Illinois Tunnel) Owner: \Tillage of Lemont 418 Main Street Lemont, Illinois 60439 Contractor: Lakes & Rivers Contracting P. O. Box 67 Lemont, Illinois 60439 Authorization of Contract Changes Authorization Summary Date: June 12 - September 11, 2000 Engineer: Christopher B. Burke Engineering, Ltd. 9575 West Higgins Road, Suite 600 Rosemont, Illinois 60018 -4920 The following change from the plans in the construction of the above designated project is authorized and directed. The estimated quantities are shown below at the awarded contract prices except as indicated. The first addition of an item not in the original contract is indicated by an asterisk ( *). AUTHORIZATION NO. 4 ITEM NO. * PAY ITEM UNIT QUANTITY UNIT PRICE ND ADDITION DEDUCTION _ 20800150 Trench Backfill CY 311.20 $ 30.00 A $ 9,336.00 31101400 Subbase Granular Material, Type B 6" SY 14.60 $ 25.00 A $ 365.00 35500500 Bituminous Base Course 8" SY 80.10 $ 25.00 A $ 2,002.50 40600740 Bit Conc Binder Course, Mix B, Type 2 TN -6.00 $ 1,000.00 D $ 6,000.00 40600740 Bit Conc Binder Course, Mix B, Type 2 TN 18.00 $ 400.00 A $ 7,200.00 40600850 Bit Conc Surface Course, Mix D, CI 1, Ty 2 TN -6.00 $ 1,000.00 D $ 6,000.00 40600850 Bit Conc Surface Course, Mix D, CI 1, Ty 2 TN 18.70 $ 400.00 A $ 7,480.00 44000100 Pavement Removal SY 97.00 $ 60.00 A $ 5,820.00 44001700 Comb Conc Curb & Gutter Rem and Repl FT 14.20 $ 100.00 A $ 1,420.00 44004610 Sidewalk Removal and Replacement SF 410.70 $ 20.00 A $ 8,214.00 50105210 Remove Existing Culverts FT 5.00 $ 1,100.00 A $ 5,500.00 50300220 Concrete Structures CY -1.00 $ 750.00 D $ 750.00 50301230 Formed Concrete Wall Repair SF -55.00 $ 100.00 D $ 5,500.00 50800105 Reinforcement Bars LB - 1338.34 $ 2.00 D $ 2,676.68 55019500 Storm Sewers, Type 1, RCC, Class IV 12" FT -8.00 $ 100.00 D $ 800.00 58500100 Epoxy Mortar Repair CF -8.68 $ 675.00 D $ 5,859.00 60206905 Catch Basins, Ty C, Ty 1 Frame, Open Lid EA -1.00 $ 600.00 D $ 600.00 Z0013825 Controlled Low Strength Material CY 62.00 $ 108.00 A $ 6,696.00 N/A Drill & Grout Dowel Bars EA 8.00 $ 25.00 A $ 200.00 N/A Pipe Joint Repairs LF 358.00 $ 15.00 A $ 5,370.00 55023100A Storm Sewers, Type 3, RCC, Class II 90" LF 5.00 $ 1,575.00 A $ 7,875.00 Totals: $ 67,478.50 $ 28,185.68 Net Change: $ 39,292.82 DESCRIPTION: These changes represent the field measured quantities for each individual item. Many of the quantities have changed either due to the larger diameter pipe required by IDOT or due to the vault which was constructed over the tunnel and had to be shored and filled. Additionally, the contractor agreed to a reduced unit price for the asphalt items because of the larger quantities which were necessary for patching the roadway. Page 2 of 3 Village of Lemont Project: Lemont Drainage Tunnel Repairs Area 2 (Cass / Illinois Tunnel) Owner: Village of Lemont 418 Main Street Lemont, Illinois 60439 Contractor: Lakes & Rivers Contracting P. O. Box 67 Lemont, Illinois 60439 Authorization of Contract Changes Authorization Summary Date: June 12 - September 11, 2000 Engineer: Christopher B. Burke Engineering, Ltd. 9575 West Higgins Road, Suite 600 Rosemont, Illinois 60018 -4920 The following change from the plans in the construction of the above designated project is authorized and directed. The estimated quantities are shown below at the awarded contract prices except as indicated. The first addition of an item not in the original contract is indicated by an asterisk ( *). CHANGES TO THE CONTRACT PRICE Original CONTRACT PRICE: The CONTRACT PRICE due to these CHANGE ORDERS will be INCREASED by: The new CONTRACT PRICE including these CHANGE ORDERS will be: $ 283,915.00 $ 73,452.82 $ 357,367.82 CHANGES TO CONTRACT TIME The CONTRACT TIME was not affected by these agreements. AUTHORIZED SIGNATURES Approved by OWNER Date Page 3 of 3