Loading...
R-91-00 10/23/00RESOLUTION RESOLUTION AUTHORIZING CONTRACT UNIT PRICE CHANGE ORDER IN CONJUNCTION WITH THE WALTER STREET IMPROVEMENT PROJECT (1999 ROAD PROGRAM) WHEREAS, the Village of Lemont has previously awarded a construction contract to K -Five Construction Corporation for the 1999 Road Resurfacing Project; and WHEREAS, the Village of Lemont has determined that certain adjustments to unit prices within the contract are necessary to satisfactorily complete the construction project; and WHEREAS, the contract unit price changes reflect a change in operating costs incurred as a direct result of a extended suspension of works that was not originally contemplated at the time the contract was awarded. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Contract Unit Price Change Order with K -Five Construction as attached as Appendix A is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 23rd day of October , 2000. John Benik Debby Blatzer Keith Latz Connie Markiewicz Rick Rimbo Mary Studebaker AYES 1 V Approved by me this 23rd day of At NAYS PASSED ABSENT ///■._ J !, ARLENE SMOLLEN, Village Clerk ober , 2100. CHARLENE SMOL N, Village Clerk Village ' resident APPENDIX A Walter Street Improvements (1999 Road Resurfacing Program) Revised Unit Prices Activity ORIGINAL CONTRACT QUANTITY QUANTITY COMPLETED TO DATE (EST. 4) APPROXIMATE REMAINING QUANTITY ORIGINAL UNIT BID REVISED UNIT BID 1. Earth excavation - Special 1.00 1.00 $55,000.00 $64,430.11 2. Trench Backfill 193.25 193.25 $35.00 $35.10 3. Furnish & Place Topsoil 4" 2,873.00', 2,120.00 753.00 $2.00 $2.00 4. Sod - Special 2,873.00 2,120.00 753.00 $4.00 $4.00 5. Erosion Control 525 . 525.00 $1.60 $1.60 6. Rip Rap 2.00 2.00 $200.00 $200.00 8. Aggregate Base CSE TY B 11" 1798.00 1,798.00 $11.00', $11.85 10. BIT Material Prime Coat 7,028.00 266.00 6,762.00 $0.65 $1.00 12. Binder Course "B" TY2 -2" 205.00 „ 205.00 $37.00', $46.78 14. BIT SURF CRS C CL1 TY 2, 2" 251.00 251.00 $43.00 $52.90 16. Prot. Coat 7,948.00 2,937.40 5,010.60 $1.04: $1.38_ 17. PCC Driveway 544.00 1,053.20 175.00 $30.00 $33.00 18. PCC Sidewalk 4,327.00 4,927.20 3,450.00 $2.50 $2.75 20. Pavement Removal 400.00 400.00 $4.00 $6.60 21. Driveway Pavement Removal 718.00 1,652.40 300.00 $4.10; $5.00 22. Combo Curb & Gutter Removal 9,634.00 8,906.80 727.20 $6.00 $6.60 26. PRC FES 12" 1.00 1.00 $440.00 $534.50, 27. 12" R.C.P. Class 4 565.00 565.00 $20.00 $35.10 28. SS REM 12' 35.00 35.00 $5.35 $17.19 29. Pipe Underdrain 3,220.00 2,305.50 914.50 $12.00 $16.44 30. CB TY A 4' TY 23 7.00 7.00 $1,300.00 $1,580.35 31. MH TY A TY 23 FR 3.00 3.00 $1,350.00 $1,574.10 32. Inlet Type A TY 23 FR 3.00 3.00 $650.00 $676.00 33. CB ADJ 4.00 15.00 1.00 $195.00 $232.60 34. CB Reconstruct 8.00 8.00 $875.00 $901.00 36. MH Reconstruct 5.00 5.00 $875.00 $901.00 37. Inlet ADJ 2.00 2.00 $195.00 $226.00 38. Inlet Removed 1.00 1.00 $80.00 $204.00 41. Traffic Control 1 AO 0.95 0.05 $32,300.00 $32,300.00 45. Construction Layout 1.00 0.65 0.35 $20,000.00 $21,710.00 46. Water Service - 1" Dia. 2.00 2.00 $1,900.00 $2,030.00 47. Retaining Wall 1.00 1.00 $65,000.00 $18,200.00 48. COMBO CONC C&G TY M-3.12 6,756.00 5,678!50 1077.50 $12.00 $13.05 52. Pipe Protection 1.00 1.00 N/A $29,897.00