R-91-00 10/23/00RESOLUTION
RESOLUTION AUTHORIZING CONTRACT UNIT PRICE
CHANGE ORDER IN CONJUNCTION WITH THE
WALTER STREET IMPROVEMENT PROJECT (1999 ROAD PROGRAM)
WHEREAS, the Village of Lemont has previously awarded a construction contract to K -Five
Construction Corporation for the 1999 Road Resurfacing Project; and
WHEREAS, the Village of Lemont has determined that certain adjustments to unit prices
within the contract are necessary to satisfactorily complete the construction project; and
WHEREAS, the contract unit price changes reflect a change in operating costs incurred as a
direct result of a extended suspension of works that was not originally contemplated at the time
the contract was awarded.
NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the
Contract Unit Price Change Order with K -Five Construction as attached as Appendix A is
hereby approved.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE,
ILLINOIS, on this 23rd day of October , 2000.
John Benik
Debby Blatzer
Keith Latz
Connie Markiewicz
Rick Rimbo
Mary Studebaker
AYES
1
V
Approved by me this 23rd day of
At
NAYS PASSED ABSENT
///■._ J !,
ARLENE SMOLLEN, Village Clerk
ober
, 2100.
CHARLENE SMOL
N, Village Clerk
Village ' resident
APPENDIX A
Walter Street Improvements
(1999 Road Resurfacing Program)
Revised Unit Prices
Activity
ORIGINAL
CONTRACT
QUANTITY
QUANTITY
COMPLETED TO
DATE (EST. 4)
APPROXIMATE
REMAINING
QUANTITY
ORIGINAL UNIT
BID
REVISED UNIT BID
1. Earth excavation - Special
1.00
1.00
$55,000.00
$64,430.11
2. Trench Backfill
193.25
193.25
$35.00
$35.10
3. Furnish & Place Topsoil 4"
2,873.00',
2,120.00
753.00
$2.00
$2.00
4. Sod - Special
2,873.00
2,120.00
753.00
$4.00
$4.00
5. Erosion Control
525 .
525.00
$1.60
$1.60
6. Rip Rap
2.00
2.00
$200.00
$200.00
8. Aggregate Base CSE TY B 11"
1798.00
1,798.00
$11.00',
$11.85
10. BIT Material Prime Coat
7,028.00
266.00
6,762.00
$0.65
$1.00
12. Binder Course "B" TY2 -2"
205.00 „
205.00
$37.00',
$46.78
14. BIT SURF CRS C CL1 TY 2, 2"
251.00
251.00
$43.00
$52.90
16. Prot. Coat
7,948.00
2,937.40
5,010.60
$1.04:
$1.38_
17. PCC Driveway
544.00
1,053.20
175.00
$30.00
$33.00
18. PCC Sidewalk
4,327.00
4,927.20
3,450.00
$2.50
$2.75
20. Pavement Removal
400.00
400.00
$4.00
$6.60
21. Driveway Pavement Removal
718.00
1,652.40
300.00
$4.10;
$5.00
22. Combo Curb & Gutter Removal
9,634.00
8,906.80
727.20
$6.00
$6.60
26. PRC FES 12"
1.00
1.00
$440.00
$534.50,
27. 12" R.C.P. Class 4
565.00
565.00
$20.00
$35.10
28. SS REM 12'
35.00
35.00
$5.35
$17.19
29. Pipe Underdrain
3,220.00
2,305.50
914.50
$12.00
$16.44
30. CB TY A 4' TY 23
7.00
7.00
$1,300.00
$1,580.35
31. MH TY A TY 23 FR
3.00
3.00
$1,350.00
$1,574.10
32. Inlet Type A TY 23 FR
3.00
3.00
$650.00
$676.00
33. CB ADJ
4.00
15.00
1.00
$195.00
$232.60
34. CB Reconstruct
8.00
8.00
$875.00
$901.00
36. MH Reconstruct
5.00
5.00
$875.00
$901.00
37. Inlet ADJ
2.00
2.00
$195.00
$226.00
38. Inlet Removed
1.00
1.00
$80.00
$204.00
41. Traffic Control
1 AO
0.95
0.05
$32,300.00
$32,300.00
45. Construction Layout
1.00
0.65
0.35
$20,000.00
$21,710.00
46. Water Service - 1" Dia.
2.00
2.00
$1,900.00
$2,030.00
47. Retaining Wall
1.00
1.00
$65,000.00
$18,200.00
48. COMBO CONC C&G TY M-3.12
6,756.00
5,678!50
1077.50
$12.00
$13.05
52. Pipe Protection
1.00
1.00
N/A