R-110-00 11/27/00RESOLUTION R
RESOLUTION AUTHORIZING CONTRACT CHANGE ORDER FOR
CONSTRUCTION SERVICES RENDERED IN CONJUNCTION WITH THE
CANAL STREET RECONSTRUCTION PROJECT
WHEREAS, the Village of Lemont has previously awarded a construction contract to
D Construction, Inc. for the Canal Street Reconstruction Project; and
WHEREAS, the Village of Lemont has determined that certain changes to the contract
totaling a negative ($74,859.02) are necessary to satisfactorily complete the construction
project; and
WHEREAS, the contract changes are a result of final quantities as measured in place and
changes that were not originally contemplated at the time the contract was awarded.
NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the
Contract Change Order with to D Construction, Inc in the negative amount of ($74,859.02) is
hereby approved.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE,
ILLINOIS, on this 27th day of November , 2000.
AYES NAYS PASSED ABSENT
John Benik l/
Debby Blatzer l/
Keith Latz
Connie Markiewicz
Rick Rimbo
Mary Studebaker
Z' - ./F
CH • 1 ENE SMOLLEN, Village Clerk
Approved by me this 27th day of i November , 2000.
iffilf
1 r A F 1 AS , Village President
Attest:
7
HARLENE SM
Approved to for
L N, Vill
lerk
2
d ✓ �Lu Ai. Alir
1 ANTONOPOUI O , Village Attorney
Illinois Department Resident Engineer's Request for
Authorization for Change Orders
of Transportation
Sheet 1 of 11
TO: District Engineer
Authorization No.
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City, IL, 60416
County 1
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Project Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16, 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station
, a net length of . This change
revises the total length to
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
01
EARTH EXCAVATION, CY
57.36
15.00
0.00
860.40
02
ROCK EXCAVATION, CY
20.15
300.00
0.00
6,045.00
03
REM.OF UNSUITABLE MAT'L, CY
348.20
15.00
0.00
5,223.00
04
EMBANKMENT, CY
68.00
10.00
0.00
680.00
05
POROUS GRANULAR EMBK, SPL, CY
385.00
28.00
0.00
10,780.00
06
TRENCH BACKFILL, CY
62.30
25.00
0.00
1,557.50
07
POROUS GRANULAR BACKFILL, CY
164.00
32.00
0.00
5,248.00
08
GEOTECHNICAL FABRIC, SY
1,951.00
1.20
0.00
2,341.20
09
EXPLORATION TRENCH, SPECIAL, FT
22.00
50.00
1,100.00
0.00
10
INLET AND PIPE PROTECTION, EACH
23.00
50.00
0.00
1,150.00
Amount of original
Net change to date
Contract $ 1,141,312.55
2.87%
Totals
$1,100.00
$33,885.10
$ - 32,785.10 % of contract price
Net Change
$0.00
$32,785.10
Location and Reason for the Change of Each Item: 01 - Final field measurements.
02 - Minimal rock excavation encountered.
03 - Undercuts for suitable subgrade less than estimated.
04 - Final field measurements.
05 - Final field measurements.
06 - Final field measurements.
07 - Undercuts for suitable subgrade less than estimated.
/
.*:/../ - �/ AO
08 - Undercuts for suitable subgrade less than estimated.
09 - Exisitng conditions were different than utility atlases.
10 - Item not required for construction.
• it I %'
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department Resident Engineer's Request for
Authorization for Change Orders
of Transportation
Sheet 2 of 11
TO: District Engineer
Authorization No.
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City, IL, 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Project Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16, 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station
, a net length of . This change
revises the total length to
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
11
SUB -BASE GRAN. MAT'L, 4 ", SY
120.00
4.25
0.00
510.00
12
BITUMINOUS BASE COURSE, 9 ", SY
543.00
16.80
0.00
9,122.40
13
BITUMINOUS MAT'L PRIMECOAT, GAL
65.00
2.00
0.00
130.00
14
AGGREGATE (PRIMECOAT), TON
6.70
15.00
0.00
100.50
15
BIT. CONC. BINDER COURSE, TON
49.00
35.00
1,715.00
0.00
16
BIT. CONC. SURFACE COURSE, TON
19.00
37.00
0.00
703.00
17
PROTECTIVE COAT, (SPECIAL), SY
4.00
1.00
4.00
0.00
18
P.C.C.SIDEWALK, (SPECIAL), SF
1,200.00
7.55
0.00
9,060.00
19
PAVEMENT REMOVAL, SY
2,056.00
10.00
20,560.00
0.00
21
COMB. CURB & GUTTER REMOVAL
183.00
3.50
0.00
640.50
Amount of original
Net change to date
Contract $ 1,141,312.55
2.70%
Totals
$22,279.00
$20,266.40
$ - 30,772.50 % of contract price
Net Change
$2,012.60
$ 0.00
Location and Reason for the Change of Each Item: 11 - Final field measurements.
12 - Final field measurements. Actual SQ YD paved was less than plan estimated area.
13 - Final field measurements.
14 - Item not used in construction.
15 - Final field measurements.
16 - Final field measurements.
17 - Final field measurements.
r
../i.-
/wv.
18 - Removed areas were less than estimated plan quantity.
19 - Miscalculation in plan quantity underestimated actual removed areas.
20 - Final field measurements.
/" °si. -'t
cc: Project File
v
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department
of Transportation
Sheet 3 of 11
TO: District Engineer
Authorization No.
Resident Engineer's Request for
Authorization for Change Orders
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City, IL, 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Project Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16, 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station
revises the total length to
to Station , a net length of . This change
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
22
COMB. C &G REM & REPLACE, FT
0.60
60.00
0.00
36.00
23
CLASS D PATCHES, TY -II, 12 ", SY
12.00
75.00
0.00
900.00
25
CLASS D PATCHES, TY -IV, 12 ", SY
27.00
70.00
0.00
1,890.00
26
CLASS MS CONCRETE, CY
86.00
600.00
0.00
51,600.00
27
STORM SEWERS, CL A, T -1, 12 ", FT
51.00
22.00
0.00
1,122.00
28
STORM SEWERS, CL A, T -1, 15 ", FT
8.00
24.00
0.00
192.00
29
STORM SEWERS, CL A, T -2, 12 ", FT
9.00
22.00
0.00
198.00
30
STORM SEWERS, CL A, T -2, 15 ", FT
11.00
24.00
0.00
264.00
31
STORM SEWERS, CL A, T -2, 18 ", FT
1.00
35.00
35.00
0.00
32
STORM SEWERS, CL B, T -1, 8 ", FT
302.50
20.00
6,050.00
0.00
Amount of original
Net change to date
Contract $ 1,141,312.55
7.10%
Totals
$6,085.00
$56,202.00
$ - 80,889.50 % of contract price
Net Change
$0.00
$50,117.00
Location and Reason for the Change of Each Item: 22 - Final field measurements.
23 - Item not used for construction.
25 - Final field measurements.
26 - No sidewalk vaults were encountered.
27 - Final field measurements.
28 - Final field measurements.
29 - Final field measurements.
Ag
i ; /A
30 - Final field measurements.
31 - Final field measurements.
32 - Contract called for water main quality pipe which was not required.
r '''
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department
of Transportation
Sheet 4 of 11
TO: District Engineer
Authorization No.
Resident Engineer's Request for
Authorization for Change Orders
County Cook
Section 98 - 00028 - 00 - GL
❑ In -house "/ Consultant Route Canal Street
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City. IL. 60416
District
Contract No. C - 91 - 314 - 99
Job No.
Proiect Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date Novemeber 16. 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station , a net length of . This change
revises the total length to
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
33
STORM SEWER REMOVAL, 12"
15.00
12.00
180.00
0.00
34
DUCTILE IRON WATER MAIN, 6 ", FT
8.00
30.00
0.00
240.00
35
DUCTILE IRON WATER MAIN, 8 ", FT
19.00
30.00
0.00
570.00
36
DUCTILE IRON WATER MAIN, 10 ", FT
19.00
57.00
0.00
1,083.00
38
FIRE HYDRANTS, EACH
1.00
2,000.00
0.00
2,000.00
47
VALVE VAULT,TY -A, 5' DIA, EACH
2.00
1,400.00
0.00
2,800.00
51
VALVE VAULT TO BE ADJUSTED
1.00
250.00
0.00
250.00
Amount of oriainal Contract 1,141,312.55
Totals
$ 180.00
$6,943.00
Net chance to date $ -87,652.50 % of contract nrice 7.70%
Net Chance
$0.00
$6,763.00
Location and Reason for the Chance of Each Item. 33 - Final field measurements
34 - Final field measurements.
35 - Final field measurements.
36 - Final field measurements.
38 - Existing fire hydrant at southwest corner of Canal St. and Stephens St. was reused.
47 - Valve vault at Stephens St. was replaced with a valve box and valve vault in Metra parking lot was not required.
51 - Final field measurements.
a
` / . - .ident
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department Resident Engineer's Request for
Authorization for Change Orders
of Transportation
Sheet 5 of 11
TO: District Engineer
Authorization No.
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City, IL, 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Project Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16, 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station
, a net length of . This change
revises the total length to
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Itern Description and Unit
Quantity
Unit Price
Addition
Deduction
52
REMOVING MANHOLES, EACH
1.00
250.00
0.00
250.00
53
REMOVING CATCH BAINS, EACH
1.00
200.00
200.00
0.00
55
COMB. CONC. CURB & GUTTER,
19.00
12.50
237.50
0.00
56
ENGINEER'S FIELD OFFICE, CAL MO
9.00
1,600.00
0.00
14,400.00
57
SIGN PANEL - TYPE 1, SF
1.00
25.00
0.00
25.00
60
RELOCATE SIGN PANEL ASSEM., EA
2.00
100.00
200.00
61
METAL POST - TYPE A
11.00
15.00
0.00
165.00
Amount of original
Net change to date
Contract $ 1,141,312.55
8.90%
Totals
$ 637.50
$14,840.00
$ - 101,855.00 % of contract price
Net Change
$0.00
$14,202.50
Location and Reason for the Change of Each Item: 52 - Final field measurements.
53 - Final field measurements.
55 - Final field measurements.
56 - No field office was required or used.
57 - Final field measurements.
60 - Final field measurements.
61 - Final field measurements.
//„ tom::
AttriEW
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department Resident Engineer's Request for
Authorization for Change Orders
of Transportation
Sheet 6 of 11
TO: District Engineer
Authorization No.
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City, IL, 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Project Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16, 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station , a net length of . This change
revises the total length to
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
62
THERMO PAV'T MRK'G - LINE 4 ", FT
576.00
0.85
489.60
0.00
63
THERMO PAV'T MRK'G - LINE 6 ", FT
120.00
1.28
153.60
0.00
64
THERMO PAV'T MRK'G - LINE 8 ", FT
40.00
1.70
0.00
68.00
65
THERMO PAV'T MRK'G - LINE 12 ", FT
97.00
2.55
0.00
247.35
66
THERMO PAV'T MRK'G- LINE 24 ", FT
31.00
5.00
155.00
0.00
67
PAINTED PAV'T MARKING - L &S, SF
50.00
2.75
137.50
0.00
68
CONDUIT IN TRENCH, 3/4" DIA.,GS, FT
305.00
8.00
0.00
2,440.00
72
CONDUIT PUSHED, 2" DIA., GS, FT
65.00
22.00
0.00
1,430.00
73
CONDUIT PUSHED, 5" DIA., GS, FT
158.00
35.00
0.00
5,530.00
79
TBF FOR ELECTRICAL WORK, FT
27.00
3.00
81.00
0.00
Amount of original
Net change to date
Contract $ 1,141,312.55
9.70%
Totals
$1,016.70
$9,715.35
$ -110,553.65 % of contract price
Net Change
$0.00
$8,698.65
Location and Reason for the Change of Each Item: 62 - Remaked paved public parking lot and metra parking stalls.
63 - Additional parking stalls added to streetside parking along Canal Street.
64 - Final field measurements.
65 - Final field measurements.
66 - Final field measurements.
67 - Replaced RR X'ing marking on Lemont St., south of Canal St.
68 - Item not used in construction.
/
� 71
72 - All conduits used for electrical work were trenched rather than pushed.
73 All conduits used for electrical work were trenched rather than pushed.
79 - Final field measurements.
R-.ide
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department Resident Engineer's Request for
Authorization for Change Orders
of Transportation
Sheet 7 of 11
TO: District Engineer
Authorization No.
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City, IL, 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Project Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16, 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station , a net length of . This change
revises the total length to
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
84
CONC.SIDEWALK REM'L,SPEC.,SQ FT
1,100.00
2.00
2,200.00
85
CONTRLD LOW STRENGTH MAT'L, CY
5.00
85.00
425.00
86
DUST CONTROL, SPECIAL , SQ YD
3,353.00
1.00
3,353.00
87
FOAMGLAS INSULATION, 5 ", FT
25.00
20.00
500.00
88
LIGHT POLE FOUNDATION, EACH
2.00
950.00
1,900.00
0.00
89
LIGHT POLE FOUNDATION SPEC, EA
2.00
1,200.00
0.00
2,400.00
92
ELECTRIC CABLE IN CONDUIT, FT
63.00
1.10
69.30
0.00
94
UNIT DUCT, 3 -1 /C NO.4, 1 ", FT
597.00
5.75
3,432.75
0.00
96
PRESSURE CONNECTION, 4 "X10 ", EA
1.00
3,500.00
0.00
3,500.00
97
REMOVE VALVE AND VAULT, EACH
1.00
550.00
0.00
550.00
Amount of original
Net change to date
Contract $ 1,141,312.55
10.30%
Totals
$5,402.05
$12,928.00
$ - 118,079.60 % of contract price
Net Change
$0.00
$7,525.95
Location and Reason for the Change of Each Item: 84 - No sidewalk vaults were encountered.
85 - Final field measurments.
86 - Final field measurments.
87 - Final field measurments.
88 - Since no sidewalk vaults were encountered regular LP Foundations were placed instead of Special LP foundations.
89 - Since no sidewalk vaults were encountered regular LP Foundations were placed instead of Special LP foundations.
92 - Final field measurments.
94 - Plan quantities underestimated the amount required for construction.
96 - Public works shut off water rather than making a pressure connection.
97 - Item not used in construction.
9
ent
�j
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department
of Transportation
Sheet 8 of 11
TO: District Engineer
Authorization No.
Resident Engineer's Request for
Authorization for Change Orders
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City, IL, 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Project Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16, 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station
to Station
, a net length of . This change
revises the total length to
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
98
SANITARY SERVICE CONNECTNS,EA
16.00
600.00
0.00
9,600.00
101
STORM SEWER (WMQ), 8 ", FT
211.00
32.00
0.00
6,752.00
102
STORM SEWER (WMQ), 12 ", FT
36.00
37.00
1,332.00
0.00
105
VALVE AND VAULT 10"
1.00
2,500.00
2,500.00
0.00
106
WATER MAIN ENCASED
7.40
55.00
0.00
407.00
109
PRESSURE CONNECTION, 6 "X10"
1.00
3,500.00
0.00
3,500.00
110
SANITARY SEWER, TYPE 1, 10"
12.00
62.00
0.00
744.00
111
SAWING PAVEMENT(FULL DEPTH),FT
901.00
2.00
0.00
1,802.00
112
FUL DPTH CONC. SW & DW REM, SF
2,100.17
1.50
0.00
3,150.26
113
FUL DPTH ASPHLT SW & DW REM, SF
2,083.05
1.20
0.00
2,499.66
Amount of original
Net change to date
Contract $ 1,141,312.55
12.50%
Totals
$3,832.00
$28,454.92
$ - 142702.52 % of contract price
Net Change
$0.00
$24,622.92
Location and Reason for the Change of Each Item: 98 - Only one sanitary service was enocountered during construction.
101 - Circumstances did not require the use of water main quality pipe for construction.
102 - Final field measurements.
105 - An additional valve and vault, 10 ", was used in place of a 6 "x10" pressure connection and valve vault.
106 - Final field measurements.
109 - Existing conditions in metra parking lot did not require the use of a 6 "x10" pressure connection.
110 - Final field measurements.
/'/
,'1 e
111 - The M.O.T. plan was changed reducing required quantity.
112 - Removal areas for contract limits over estimated plan quantity.
113 - Removal areas for contract limits over estimated plan quantity.
Re id,9Y
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department
of Transportation
Sheet 9 of 11
TO: District Engineer
Authorization No.
Resident Engineer's Request for
Authorization for Change Orders
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City. IL. 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Proiect Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16. 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station
revises the total length to
, a net length of . This change
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
114
SOIL EXCAVATION AND REMOVAL,CY
18.00
35.00
0.00
630.00
115
UNIT PAVERS TY A - SAND SET, SF
1,966.60
5.55
0.00
10,914.63
116
UNIT PAVERS TY B - SAND SET, SF
432.80
5.55
2,402.04
0.00
117
UNIT PAVERS TY C - SAND SET, SF
565.50
5.55
0.00
3,138.52
118
UNIT PAVERS TY C - BITUM. SET, SF
34.00
7.10
0.00
241.40
119
UNIT PAVERS TACTILE - BIT. SET, SF
51.00
9.90
0.00
504.90
120
CONCRETE HEADERS (6 "X6 ")
14.30
900.00
0.00
12,870.00
121
FINISH CONCRETE
14.13
225.00
0.00
3,179.25
122
6" P.C.C. UNDERLAYMENT
28.80
200.00
5,760.00
0.00
123
9" P.C.C. UNDERLAYMENT
16.70
200.00
0.00
3,340.00
Amount of original
Net chance to date
Contract 1,141,312.55
14.80%
Totals
$8,162.04
$34,818.70
$ - 169,359.18 % of contract nrice
Net Chance
$0.00
$26,656.66
Location and Reason for the Chance of Each Item: 114 - Final field measurements
115 - Plan quanity did not distinguish between Type A sand set and bitum. set. Only Type A sand set was paid with this item.
116 - Sidewalks on Lemont Street between Canal Street and railroad tracks was added to the contract.
117 - Sidewalks on Lemont Street between Canal Street and railroad tracks was added to the contract.
118 - Final field measurements.
119 - Final field measurements.
120 - Plan quantity was overestimated.
2 l'
l
121 - Final field measurements.
122 - 6" P.C.C. underlayment was used for building pedestrian entrances.
Y 9
123 - 9" P.C.C. underlaymt was not used for building pedestrian entrances.
v� Rent
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department Resident Engineer's Request for
Authorization for Change Orders
of Transportation
Sheet 10 of 11
TO: District Engineer
Authorization No.
❑ In -house [Si Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City. IL. 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Proiect Canal St. Improvement
Fund Tvpe Operation Green Lt.
CCS Code
Date November 16. 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station
revises the total length to
, a net length of . This change
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
124
ROUGH CONC. FOOTINGS, CY
6.45
325.00
0.00
2,096.25
125
LOW STONE WALLS(VERT.
15.00
18.70
0.00
280.50
131
BENCHES, EACH
1.00
1,150.00
1,150.00
0.00
134
SHADE TREES - 3" CAL., EACH
1.00
550.00
0.00
550.00
144
TOPSOIL, CY
10.00
55.00
550.00
0.00
145
*
10" VALVE AND VALVE BOX, EACH
2.00
1,565.00
3,130.00
0.00
146
*
REMOVAL OF UNSUITABLE MAT'L,LS
1.00
546.60
546.60
0.00
147
*
PAV'T MRK'G REMOVAL, SF
127.00
1.65
209.55
0.00
149
*
8 "X10" CONNECTION AT ED B. DR.,LS
1.00
1,530.50
1,530.50
0.00
Amount of oriainal Contract 1,141,312.55
Totals
$7,116.65
$2,926.75
Net Chanae
$4,189.90
$0.00
Net chance to date S - 165,169.28 % of contract nrice 14.40%
Location and Reason for the Chanae of Each Item. 124 - Final field measrements
125 - Final field measrements.
131 - Sidewalks and a bench on Lemont Street between Canal Street and railroad tracks were added to the contract.
134 - Final field measurements.
144 - Final field measurements.
145 - Existing conditions required the use of valve boxes rather than valve vaults.
146 - Unsuitable material removed in front of Lemont Rental, not on plans.
/
j//
. _ C '' -7,/
147 - Existing permanent tape markings removed to replace with thermo.
149 - Existing conditions required an 8 "x10" tee instead of a pressure conct.
/ ' R= , -ident
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452
Illinois Department Resident Engineer's Request for
Authorization for Change Orders
of Transportation
Sheet 11 of 11
TO: District Engineer
Authorization No.
❑ In -house ® Consultant
Contractor "D" Construction, Inc.
Address 1488 South Broadway
Coal City. IL. 60416
County Cook
Section 98 - 00028 - 00 - GL
Route Canal Street
District
Contract No. C - 91 - 314 - 99
Job No.
Proiect Canal St. Improvement
Fund Type Operation Green Lt.
CCS Code
Date November 16. 2000
I recommend that a change be made as follows to the above contract:
An
addition
extension
deduction
will be made from Station to Station , a net length of . This change
revises the total length to
The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county
is indicated by asterisk ( *).
Item No.
*
Item Description and Unit
Quantity
Unit Price
Addition
Deduction
150
*
RE- MOBILIZATN FOR AD PAV'T MRK
1.00
330.00
330.00
0.00
151
*
UNIT PAVERS, TY A - BITUM. SET, SF
396.00
7.10
2,811.60
0.00
152
*
RESET'G EXIST UNIT PVR AT PLAZ,SF
150.00
5.15
772.50
0.00
153
*
WATER & SAN. SERVICE AT
1.00
1,887.66
1,887.66
0.00
154
*
SPRINKLER REPAIR /MAINT., LS
1.00
533.50
533.50
0.00
155
*
RAILROAD PROT. INSUR. PREM., LS
1.00
2,875.00
2,875.00
0.00
128
1 -1/2" I.D. PIPE HANDRAIL, FT
31.00
100.00
3,100.00
0.00
148
*
SUBSTANTL COMPLETN BONUS,
39.00
2,000.00
78,000.00
Amount of original Contract 1,141,312.55
Totals
$90,310.26
$0.00
Net Chance
$90,310.26
$0.00
Net r.hanae to date $ - 74,859.02 % of contract nrice 6.50%
Location and Reason for the Chance of Each Item. 150 - Additional nav't mrkas added to contract renuired enuimmnt
151 - Plan quanity did not distinguish between Type A sand set and bitum. set. Only Type A bitum. set was paid with this item.
152 - Existing pavers located adjacent to new pavers required extra cuts and compaction for proper construction.
153 - One each additional water and sanitary services were laid for future plans of a water fountain.
154 - Sprinkler system in Budnik plaza required repair and maintainance for future water fountain.
155 - Railroad insurance was required for construction of paver sidewalk within four feet of metra platform.
128 - Additional handrails were required for handicap access to Metra
/
Ji / AI !_
148 - Substantial completion was reach 39 days ahead of schedule.
Iresi /nt /
cc: Project File
BC -1215 (Rev. 6/96)
IL 494 -0452