R-110-00 11/27/00RESOLUTION R RESOLUTION AUTHORIZING CONTRACT CHANGE ORDER FOR CONSTRUCTION SERVICES RENDERED IN CONJUNCTION WITH THE CANAL STREET RECONSTRUCTION PROJECT WHEREAS, the Village of Lemont has previously awarded a construction contract to D Construction, Inc. for the Canal Street Reconstruction Project; and WHEREAS, the Village of Lemont has determined that certain changes to the contract totaling a negative ($74,859.02) are necessary to satisfactorily complete the construction project; and WHEREAS, the contract changes are a result of final quantities as measured in place and changes that were not originally contemplated at the time the contract was awarded. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Contract Change Order with to D Construction, Inc in the negative amount of ($74,859.02) is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 27th day of November , 2000. AYES NAYS PASSED ABSENT John Benik l/ Debby Blatzer l/ Keith Latz Connie Markiewicz Rick Rimbo Mary Studebaker Z' - ./F CH • 1 ENE SMOLLEN, Village Clerk Approved by me this 27th day of i November , 2000. iffilf 1 r A F 1 AS , Village President Attest: 7 HARLENE SM Approved to for L N, Vill lerk 2 d ✓ �Lu Ai. Alir 1 ANTONOPOUI O , Village Attorney Illinois Department Resident Engineer's Request for Authorization for Change Orders of Transportation Sheet 1 of 11 TO: District Engineer Authorization No. ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City, IL, 60416 County 1 Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Project Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16, 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station , a net length of . This change revises the total length to The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 01 EARTH EXCAVATION, CY 57.36 15.00 0.00 860.40 02 ROCK EXCAVATION, CY 20.15 300.00 0.00 6,045.00 03 REM.OF UNSUITABLE MAT'L, CY 348.20 15.00 0.00 5,223.00 04 EMBANKMENT, CY 68.00 10.00 0.00 680.00 05 POROUS GRANULAR EMBK, SPL, CY 385.00 28.00 0.00 10,780.00 06 TRENCH BACKFILL, CY 62.30 25.00 0.00 1,557.50 07 POROUS GRANULAR BACKFILL, CY 164.00 32.00 0.00 5,248.00 08 GEOTECHNICAL FABRIC, SY 1,951.00 1.20 0.00 2,341.20 09 EXPLORATION TRENCH, SPECIAL, FT 22.00 50.00 1,100.00 0.00 10 INLET AND PIPE PROTECTION, EACH 23.00 50.00 0.00 1,150.00 Amount of original Net change to date Contract $ 1,141,312.55 2.87% Totals $1,100.00 $33,885.10 $ - 32,785.10 % of contract price Net Change $0.00 $32,785.10 Location and Reason for the Change of Each Item: 01 - Final field measurements. 02 - Minimal rock excavation encountered. 03 - Undercuts for suitable subgrade less than estimated. 04 - Final field measurements. 05 - Final field measurements. 06 - Final field measurements. 07 - Undercuts for suitable subgrade less than estimated. / .*:/../ - �/ AO 08 - Undercuts for suitable subgrade less than estimated. 09 - Exisitng conditions were different than utility atlases. 10 - Item not required for construction. • it I %' cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department Resident Engineer's Request for Authorization for Change Orders of Transportation Sheet 2 of 11 TO: District Engineer Authorization No. ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City, IL, 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Project Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16, 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station , a net length of . This change revises the total length to The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 11 SUB -BASE GRAN. MAT'L, 4 ", SY 120.00 4.25 0.00 510.00 12 BITUMINOUS BASE COURSE, 9 ", SY 543.00 16.80 0.00 9,122.40 13 BITUMINOUS MAT'L PRIMECOAT, GAL 65.00 2.00 0.00 130.00 14 AGGREGATE (PRIMECOAT), TON 6.70 15.00 0.00 100.50 15 BIT. CONC. BINDER COURSE, TON 49.00 35.00 1,715.00 0.00 16 BIT. CONC. SURFACE COURSE, TON 19.00 37.00 0.00 703.00 17 PROTECTIVE COAT, (SPECIAL), SY 4.00 1.00 4.00 0.00 18 P.C.C.SIDEWALK, (SPECIAL), SF 1,200.00 7.55 0.00 9,060.00 19 PAVEMENT REMOVAL, SY 2,056.00 10.00 20,560.00 0.00 21 COMB. CURB & GUTTER REMOVAL 183.00 3.50 0.00 640.50 Amount of original Net change to date Contract $ 1,141,312.55 2.70% Totals $22,279.00 $20,266.40 $ - 30,772.50 % of contract price Net Change $2,012.60 $ 0.00 Location and Reason for the Change of Each Item: 11 - Final field measurements. 12 - Final field measurements. Actual SQ YD paved was less than plan estimated area. 13 - Final field measurements. 14 - Item not used in construction. 15 - Final field measurements. 16 - Final field measurements. 17 - Final field measurements. r ../i.- /wv. 18 - Removed areas were less than estimated plan quantity. 19 - Miscalculation in plan quantity underestimated actual removed areas. 20 - Final field measurements. /" °si. -'t cc: Project File v BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department of Transportation Sheet 3 of 11 TO: District Engineer Authorization No. Resident Engineer's Request for Authorization for Change Orders ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City, IL, 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Project Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16, 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station revises the total length to to Station , a net length of . This change The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 22 COMB. C &G REM & REPLACE, FT 0.60 60.00 0.00 36.00 23 CLASS D PATCHES, TY -II, 12 ", SY 12.00 75.00 0.00 900.00 25 CLASS D PATCHES, TY -IV, 12 ", SY 27.00 70.00 0.00 1,890.00 26 CLASS MS CONCRETE, CY 86.00 600.00 0.00 51,600.00 27 STORM SEWERS, CL A, T -1, 12 ", FT 51.00 22.00 0.00 1,122.00 28 STORM SEWERS, CL A, T -1, 15 ", FT 8.00 24.00 0.00 192.00 29 STORM SEWERS, CL A, T -2, 12 ", FT 9.00 22.00 0.00 198.00 30 STORM SEWERS, CL A, T -2, 15 ", FT 11.00 24.00 0.00 264.00 31 STORM SEWERS, CL A, T -2, 18 ", FT 1.00 35.00 35.00 0.00 32 STORM SEWERS, CL B, T -1, 8 ", FT 302.50 20.00 6,050.00 0.00 Amount of original Net change to date Contract $ 1,141,312.55 7.10% Totals $6,085.00 $56,202.00 $ - 80,889.50 % of contract price Net Change $0.00 $50,117.00 Location and Reason for the Change of Each Item: 22 - Final field measurements. 23 - Item not used for construction. 25 - Final field measurements. 26 - No sidewalk vaults were encountered. 27 - Final field measurements. 28 - Final field measurements. 29 - Final field measurements. Ag i ; /A 30 - Final field measurements. 31 - Final field measurements. 32 - Contract called for water main quality pipe which was not required. r ''' cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department of Transportation Sheet 4 of 11 TO: District Engineer Authorization No. Resident Engineer's Request for Authorization for Change Orders County Cook Section 98 - 00028 - 00 - GL ❑ In -house "/ Consultant Route Canal Street Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City. IL. 60416 District Contract No. C - 91 - 314 - 99 Job No. Proiect Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date Novemeber 16. 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station , a net length of . This change revises the total length to The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 33 STORM SEWER REMOVAL, 12" 15.00 12.00 180.00 0.00 34 DUCTILE IRON WATER MAIN, 6 ", FT 8.00 30.00 0.00 240.00 35 DUCTILE IRON WATER MAIN, 8 ", FT 19.00 30.00 0.00 570.00 36 DUCTILE IRON WATER MAIN, 10 ", FT 19.00 57.00 0.00 1,083.00 38 FIRE HYDRANTS, EACH 1.00 2,000.00 0.00 2,000.00 47 VALVE VAULT,TY -A, 5' DIA, EACH 2.00 1,400.00 0.00 2,800.00 51 VALVE VAULT TO BE ADJUSTED 1.00 250.00 0.00 250.00 Amount of oriainal Contract 1,141,312.55 Totals $ 180.00 $6,943.00 Net chance to date $ -87,652.50 % of contract nrice 7.70% Net Chance $0.00 $6,763.00 Location and Reason for the Chance of Each Item. 33 - Final field measurements 34 - Final field measurements. 35 - Final field measurements. 36 - Final field measurements. 38 - Existing fire hydrant at southwest corner of Canal St. and Stephens St. was reused. 47 - Valve vault at Stephens St. was replaced with a valve box and valve vault in Metra parking lot was not required. 51 - Final field measurements. a ` / . - .ident cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department Resident Engineer's Request for Authorization for Change Orders of Transportation Sheet 5 of 11 TO: District Engineer Authorization No. ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City, IL, 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Project Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16, 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station , a net length of . This change revises the total length to The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Itern Description and Unit Quantity Unit Price Addition Deduction 52 REMOVING MANHOLES, EACH 1.00 250.00 0.00 250.00 53 REMOVING CATCH BAINS, EACH 1.00 200.00 200.00 0.00 55 COMB. CONC. CURB & GUTTER, 19.00 12.50 237.50 0.00 56 ENGINEER'S FIELD OFFICE, CAL MO 9.00 1,600.00 0.00 14,400.00 57 SIGN PANEL - TYPE 1, SF 1.00 25.00 0.00 25.00 60 RELOCATE SIGN PANEL ASSEM., EA 2.00 100.00 200.00 61 METAL POST - TYPE A 11.00 15.00 0.00 165.00 Amount of original Net change to date Contract $ 1,141,312.55 8.90% Totals $ 637.50 $14,840.00 $ - 101,855.00 % of contract price Net Change $0.00 $14,202.50 Location and Reason for the Change of Each Item: 52 - Final field measurements. 53 - Final field measurements. 55 - Final field measurements. 56 - No field office was required or used. 57 - Final field measurements. 60 - Final field measurements. 61 - Final field measurements. //„ tom:: AttriEW cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department Resident Engineer's Request for Authorization for Change Orders of Transportation Sheet 6 of 11 TO: District Engineer Authorization No. ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City, IL, 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Project Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16, 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station , a net length of . This change revises the total length to The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 62 THERMO PAV'T MRK'G - LINE 4 ", FT 576.00 0.85 489.60 0.00 63 THERMO PAV'T MRK'G - LINE 6 ", FT 120.00 1.28 153.60 0.00 64 THERMO PAV'T MRK'G - LINE 8 ", FT 40.00 1.70 0.00 68.00 65 THERMO PAV'T MRK'G - LINE 12 ", FT 97.00 2.55 0.00 247.35 66 THERMO PAV'T MRK'G- LINE 24 ", FT 31.00 5.00 155.00 0.00 67 PAINTED PAV'T MARKING - L &S, SF 50.00 2.75 137.50 0.00 68 CONDUIT IN TRENCH, 3/4" DIA.,GS, FT 305.00 8.00 0.00 2,440.00 72 CONDUIT PUSHED, 2" DIA., GS, FT 65.00 22.00 0.00 1,430.00 73 CONDUIT PUSHED, 5" DIA., GS, FT 158.00 35.00 0.00 5,530.00 79 TBF FOR ELECTRICAL WORK, FT 27.00 3.00 81.00 0.00 Amount of original Net change to date Contract $ 1,141,312.55 9.70% Totals $1,016.70 $9,715.35 $ -110,553.65 % of contract price Net Change $0.00 $8,698.65 Location and Reason for the Change of Each Item: 62 - Remaked paved public parking lot and metra parking stalls. 63 - Additional parking stalls added to streetside parking along Canal Street. 64 - Final field measurements. 65 - Final field measurements. 66 - Final field measurements. 67 - Replaced RR X'ing marking on Lemont St., south of Canal St. 68 - Item not used in construction. / � 71 72 - All conduits used for electrical work were trenched rather than pushed. 73 All conduits used for electrical work were trenched rather than pushed. 79 - Final field measurements. R-.ide cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department Resident Engineer's Request for Authorization for Change Orders of Transportation Sheet 7 of 11 TO: District Engineer Authorization No. ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City, IL, 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Project Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16, 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station , a net length of . This change revises the total length to The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 84 CONC.SIDEWALK REM'L,SPEC.,SQ FT 1,100.00 2.00 2,200.00 85 CONTRLD LOW STRENGTH MAT'L, CY 5.00 85.00 425.00 86 DUST CONTROL, SPECIAL , SQ YD 3,353.00 1.00 3,353.00 87 FOAMGLAS INSULATION, 5 ", FT 25.00 20.00 500.00 88 LIGHT POLE FOUNDATION, EACH 2.00 950.00 1,900.00 0.00 89 LIGHT POLE FOUNDATION SPEC, EA 2.00 1,200.00 0.00 2,400.00 92 ELECTRIC CABLE IN CONDUIT, FT 63.00 1.10 69.30 0.00 94 UNIT DUCT, 3 -1 /C NO.4, 1 ", FT 597.00 5.75 3,432.75 0.00 96 PRESSURE CONNECTION, 4 "X10 ", EA 1.00 3,500.00 0.00 3,500.00 97 REMOVE VALVE AND VAULT, EACH 1.00 550.00 0.00 550.00 Amount of original Net change to date Contract $ 1,141,312.55 10.30% Totals $5,402.05 $12,928.00 $ - 118,079.60 % of contract price Net Change $0.00 $7,525.95 Location and Reason for the Change of Each Item: 84 - No sidewalk vaults were encountered. 85 - Final field measurments. 86 - Final field measurments. 87 - Final field measurments. 88 - Since no sidewalk vaults were encountered regular LP Foundations were placed instead of Special LP foundations. 89 - Since no sidewalk vaults were encountered regular LP Foundations were placed instead of Special LP foundations. 92 - Final field measurments. 94 - Plan quantities underestimated the amount required for construction. 96 - Public works shut off water rather than making a pressure connection. 97 - Item not used in construction. 9 ent �j cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department of Transportation Sheet 8 of 11 TO: District Engineer Authorization No. Resident Engineer's Request for Authorization for Change Orders ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City, IL, 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Project Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16, 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station , a net length of . This change revises the total length to The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 98 SANITARY SERVICE CONNECTNS,EA 16.00 600.00 0.00 9,600.00 101 STORM SEWER (WMQ), 8 ", FT 211.00 32.00 0.00 6,752.00 102 STORM SEWER (WMQ), 12 ", FT 36.00 37.00 1,332.00 0.00 105 VALVE AND VAULT 10" 1.00 2,500.00 2,500.00 0.00 106 WATER MAIN ENCASED 7.40 55.00 0.00 407.00 109 PRESSURE CONNECTION, 6 "X10" 1.00 3,500.00 0.00 3,500.00 110 SANITARY SEWER, TYPE 1, 10" 12.00 62.00 0.00 744.00 111 SAWING PAVEMENT(FULL DEPTH),FT 901.00 2.00 0.00 1,802.00 112 FUL DPTH CONC. SW & DW REM, SF 2,100.17 1.50 0.00 3,150.26 113 FUL DPTH ASPHLT SW & DW REM, SF 2,083.05 1.20 0.00 2,499.66 Amount of original Net change to date Contract $ 1,141,312.55 12.50% Totals $3,832.00 $28,454.92 $ - 142702.52 % of contract price Net Change $0.00 $24,622.92 Location and Reason for the Change of Each Item: 98 - Only one sanitary service was enocountered during construction. 101 - Circumstances did not require the use of water main quality pipe for construction. 102 - Final field measurements. 105 - An additional valve and vault, 10 ", was used in place of a 6 "x10" pressure connection and valve vault. 106 - Final field measurements. 109 - Existing conditions in metra parking lot did not require the use of a 6 "x10" pressure connection. 110 - Final field measurements. /'/ ,'1 e 111 - The M.O.T. plan was changed reducing required quantity. 112 - Removal areas for contract limits over estimated plan quantity. 113 - Removal areas for contract limits over estimated plan quantity. Re id,9Y cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department of Transportation Sheet 9 of 11 TO: District Engineer Authorization No. Resident Engineer's Request for Authorization for Change Orders ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City. IL. 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Proiect Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16. 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station revises the total length to , a net length of . This change The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 114 SOIL EXCAVATION AND REMOVAL,CY 18.00 35.00 0.00 630.00 115 UNIT PAVERS TY A - SAND SET, SF 1,966.60 5.55 0.00 10,914.63 116 UNIT PAVERS TY B - SAND SET, SF 432.80 5.55 2,402.04 0.00 117 UNIT PAVERS TY C - SAND SET, SF 565.50 5.55 0.00 3,138.52 118 UNIT PAVERS TY C - BITUM. SET, SF 34.00 7.10 0.00 241.40 119 UNIT PAVERS TACTILE - BIT. SET, SF 51.00 9.90 0.00 504.90 120 CONCRETE HEADERS (6 "X6 ") 14.30 900.00 0.00 12,870.00 121 FINISH CONCRETE 14.13 225.00 0.00 3,179.25 122 6" P.C.C. UNDERLAYMENT 28.80 200.00 5,760.00 0.00 123 9" P.C.C. UNDERLAYMENT 16.70 200.00 0.00 3,340.00 Amount of original Net chance to date Contract 1,141,312.55 14.80% Totals $8,162.04 $34,818.70 $ - 169,359.18 % of contract nrice Net Chance $0.00 $26,656.66 Location and Reason for the Chance of Each Item: 114 - Final field measurements 115 - Plan quanity did not distinguish between Type A sand set and bitum. set. Only Type A sand set was paid with this item. 116 - Sidewalks on Lemont Street between Canal Street and railroad tracks was added to the contract. 117 - Sidewalks on Lemont Street between Canal Street and railroad tracks was added to the contract. 118 - Final field measurements. 119 - Final field measurements. 120 - Plan quantity was overestimated. 2 l' l 121 - Final field measurements. 122 - 6" P.C.C. underlayment was used for building pedestrian entrances. Y 9 123 - 9" P.C.C. underlaymt was not used for building pedestrian entrances. v� Rent cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department Resident Engineer's Request for Authorization for Change Orders of Transportation Sheet 10 of 11 TO: District Engineer Authorization No. ❑ In -house [Si Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City. IL. 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Proiect Canal St. Improvement Fund Tvpe Operation Green Lt. CCS Code Date November 16. 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station revises the total length to , a net length of . This change The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. Item Description and Unit Quantity Unit Price Addition Deduction 124 ROUGH CONC. FOOTINGS, CY 6.45 325.00 0.00 2,096.25 125 LOW STONE WALLS(VERT. 15.00 18.70 0.00 280.50 131 BENCHES, EACH 1.00 1,150.00 1,150.00 0.00 134 SHADE TREES - 3" CAL., EACH 1.00 550.00 0.00 550.00 144 TOPSOIL, CY 10.00 55.00 550.00 0.00 145 * 10" VALVE AND VALVE BOX, EACH 2.00 1,565.00 3,130.00 0.00 146 * REMOVAL OF UNSUITABLE MAT'L,LS 1.00 546.60 546.60 0.00 147 * PAV'T MRK'G REMOVAL, SF 127.00 1.65 209.55 0.00 149 * 8 "X10" CONNECTION AT ED B. DR.,LS 1.00 1,530.50 1,530.50 0.00 Amount of oriainal Contract 1,141,312.55 Totals $7,116.65 $2,926.75 Net Chanae $4,189.90 $0.00 Net chance to date S - 165,169.28 % of contract nrice 14.40% Location and Reason for the Chanae of Each Item. 124 - Final field measrements 125 - Final field measrements. 131 - Sidewalks and a bench on Lemont Street between Canal Street and railroad tracks were added to the contract. 134 - Final field measurements. 144 - Final field measurements. 145 - Existing conditions required the use of valve boxes rather than valve vaults. 146 - Unsuitable material removed in front of Lemont Rental, not on plans. / j// . _ C '' -7,/ 147 - Existing permanent tape markings removed to replace with thermo. 149 - Existing conditions required an 8 "x10" tee instead of a pressure conct. / ' R= , -ident cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452 Illinois Department Resident Engineer's Request for Authorization for Change Orders of Transportation Sheet 11 of 11 TO: District Engineer Authorization No. ❑ In -house ® Consultant Contractor "D" Construction, Inc. Address 1488 South Broadway Coal City. IL. 60416 County Cook Section 98 - 00028 - 00 - GL Route Canal Street District Contract No. C - 91 - 314 - 99 Job No. Proiect Canal St. Improvement Fund Type Operation Green Lt. CCS Code Date November 16. 2000 I recommend that a change be made as follows to the above contract: An addition extension deduction will be made from Station to Station , a net length of . This change revises the total length to The estimated quantities are show below. The first addition of an item not in the original contract under the fund type or county is indicated by asterisk ( *). Item No. * Item Description and Unit Quantity Unit Price Addition Deduction 150 * RE- MOBILIZATN FOR AD PAV'T MRK 1.00 330.00 330.00 0.00 151 * UNIT PAVERS, TY A - BITUM. SET, SF 396.00 7.10 2,811.60 0.00 152 * RESET'G EXIST UNIT PVR AT PLAZ,SF 150.00 5.15 772.50 0.00 153 * WATER & SAN. SERVICE AT 1.00 1,887.66 1,887.66 0.00 154 * SPRINKLER REPAIR /MAINT., LS 1.00 533.50 533.50 0.00 155 * RAILROAD PROT. INSUR. PREM., LS 1.00 2,875.00 2,875.00 0.00 128 1 -1/2" I.D. PIPE HANDRAIL, FT 31.00 100.00 3,100.00 0.00 148 * SUBSTANTL COMPLETN BONUS, 39.00 2,000.00 78,000.00 Amount of original Contract 1,141,312.55 Totals $90,310.26 $0.00 Net Chance $90,310.26 $0.00 Net r.hanae to date $ - 74,859.02 % of contract nrice 6.50% Location and Reason for the Chance of Each Item. 150 - Additional nav't mrkas added to contract renuired enuimmnt 151 - Plan quanity did not distinguish between Type A sand set and bitum. set. Only Type A bitum. set was paid with this item. 152 - Existing pavers located adjacent to new pavers required extra cuts and compaction for proper construction. 153 - One each additional water and sanitary services were laid for future plans of a water fountain. 154 - Sprinkler system in Budnik plaza required repair and maintainance for future water fountain. 155 - Railroad insurance was required for construction of paver sidewalk within four feet of metra platform. 128 - Additional handrails were required for handicap access to Metra / Ji / AI !_ 148 - Substantial completion was reach 39 days ahead of schedule. Iresi /nt / cc: Project File BC -1215 (Rev. 6/96) IL 494 -0452