R-07-00 01/24/2000RESOLUTION
RESOLUTION AUTHORIZING APPROVAL OF A
SUPPLEMENTAL ENGINEERING AMENDMENT NO. 1
WITH TRANSYSTEMS CORPORATION FOR
STATE STREET IMPROVEMENT PROJECT
WHEREAS, the Village of Lemont required supplemental construction observation
engineering services related to the State Street Improvement Project; and
WHEREAS, the Village utilized the firm of TranSystems Corporation for such engineering
services; and
WHEREAS, the Village and TranSystem have agreed to the terms and conditions of the
extra services provided, and such extra services have been approved by IDOT for seventy
percent (70 %) Federal reimbursement.
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees that
Amendment No. 1 attached hereto as Exhibit A is hereby approved.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DuPAGE, ILLINOIS ON THIS
24TH day of January, 2000.
John Benik
Debby Blatzer
Keith Latz
Connie Markiewicz
Richard Rimbo
Mary Studebaker
AYES NAYS PASSED ABSENT
v
v
v
v
NE SMOLLEN, Village Clerk
Approved by me this 24th day of January, 20j'y
'1' I
RI A
CHARLENE SMOL EN, Village Clerk
Approve • o form:
A i Ia. Attorne tilir
Date. 14 �: 0i
A. KWASNESKI, Village President
AMENDMENT NO. 1
AGREEMENT FOR CONSTRUCTION ENGINEERING SERVICES
between the
VILLAGE OF LEMONT
and
TRANSYSTEMS CORPORATION
State Street Improvements
Peiffer Avenue to Illinois Street
Section No.: 93- 00021 -00 -PV
Project No.: STPM -7003 (246)
Job No.: C -91- 159 -95
Type of Funding: STU
Existing Structure: N/A
DESCRIPTION
Construction engineering services for improvements to State Street from Peiffer Avenue to
Illinois Street, a distance of 1040 meters, in the Village of Lemont, Cook County, Illinois.
AMENDMENT NO. 1
FOR CONSTRUCTION ENGINEERING SERVICES
FOR THE
STATE STREET IMPROVEMENT
This AMENDMENT No. 1 to the original AGREEMENT is made this day of
, 2000 by and between the Village of Lemont, hereinafter referred to as the
VILLAGE, and TranSystems Corporation, 1051 Perimeter Drive, Suite 1025, Schaumburg,
Illinois, 60173, as the CONSULTANT, for professional engineering services required by the
VILLAGE for construction engineering in connection with the construction of State Street from
Peiffer Avenue to Illinois Street, a distance of 1040 meters, hereinafter referred to as the
PROJECT.
The original agreement enacted April 2, 1998 and authorized May 4, 1998 remains in place
except for the items discussed in this AMENDMENT. The circumstances that necessitate this
amendment were not reasonably foreseeable at the time the agreement was signed.
This AMENDMENT is to include additional construction engineering services due to
authorizations for contract changes for additional construction work by the Contractor that was
not previously anticipated. The limit of compensation will be increased by $23,741 to not exceed
the amount of $266,058. The fixed fee shall be increased by $2,681 to $28,558. The maximum
retainage shall be increased to $7,982.
In WITNESS WHEREOF, the parties hereto have caused the execution of this
AMENDMENT by their duly authorized officers as of the day and year first above
written.
(SEAL)
ATTEST:
(SEAL)
ATTEST:
LAGE OF LEMONT
1(4,1
Assistant Vice President
President
TRANSYSTEMS CORPORATION
By:
EXHIBIT A
APPROVAL LETTER FROM IDOT
Illinois Department of Transportation
Division of Highways /District 1
201 West Center Court/Schaumburg, Illinois 60196 -1096
LOCAL ROADS AND STREETS
Agreement for Consultant Services- Construction Engineering
Amendment #1
Village of Lemont
State Street from Peiffer Avenue to Illinois Street
Section No.: 93- 00021 -00 -PV
Project No.: STPM- 7003(246)
Job No.: C- 91- 159 -98
December 27, 1999
Mr. Charles Stenzel
TranSystems Corporation
1050 Perimeter Drive, Suite 1025
Schaumburg, IL 60173 -5058
Dear Mr. Stenzel:
RECEIVED
DEC 2 81999
We have reviewed your letter dated October 10, 1999 concerning the
justification for an Amendment #1 to the construction engineering agreement for
the subject project, and offer the following comment:
Based upon the justification, we agree on additional compensation of
$23,741. for extra engineering services due to the contractor's work
extending beyond the schedule.
Please submit four (4) copies of the Amendment reflecting our comment and
executed by the Village to this office for further processing.
If you have any questions or need additional information, please contact Ahmed
Raheem, at (847) 705 -4415.
Very truly yours,
John P. Kos, P.E.
District Engineer
By:
Nancy L. Magn 'tfs, P.E.
Bureau Chief of Local Roads and Streets
S: \Gen \Wp2\ 1223 artlemont.doc
EXHIBIT B
ADDITIONAL SERVICES
Ta vs,SvsrEMS
CC1-2PC_ -,r AT/O/V riAl
November 12, 1999
John P. Kos, P.E.
District Engineer/District 1
lllinois Department of Transportation
201 West Center Court
Schaumburg, IL 60196 -1096
Attention: Nancy L. Magnus, P.E.
Bureau Chief of Local Roads and Streets
Reference: State Street Improvements
Peiffer Avenue to Illinois Street
Section No. 93- 00021 -00 -PV
Project No. STPM- 7003(246)
Job No. C -91- 159 -95
Dear Ms. Magnus:
We have received and reviewed your letter dated October 26, 1999 concerning the justification for Amendment No. 1 for
Construction Engineering Services for the referenced project, and would like to include the following comments to
clarifying the request for an amendment to the Construction Engineering agreement.
Enclosed for your review is an estimated net cost of section to date summarizing approved authorizations for contract
changes as well as authorizations submitted to and awaiting approval by the Bureau of Construction. To date it is
estimated the additional amount of work performed to complete the project to the satisfaction of the Department is
$246,762.20, which is approximately 10.5% of the awarded contract value of $2,352,936.95. This total amount is based
on the following information, which is also shown on the attached worksheet. The approved contract changes occurred
during a time period beginning August 6, 1998 and concluding on December 16, 1998. During this time period the
additional value of worked performed by the Contractor and inspected by TranSystems Corporation totaled $171,245.85.
An additional amount of worked performed by the Contractor totaling $25,516.25 is awaiting approval by the Department.
An estimated $50,000 in additional contract changes are awaiting submittal to the Bureau of Construction pending
submittal of information from the Contractor to TranSystems Corporation.
Due to the significant increase in work required to complete the project, the Contractor was unable to meet the interim
completion date of November 30, 1998 and met the interim completion as required by the contract on December 16, 1998.
Enclosed for your review are the weekly reports showing the work performed by the. Contractor during these dates.
During this time period additional personnel was provided by TranSystems Corporation to properly inspect and document
this work as well as work performed on contract pay items.
The Contractor was allowed fifteen (15) working days beginning May 3, 1999 to complete the project in its entirety. The
Contractor resumed work on the project from February 8, 1999 to February 27, 1999 to install street lighting. The
Contractor again resumed work on March 31, 1999 in anticipation of completing the project prior to May 1, 1999. During
this time period, the Illinois Department of Transportation granted a permit to Ameritech to install conduit along the east
side of State Street under the sidewalk from Peiffer Avenue to Cass Street. This work began on April 9, 1999 and
concluded on May 14, 1999. During this time period, the Contractor made efforts to complete contract work, but was
unable to proceed at normal progress rates due to the utility conflict with Ameritech. The Contractor requested and was
granted two extensions of time based on delays incurred due to utility conflicts. TranSystems Corporation provided
1051 Perimeter Drive, Suite 1025 • Schaumburg, Illinois 60173 -5058 • Phone: (847) 605 -9600 Fax: (847) 605 -9610
Ms. Nancy Magnus
November 12, 1999
Page 2
personnel during these time periods to inspect and document work performed. Enclosed for your review are weekly
reports documenting work performed during these time periods.
Due to the significant amount of additional inspectable work performed by the Contractor which was inspected and
documented by TranSystems Corporation and due to delays caused by utility work, additional expenses were incurred by
TranSystems Corporation that were unforeseeable at the time the Construction Services Agreement was signed. We
therefore respectfully request consideration of an amendment to the agreement in the amount of $23,741, which is
proportional to the additional value of work performed by the Contractor. We have attached the Cost Estimate of
Consultant Services for Amendment #1 as previously submitted.
Thank you for you consideration in this matter. If you have any questions, please call.
Very truly yours,
TranSy _ orpor• on
Charles J. Steitz
. ,Late JOO M 1- 10U-U3
Cook County (031)
District 1
Authorization
1
2
3
4
5
6
6A
7
8
10
11
12
13
17
18
19
20
21
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Authorization
4A
39
40
41
42
uunols ueparunent of i ransportauon
Net Cost of Section
Contract Number - 83336
koute: I-AU 2632
STPM - 700312461000
93 -00021 -00 -PV
Approved Authorizations of Contract Changes
Description Net Addition Net Deduction
Detour Route $7,570.00
Install Elliptical Pipe in Lieu of 750 mm Pipe
Additional Watermain Valves $4,200.00
Fumish and Install Water Une Stops $26,990.75
Additional Water Service Connections $15,300.00
Directional Bore Water Services in lieu of Trenching $605.00
Balance of Final Quantities
Temporary Thermoplastic Pavement Markings $3,584.00
Addition of Area Reflective Crack Control $7,052.00
Remove and Replace Existing Pavement on Cass Street $11,358.00
Offset Light Pole Foundations $7,469.25
Additional Pavement Removal on State Street $20,289.00
Directional Bore Unit Duct in lieu of Trenching $4,316.25
Relocate Proposed Sanitary Sewer on State Street $16,392.50
Repair existing unknown Sanitary Utilities $8,245.25
Reconstruction of Existing Sanitary Manholes $4,463.15
Water Service Line Relocation $1,457.57
Fill Existing Sanitary Une with CLSM $1,827.68
Installation of Additional Valve Vault on State Street $11,915.02
Existing Sanitary Manhole Reconstruction $3,560.27
Relocation of Previously installed Valve Vault $3,914.31
Installation of Additional 375 mm Sanitary Line $12,037.00
Repair of Existing Combined Sewer Pipe $2,687.54
Catch Basin and D.I.P. Installation on State Street $8,793.50
Balance of Final Quantities
Balance of Final Quantities
Balance of Final Quantities
Balance of Catch Basin, Type A Quantities
Repair existing Sanitary Sewer
Additional Class D Patches
Additional Porous Granular Embankment on Cass Street
Additional Class D Patches
Water Service Installation behind Retaining Wall
Relocate Catch Basin due to Utility Conflict
Totals
Net Change
Pending Authorizations of Contract Changes
Description
Replace Damaged Une Stop Equipment
Installation of Preformed Thermoplastic Tape
Clean Catch Basin debris left by Utility Company
Install parkway Inlet and outlet pipe on Cass Street
Additional Tree Removal
$5,600.00
$2,309.95
$23,315.50
$2,197.50
$23,621.50
$1,964.03
$567.18
$157.50
$41,426.90
$26,530.15
$855.80
$3,387.50
$243,603.70 $72,357.85
$171,245.85
Net Addition Net Deduction
$1,131.60
$11,364.41
$775.34
$4,445.00
$7,800.00
Totals $25,516.35
Net Change $25,516.35
Total Net Change to Date $196,762.20
Anticipated Additional T&M and Line Item Adjustments $50,000.00
Estimated Total Value $246,762.20
Awarded Contract Value $2,352,936.95
Percent of Additional Added Work 10.49%
Page 1 of 1 11/02/1999
EXHIBIT C
COST ESTIMATE OF CONSULTANT SERVICES
ROUTE:
SECTION:
PROJECT:
COUNTY:
JOB NO.:
FAU 2632 (State Street)
93- 00021 -00 -PV
STPM -7003 (246)
Cook
C -91- 159 -95
Exhibit A
(Sheet 1 of 1)
COST ESTIMATE OF CONSULTANT SERVICES
STATE STREET IMPROVEMENT
PEIFFER AVENUE TO ILLINOIS STREET
VILLAGE OF LEMONT
SUPPLEMENT #1 FOR ADDITIONAL PHASE III ENGINEERING SERVICES
OVERHEAD RATE 146.02%
COMPLEXITY FACTOR 0
Element of Work
Employee
Classification
Number Of
Manhours
Dollars ($)
% Of
Total
Payroll
Rate
Payroll
Costs
Overhead
& Fringe
Benefits
Fixed Fee
Total
1. Construction Observation
Resident Engineer
0
$ 31.84
$ -
$ -
$ -
$ -
0.0%
2. Inspection Assistance
Resident Inspector II
320
$ 23.08
$ 7,386
$ 10,784
$ 2,463
$ 20,633
86.9%
3. Construction Layout
Survey Crew Chief
0
$ 20.40
$ -
$ -
$ -
$ -
0.0%
4. Construction Documentation
Resident Inspector II
0
$ 23.08
$ -
$ -
$ -
$ -
0.0%
5. Project Coordination
Senior Construction Manage
0
$ 33.44
$ -
$ -
$ -
$ -
0.0%
6. Survey Crew/Record Drawings
CADD Technician II
40
$ 16.36
$ 654
$ 956
$ 218
$ 1,828
7.7%
7. Vehicular Expense
—
-
-
-
$ -
-
$ 1,280
5.4%
8. Material Testing
- --
-
-
-
$ -
-
$ -
0.0%
TOTAL
360
$ 8,040
$ 11,740
$ 2,681
$ 23,741
100.0%
VEHICLE EXPENSE = 40 DAYS @ $32/DAY =
TRANSYSTEMS CORPORATION
G:\ BUSDEV\L EMONTNSTATE4CECS0915.XLSJAaua1 Manhours
$1,280
September 21, 1999