Loading...
R-27-00 02/28/2000RESOLUTION `0) RESOLUTION AUTHORIZING APPROVAL OF AN ENGINEERING AGREEMENT WITH CIVILTECH ENGINEERING, INC. IN CONJUNCTION WITH THE CANAL STREET RECONSTRUCTION PROJECT WHEREAS, the Village of Lemont requires engineering services related to the Canal Street Reconstruction Project; and WHEREAS, the Village of Lemont seeks to utilize the firm of Civiltech Engineering, Inc.; and WHEREAS, the Village and Civiltech Engineering, Inc. have negotiated an agreement to identify the terms and conditions of the services to be provided. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the supplemental agreement attached hereto as Exhibit A is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 28th day of February , 2000. AYES NAYS PASSED ABSENT John Benik Debby Blatzer Keith Latz Connie Markiewicz Rick Rimbo Mary Studebaker Approved by me this 28th Attest: v J I RLENE SMOLLEN, Village Clerk Februa , 2000. CHARLENE SMOLLEN, Village Clerk KI, Village President Approved to form: JOHN ANTONOPOULOS, Village Attorney CIVILTECH ENGINEERING, INC. 500 PARK BOULEVARD • SUITE 250 • ITASCA, ILLINOIS 60143 -1297 (630) 773 -3900 • FAX (630) 773 -3975 February 1, 2000 Mr. James L. Cainkar, P.E. Village Engineer Village of Lemont 418 Main Street Lemont, Illinois 60439 Subj: Proposal for Professional Engineering Services Resident Engineering Canal Street Roadway Improvement Project Dear Mr. Cainkar: Civiltech Engineering is pleased to present to the Village of Lemont our Proposal /Agreement for Resident Engineering services in conjunction with subject roadway improvement project. Having prepared the construction plans and documents for this project, we believe that we are uniquely qualified to provide the most comprehensive service possible for the Village. The following is our proposed scope of work, estimate of man -hours and fee. I. PROJECT OUTLINE A. Scope of Improvement This improvement consists of the reconstruction of Canal Street, between Ed Bossert Drive and Stephen Street, involving the removal of an existing concrete roadway overlaid with a bituminous surface and replacing it with a bituminous pavement. Included with this work is the installation of a new 10 -inch water main and the associated services, new storm and sanitary sewers, combined sewer separation, street lighting, streetscape improvements and landscaping. Associated with this work is the mitigation of an unknown number of existing sidewalk vaults. The project is to begin as early as April 1, 2000 with a substantial completion date of September 15, 2000 and a total completion date of October 30, 2000. B. Scope of Engineering Services The primary objective of the engineering services is to provide full -time resident inspection including construction layout, quality control and documentation. Following is our proposed scope of work for engineering services: 1). Provide geometric control including all construction staking and layout. 2). Provide quality control of the construction through full -time inspection, interpretation and enforcement of the contract documents, Standards and Specifications, IDOT Construction Manual and policies. Proposal / Agreement Resident Engineering; Canal Street Roadway Improvement Project February I , 2000 Page 2 of 3 3). Measure, compute and document pay items. 4). Maintain a daily record of the contractor's activities throughout construction including sufficient information to permit verification of the nature and cost of changes in plans and authorized extra work. 5). Prepare and submit all partial and final pay estimates, change orders, records, documentation, and reports in the required form and number of copies. 6). Assist in utility coordination during construction. 7). Provide for proportioning and testing of concrete and bituminous mixtures in accordance with the appropriate manual as issued by the Bureau of Materials and Physical Research of IDOT. 8). Revise contract drawings to reflect as -built conditions. C. Project Staff Qualifications We propose to assign Mr. John L. Breitsameter to serve as Project Manager for this project. Mr. Breitsameter has over 25 years of experience in construction engineering and resident inspection and has managed the inspection on more than 25 Federal -Aid projects. Other projects ranged from commuter parking lots to major tollway rehabilitation projects. D. Proposed Subcontractors Civiltech will provide all work for this contract with its own forces with the exception of material testing. These services will be subcontracted to Schleede Hampton & Associates, a firm specializing in material testing. Civiltech will provide coordination with the testing firm to ensure the proper notification is given for testing needs, review all material reports and include these reports into the project records. E. Work not included A significant portion of the proposed improvement involves streetscape improvements. These improvements include sidewalk paver systems, planters, trash receptacles and benches. Due to the artistic nature of some of this work, we suggest that the Village retain the services of Teska Associates, Inc., the designers of the proposed streetscape improvements, to provide a number of hours to ensure the quality of the work necessary for the desired aesthetic appearance. II. COMPENSATION A. Manhour and Direct Cost Estimate A schedule indicating our anticipated manhours is attached. You will note that we anticipate the contractor will be working from 40 to 50 hours per week, depending on the weather and controlling Route: Local Agency: Section: Proj. No.: Job No.: County: Canal Street Village of Lemont 98- 00028 -00 -GL NA NA Cook TABLE 1 COST ESTIMATE OF CONSTRUCTION SERVICES PHASE III ENGINEERING SERVICES CANAL STREET IMPROVEMENT * Firm's approved rates on file with IDOT's Bureau of Accounting and Auditing: Payroll Burden & Fringe Rate 50.79 %1 Overhead & Expense Rate 74.28% Total 125.07% Feb. 2, 2000 t.onsuitani: l.rvaiecn cngmeenng, mu. DOLLARS ($) Number Payroll ITEM Employee of Burden & Overhead Classification Manhours Payroll Payroll Fringe and Profit TOTAL Rate Costs Costs* Expenses* Construction Engineering: Resident Engineer 1439 $25.00 $ 35,975 $ 18,272 $ 26,722 $ 11,872 $ 92,841 Surveyor 144 $24.50 $ 3,528 $ 1,792 $ 2,621 $ 1,164 $ 9,105 Technician (Layout) 144 $ 16.50 $ 2,376 $ 1,207 $ 1,765 $ 784 $ 6,132 Project Manager 46 $45.00 $ 2,070 $ 1,051 $ 1,538 $ 683 $ 5,342 Direct Expenses: $ Vehicle Expense (Mileage)' $ 6,580 $ 6,580 Material Testing Subconsultant $ 12,000 $ 12,000 Printing Expense $ 250 $ 250 Photography $ 150 $ 150 TOTALS 1,773 $ 43,949 $ 22,322 $ 51,626 $ 14,503 >$ 132,400 188 Days @ 335.00 /Day CANAL STREET VILLAGE OF LEMONT ANTICIPATED CONTRACTOR'S SCHEDULE Civiltech Staffing: APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMEBER DECEMBER PLAN DAILY DAYS Res. Engr. 1439 40 40 40 40 45 45 45 45 45 45 48 ITEM QNTY. RATE REQ'D 7 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29, UTILITY COORDINATION & LAYOUT LS O N -+ tN O O Ce 0 A W A NA fJ A N GD tN N 0e Oi N A A (4 Ce A lJ 0 16 16 16 16 16 16 16 16 TRAFFIC CONTROL LS Survey Tech 144 16 16 16 16 16 16 16 16 PAVEMENT REMOVAL 1201 SY 300 Proj . Mngr. 46 2 2 2 2 2 2 2 2 2 WATERMAIN, 10',8',6' 1127 LF 150 2 2 2 2 2 2 2 2 2 2 2 2 Total: 1773 42 40 WATERMAIN INSULATION LS 47 79 47 79 47 79 50 82 50 40 82 50 82 52 84 52 84 50 50 47 47 47 45 45 PRESSURE CONNECTION 4 EA 1 40 WATER SERVICES 17 EA 4 SANITARY SEWER & MHs 156 LF 100 SAN SERVICES CONNECTIONS 17 EA 3 STORM SEWER (12 -18) & STRUCTURES 1218 LF 150 CURB & GUTTER REM OVAL 1466 LF 800 SIDEWALK REMOVAL 18640 SF 4,000 VAULTED SIDEWALK REMOVAL LS EARTH EXCAVATION 1193 CY 250 GEOTECH FABRIC 2044 SY 600 EMBANKMENT & PGE 453 CY 200 SUBBASE GRANULAR 3895 SY 1,000 COMB CONC C & G 2017 LF 400 STORM SEWER 8' 718 LF 200 BIT. BASE CSE & BINDER CSE 3753 SY 800 PATCHES 102 25 LIGHTING LS LS e STONE WALL 402 LF 50 (��� iisimum CONCRETE HEADER 2200 SF 220 BRICK PAVERS 15420 SF 1,500 PLANTINGS LS BIT CONC SURFACE CSE PAVEMENT MARKING 450 TON LS 500 CLEANUP & PUNCHLIST LS Civiltech Staffing: Res. Engr. 1439 40 40 40 40 45 45 45 45 45 45 48 48 48 40 48 48 48 50 50 50 50 48 48 45 45 45 45 45 40 40 40 40 Surveyor 144 16 16 16 16 16 16 16 16 16 Survey Tech 144 16 16 16 16 16 16 16 16 16 Proj . Mngr. 46 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Total: 1773 42 40 40 74 47 79 47 79 47 79 50 82 50 40 82 50 82 52 84 52 84 50 50 47 47 47 45 45 40 40 40 40