Loading...
R-06-01 Authorizing Award of Contract to Design Electrical Services in Conjunction with the State Street Well No.3 Motor Control Center ReplacementRESOLUTION RESOLUTION AUTHORIZING AWARD OF CONTRACT TO DESIGN ELECTRICAL SERVICES IN CONJUNCTION WITH THE STATE STREET WELL NO.3 MOTOR CONTROL CENTER REPLACEMENT WHEREAS, the Village of Lemont requires maintenance improvements be made to the State Street Well No. 3 motor controls; and WHEREAS, the Village of Lemont seeks to utilize the firm of Design Electrical Services; Inc., and WHEREAS, Design Electrical Services, Inc. has submitted a low bid for such work in the amount of $48,700.00. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Contract with Design Electrical Services Inc. is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 22nd day of January , 2001. AYES NAYS PASSED ABSENT John Benik ✓ Debby Blatzer ✓ Keith Latz `/ Connie Markiewicz V Rick Rimbo Mary Studebaker i////./1_ ARLENE SMOLLEN, Village Clerk Approved by me this 22nd day o anua 2001 Attest: CHARLENE SMOLLEN, Village Clerk ESISI Yillage Preside TABULATION OF BIDDERS Frank Novotny & Associates, Inc. PROPOSAL OF: TYPE OF SECURITY AMOUNT OF SECURITY OWNER: PROJECT: JOB NUMBER: DATE AND TIME OF BID OPENING: Village of Lemont State Street Well (No. 3) Motor Control Center Replacement 00300 January 18, 2001 @ 10:00 am 1 Design Electrical Services b7, -)�i PROPOSAL OF: TYPE OF SECURITY AMOUNT OF SECURITY BIDDER'S PROPOSAL ENGINEER'S ESTIMATE $50,000.00 1 Design Electrical Services b7, -)�i <J % 7 a 7c (f rO 0 2 Power Control Associates -- ,`-- 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 On all projects constructed under the "Standard Specifications For Road and Bridge Construction" or "Standard Specifications For Sewer and Water Main Construction ", the following bid security will be submitted (except on Special Assessments): Each Proposal shall be accompanied by either a bid bond on the Department form contained in the Proposal, executed by a Corporate Surety Company satisfactory to the Department, or by a bank cashier's check or a properly certified check for not less than five percent (5 %) of the amount of the bid, or for the amount specified in the following schedule: AMOUNT OF BID PROPOSAL GUARANTY $ Up to $ 5,000 $ 150 5,000 10,000 300 10,000 50,000 1,000 50,000 10,000 3,000 100,000 150,000 5,000 150,000 250,000 7,500 250,000 500,000 12,500 500,000 1,000,000 25,000 1,000,000 1,500,000 50,000 1,500,000 2,000,000 75,000 2,000,000 3,000,000 100,000 3,000,000 5,000,000 150,000 5,000,000 7,500,000 250,000 7,500,000 10,000,000 400,000 10,000,000 15,000,000 500,000 15,000,000 20,000,000 600,000 20,000,000 25,000,000 700,000 25,000,000 30,000,000 800,000 30,000,000 35,000,000 900,000 Over 35,000,000 1,000,000 Checks or drafts shall be made payable to the MUNICIPAL TREASURER. On ALL SPECIAL ASSESSMENT projects, cash, or a check, CERTIFIED BY A RESPONSIBLE BANK, will be required in an amount not Tess than ten percent (10 %) of the amount of the bid, payable to the "PRESIDENT OF THE BOARD OF LOCAL IMPROVEMENTS." inois ❑ 60521 ❑ 630- 887 -8640 ❑ fax: 630 - 887 -0132 / CFRANK NOVOTNY 8 ASSOCIATES, INC. ONSUL T /NG CIVIL ENGINEERS January 18, 2001 Mr. Stephen May, P.E. Village Engineer Village of Lemont 418 Main Street Lemont, IL. 60439 Re: State Street Well (No. 3) Motor Control Center Replacement Dear Steve: Enclosed is a copy of the "Tabulation of Bids" for the bids that were received and opened for the above - captioned project today. One (1) bid was received and was found to be without error. The low bidder was Design Electrical Services, Inc., submitting a bid in the amount of $48,700.00, which was $1,300.00 (2.60 %) below the Engineer's Estimate of $50,000.00. We have checked references of Design Electrical Services, Inc., and they appear to be qualified to do this type of work. We, therefore, recommend that the Contract be awarded to Design Electrical Services, Inc., in the amount of $48,700.00. Please call if you have any questions regarding this matter. Very truly urs, F' L �'�l►, VOT Y & ASSOCIATES, INC. 0 825 midway drive ❑ wi JLC/ce Enclosure cc: Mr. Gary Holmes, Adm., w /Enc. Mr. Dan Fielding, Dir. of P.W., w /Enc. Project File No. 00300 ainkar, P.E., P.L.S. Date: 1/18101 OWNER: TABULATION OF BIDS Village of Lemont PROJECT DESCRIPTION: State Street Well (No. 3) Motor Control Center Replacement • • Page 1 Of 1 PROJECT NO : 00300 Engineers Estimate Design Electrical Services 7701 Grant St., Unit B Burr Ridge, IL. 60521 5% Bid Bond Item Unit Unit Unit No Description Unit Quantity Price Amount Price Amount Price Amount I. Base Bid For the removal and disposal of existing Motor Control Center and replacement with new Motor Control Center and Service Entrance, including MCC's supporting structures, bus systems, starter units, starters, disconnects, overload protection, surge suppressors, and complete connection to existing ComEd 480 -volt, 3 -wire ungrounded service, conductors, existing well pump, and other electrical component requirements, complete in place . . L.S. 1 50,000.00 50,000.00 48,700.00 48,700.00 Totals: 50,000.00 48,700.00 Bid Error Corrections: Corrected Totals - - - 48,700.00 Over 1 Under - - - - - 1,300.00 Percent - - - - -2.60%