Loading...
R-33-03 05/12/03RESOLUTION RESOLUTION AUTHORIZING APPROVAL OF AN ENGINEERING AGREEMENT WITH FRANK NOVOTNY & ASSOCIATES, INC. IN CONJUNCTION WITH THE HERITAGE QUARIES PEDESTRIAN BRIDGES PROJECT WHEREAS, the Village of Lemont requires engineering services related to the Heritage Quaries Pedestrian Bridges Project; and WHEREAS, the Village of Lemont seeks to utilize the firm of Frank Novotny & Associates, Inc.; and WHEREAS, the Village and Frank Novotny & Associates, Inc. have negotiated an agreement to identify the terms and conditions of the services to be provided. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the agreement attached hereto as Exhibit A is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 12th day of May , 2003. Debby Blatzer Peter Coules Steven Rosendahl Ronald Stapleton Brian Reaves Jeanette Virgilio AYES NAYS PASSED ABSENT J C ARLENE SMOLLEN, Village Clerk Approved by me this 12th day of May , 2003. JOHN ` IAZZA, Village ''esident Attest: Approved as to form: JOHN ANTONOPOULOS, Village Attorney Owner: Village of Lemont Address: 418 Main Street City: Lemont, IL 60439 Project No.: 02226 L 0 A L A G E N C Y AGREEMENT FOR ENGINEERING SERVICES FOR CONSTRUCTION GUIDANCE C 0 N S U L T A N T Engineer: Frank Novotny & Associates, Inc. - Address: 825 Midwa Drive City: Willowbrook State: Zip: Illinois 60527 -- - - - - -- -_ , 2003, THIS AGREEMENT, made and entered into this day of by and between FRANK NOVOTNY & ASSOCIATES, INC., whose ,address is 825 Midway OF Drive, Willowbrook, Illinois, 60527, hereinafter called the "ENGINEER", he hereinafter called the LEMONY, whose address is 418 Main Street, Lemont, icllesoin' connection with the proposed "OWNER" covers certain professional Engineering ent designated as HERITAGE a UARRIES PEDESTRIAN BRIDGES, which s scope of of improvem 10 -foot wide pedestrian b g construction work consists of the construction of four (4) s Ien ths, located along the Illinois & Michigan Canal, at the Heritage Quarries in the vanou g Village of Lemont. WITNESSETH THAT, in consideration of these premises and of the mutual covenants herein set forth, THE ENGINEER AGREES, To perform or be responsible for the performance of the following Construction I p Management and Engineering Services for the Owner in connection with the proposed improvement hereinbefore described: a. Furnish construction guidance, which shall include: changes 1. Consultation on interpretation of Plans and Specifications and any 9 under consideration as construction proceeds. 2. Part-time job-site ob -site observation by the Engineer, or his representatives, as construction progresses. 3. Oversee the testing of sewer and /or water ter lines in the dermine cw ether the completed project meets the requirements Page 1 of 5 EXECUTED BY THE OWNER, this day of , 2003. ATTEST: VILLAGE OF LEMONT 418 MAIN STREET LEMONT, ILLINOIS 60439 By: /z) ,X?,17/e9,�� Approved As To Form: Printed Name/Title: Charlene M. Smollen, Clerk SEAL * * * * * * * * ** John Antonopoulos, Attorney EXECUTED BY THE ENGINEER, this 5th day of May, 2003. ATTEST: By: FRANK NOVOTNY & ASSOCIATES, INC. 825 MIDWAY DRIVE WILLOWBROOK, ILLINOIS 60527 By: Printed Name/Title: James L. Cainkar, President Printed Name/Title: SEAL Gea Secreta Page 5 of 5 BACKUP DATA TO CONTRACT PROPOSAL DATE 05/05/03 PAGE 1 of 1 A/E Firm and Location Frank Novotny & Associates, Inc., 825 Midway Drive, Willowbrook, IL 60527 SPECIFY PHASE OF WORK Construction Guidance Services ESTIMATOR James L. Cainkar, P.E. Job Title Heritage Quarries Pedestrian Bridges, Lemont, IL JOB LOCATION Along I & M Canal DIRECT LABOR COSTS PRODUCTION ELEMENT ENGINEERING DRAFTING TYPING (if not indirect) HOURS I RATE TOTAL HOURS RATE TOTAL HOURS RATE TOTAL For Design and Inspection Construction Project Director 20 119.00 $2,380.00 Resident Engineer 80 102.00 $8,160.00 Engineering Technician 40 78.00 $3,120.00 Part-Time Summer Help 20 40 $ 800.00 TOTAL $14,460.00 FEE ESTIMATE DIRECT LABOR COSTS (DLC) COMBINED OVERHEAD ( OTHER DIRECT EXPENSES CADD PHONE OVERNIGHT DELIVERY SURVEY WORK PRINTING SUMMARY % OF DCL) (Included in Direct Labor Rate) SUB -TOTAL TOTAL FEE $14,460.00 $3,600.00 1,800.00 MATERIAL TESTING & INSPECTION 1,800.00 PROFIT ( % of Sub - Total) TRAVEL VEHICLES AUTO MILEAGE PER DIEM OTHER (Included in Direct Labor Rate) N/A $18,060.00 N/A N/A N/A $18,060.00 NOTE: Consultants or Subcontractors use same forms. SPK FORM 476 1 MAY 87 Previous editions are obsolete Project #02226