Loading...
R-46-03 Authorizing Award of Contract To K-Five Construction Corp. In Conjunction With The Country Lane/Court Reconstruction ProjectRESOLUTION RESOLUTION AUTHORIZING AWARD OF CONTRACT TO K -FIVE CONSTRUCTION CORP. IN CONJUNCTION WITH THE COUNTRY LANE /COURT RECONSTRUCTION PROJECT WHEREAS, the Village of Lemont requires construction services for pavement and utilitiy improvements along Country Lane and Country Court; and WHEREAS, the Village of Lemont seeks to utilize the construction firm of K -Five Construction Corp.; and WHEREAS, K -Five Construction Corp. has submitted a low bid for such work in the amount of $424,969.05. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the award of contract with K -Five Construction Corp. is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 23rd day of June , 2003. Debby Blatzer Peter Coules Steven Rosendahl Ronald Stapleton Brian Reaves Jeanette Virgilio AYES NAYS PASSED ABSENT CHARLENE SMOLLEN, Village Clerk Approved by me this 2lyd day of June , 2003. Attest: IAZZA, Villag Presi CHARLENE SMOLLEN, Village Clerk Approved as to form: JOHN ANTONOPOULOS, Village Attorney N Cr) 9 CO 00 O Co) CO 0 O t(0 00 ti 00 00 O M CO 0 ti N 0 O CO _N �O O O L .0 3 O .3 d 'o > cc N CO FRANK NOVOTNY a ASSOCIATES, INC. CONSULTING C /V /L ENGINEERS Mr. Gary Holmes Administrator Village of Lemont 418 Main Street Lemont, Illinois 60439 c LE i AV 9 ?0 VU?TEOFLE CNT F .. , VENT Re: Country Lane / Country Court Paving & Water Main Improvements And Kromray Road Resurfacing Dear Gary: May 27, 2003 Listed below and on the attached "Bid Tabulation ", please find the results of the bid opening for the above - captioned project, as bid on May 22, 2003 @ 10:00 am. Four (4) bids were received and tabulated, with one error being found that did not affect the order of the bids. K -Five Construction Corp $ 424,969.05 Brothers Asphalt Paving, Inc 429,069.00 Johnson Blacktop, Inc 472,027.43 James D. Fiala Paving Company, Inc. 496,119.20 Engineer's Estimate $ 452,599.50 This project consist of the complete reconstruction of Country Lane, from Fourth Street to Kromray Road, and the Country Court cul-de -sac; including a new water main with services to each lot. Also included is the repair and resurfacing of Kromray Road, from Country Lane to McCarthy Road. The low bid submitted by K -Five Construction Corp., in the amount of $424,969.05, is $27,630.05 (6.10 %) below the Engineer's Estimate of $452,599.50. Since K -Five Construction Corp. is qualified to perform this type of work, we therefore recommend that the Contract be awarded to K -Five Construction Corp., 13769 Main Street, Lemont, IL 60439, in the amount of $424,969.05. Should you have any questions conceming this matter, please do not hesitate to contact me. Very truly yours, FRANK 0 s� AND �1 SOCIATES, INC. JLC/debi Enclosure cc: Mr. Stephen May, P.E., w /Encl. Mr. Dan Fielding, Dir. of PW, w /Enc. Project File No. 02021 James L. Cainkar, ., P.L.S. Date: 5/27/03 OWNER: PROJECT DESCRIPTION: BID OPENING: TABULATION OF BIDS Village of Lemont Country Lane /Country Court Paving & Water Main Improvements and Kromray Road Resurfacing • Page 1 Of 2 PROJECT NO : 02021 - - ____'"__ _____.._ Engineers Estimate K -Five Construction Corp. 13769 Main Street Lemont, IL 60439 5% Bid Bond Brothers Asphalt Paving 1340 Horseshoe Court Addison, IL 60101 5% Bid Bond Johnson Blacktop, Inc. 825 Hicks Drive Elburn, IL 60119 5% Bid Bond James u. rtata Paving Company, Inc. 500 E. Frontage Rd North Bolingbrook, IL 60440 5% Bid Bond Item Unit Unit Unit Unit Unit No Description Unit Quantity Price Amount Price Amount Price Amount Price Amount Price Amount 1 Earth Excavation C.Y. 800 26.50 21,200.00 13.50 10,800.00 18.00 14,400.00 19.40 15,520.00 18.00 14,400.00 2 Pavement Removal S.V. 3500 8.00 28,000.00 5.00 17,500.00 6.00 21,000.00 2.98 10,430.00 10.00 35,000.00 3 Driveway Pavement Removal S.Y. 650 8.00 5,200.00 8.00 5,200.00 3.00 1,950.00 6.20 4,030.00 13.00 8,450.00 4 Concrete Driveway Pavement Removal S.Y. 35 10.00 350.00 8.00 280.00 9.00 315.00 18.00 630.00 23.00 805.00 5 Sidewalk Removal S.F. 265 1.50 397.50 2.00 530.00 1.50 397.50 2.00 530.00 3.00 795.00 6 Bituminous Surface Removal, 2 -1/2" S.Y. 4939 2.50 12,347.50 2.80 13,829.20 1.40 6,914.60 2.31 11,409.09 2.50 12,347.50 7 Aggregate (Prime Coat) TON 5 40.00 200.00 50.00 250.00 10.00 50.00 36.00 180.00 33.00 165.00 8 Geotechnical Fabric for Ground Stabilization S.Y. 3763 1.50 5,644.50 1.20 4,515.60 1.30 4,891.90 0.80 3,010.40 2.90 10,91230 9 Porous Granular Embankment, Subgrade (PGES) C.V. 200 32.00 6,400.00 40.00 8,000.00 40.00 8,000.00 37.00 7,400.00 31.00 6,200.00 10 Aggregate Base Repair TON 200 20.00 4,000.00 16.00 3,200.00 15.00 3,000.00 10.00 2,000.00 14.00 2,800.00 11 Subbase Granular Material, Type B, 4' S.Y. 3763 3.00 11,289.00 3.25 12,229.75 3.00 11,289.00 2.40 9,031.20 2.50 9,407.50 12 Bituminous Materials (Prime Coat) TON 3 280.00 840.00 225.00 675.00 150.00 450.00 317.00 951.00 240.00 720.00 13 Superpave Bituminous Base Course, N50, 6" S.Y. 3200 12.00 38,400.00 10.65 34,080.00 11.00 35,200.00 11.43 36,576.00 13.00 41,600.00 14 Area Reflective Crack Control Treatment S.Y. 5000 0.75 3,750.00 1.00 5,000.00 1.00 5,000.00 1.02 5,100.00 0.92 4,600.00 15 Bituminous Concrete Binder Course, Superpave, Mixture B, N30, 1 -1/2' TON 300 40.00 12,000.00 33.00 9,900.00 35.00 10.500.00 33.85 10,155.00 39.00 11,700.00 16 Bituminous Concrete Surface Course, Superpave, Mixture C, N30, 1 -1/2" TON 760 43.00 32,680.00 39.00 29,640.00 36.00 27,360.00 38.60 29,336.00 40.00 30,400.00 17 Leveling Binder (Machine Method), Superpave, N30, 1' Avg. Thickness TON 330 43.00 14,190.00 38.00 12,540.00 36.00 11,880.00 38.60 12,738.00 40.50 13.365.00 18 Combination Concrete Curb and Cutter, Type B -6.12 FOOT 2200 15.00 33,000.00 10.50 23,100.00 10.00 22,000.00 12.40 27.280.00 11.00 24,200.00 19 Incidental Bituminous Surfacing (for Driveways), 2 -1/2' TON 130 100.00 13,000.00 68.00 8,840.00 45.00 5,850.00 81.00 10,530.00 115.00 14,950.00 20 Aggregate Base Course, Type B, 6" S.Y. 650 10.00 6,500.00 6.50 4,225.00 5.00 3,250.00 6.00 3,900.00 13.00 8,450.00 21 Portland Cement Concrete Driveway Pavement, 6' S.Y. 40 25.00 1,000.00 29.00 1,160.00 30.00 1,200.00 48.00 1,920.00 36.00 1,440.00 22 Portland Cement Concrete Sidewalk, 5" S.F. 400 3.00 1,200.00 3.45 1,380.00 3.50 1,400.00 4.75 1,900.00 3.80 1,520.00 23 Protective Coat (Special) S.Y. 520 1.05 546.00 1.00 520.00 1.50 780.00 2.20 1,144.00 1.25 650.00 24 Temporary Access (Private Entrance) EACH 22 150.00 3,300.00 70.00 1,540.00 15.00 330.00 315.00 6,930.00 280.00 6,160.00 25 Manholes to be Adjusted EACH 11 225.00 2,475.00 220.00 2,420.00 350.00 3,850.00 421.00 4,631.00 220.00 2,420.00 26 Combination Concrete Curb 8 Gutter, Removal and Replacement, Type M -6.12 FOOT 150 25.00 3,750.00 18.00 2,700.00 18.00 2,700.00 27.50 4,125.00 14.50 2,175.00 27 Inlets to be Adjusted EACH 3 300.00 900.00 220.00 660.00 300.00 900.00 421.00 1,263.00 205.00 615.00 28 Removing Catch Basins EACH 6 200.00 1,200.00 270.00 1,620.00 120.00 720.00 224.00 1,344.00 255.00 1,530.00 29 Manholes to be Reconstructed EACH 1 400.00 400.00 1,550.00 1,550.00 1,000.00 1,000.00 730.00 730.00 1,510.00 1,510.00 30 Storm Sewer Removal FOOT 120 10.00 1,200.00 11.00 1,320.00 11.00 1,320.00 38.00 4,560.00 11.00 1,320.00 31 Grating for Concrete Flared End Section, 15' EACH 1 800.00 800.00 310.00 310.00 486.00 486.00 382.00 382.00 305.00 305.00 32 Storm Sewers, Class II, Type 1, RCCP (0-Ring), 12' FOOT 261 25.00 6,525.00 37.00 9,657.00 37.00 9,657.00 37.00 9,657.00 35.00 9,135.00 33 Storm Sewers, Type 1, PVC (C -900), 12' FOOT 10 30.00 300.00 43.00 430.00 45.00 450.00 117.00 1,170.00 43.00 430.00 34 Storm Sewers, Type 1, PVC (C -900), 8" FOOT 226 25.00 5,650.00 31.00 7,006.00 39.00 8,814.00 44.00 9,944.00 31.00 7,006.00 35 Storm Sewers, Type 1, PVC (Schedule 40), 4" FOOT 33 15.00 495.00 27.00 891.00 27.00 891.00 50.00 1,650.00 27.00 891.00 36 Wye, PVC, 8' x 4" EACH 3 100.00 300.00 205.00 615.00 378.00 1,134.00 506.00 1,518.00 205.00 615.00 Sub-Totals: 279,429.50 238,113.55 229,330.00 253,604.69 288,989.70 OWNER: PROJECT DESCRIPTION: • TABULATION OF BIDS Village of Lemont Country Lane /Country Court Paving & Water Main Improvements and Kromray Road Resurfacing .An .. Page 2 Of 2 PROJECT NO : 02021 _' __• ____ ` Engineers Estimate K -Five Construction Corp. 13769 Main Street Lemont, IL 60439 Brothers Asphalt Paving 1340 Horseshoe Court Addison, IL 60101 Johnson Blacktop, Inc. 825 Hicks Drive Elburn, IL 60119 James D. Fiala Paving Company, Inc. 500 E. Frontage Rd North Bolingbrook, IL 60440 5% Bid Bond 5% Bid Bond 5% Bid Bond 5% Bid Bond Item No Unit Unit Unit Unit Unit Description Unit Quantity Price Amount Price Amount Price Amount Price Amount Price Amount 37 38 Manholes, Type A, 4' Dia., Type 1 Frame, Closed Lid Inlets, Type A, Type 1 Frame, Closed Lid EACH 2 1,625.00 3,250.00 1,950.00 3,900.00 1,350.00 2,700.00 1,831.00 3,662.00 1,910.00 3,820.00 39 Catch Basins, Type C, with Neenah R EACH 2 800.00 1,600.00 610.00 1,220.00 918.00 1,836.00 1,037.00 2,074.00 605.00 1,210.00 -3281A Frame and Grate EACH 1 940.00 940.00 1,700.00 1,700.00 1,134.00 1,134.00 1,165.00 1,165.00 1,605.00 1,605.00 40 Trench Backfill, Compacted C.Y. 150 26.00 3,900.00 28.00 4,200.00 28.00 4,200.00 26.62 3,993.00 27.00 4,050.00 41 42 Mailboxes to be Removed and Reset Brick Mailbox Relocation EACH 19 100.00 1,900.00 105.00 1,995.00 50.00 950.00 100.00 1,900.00 155.00 2,945.00 43 Water Main in Trench, Ductile Iron, 10" EACH 1 500.00 850.00 850.00 1,000.00 1,000.00 800.00 800.00 800.00 800.00 44 Water Main in Encasing Pipe, Ductile Iron, 10" FOOT 944 37.50 35,400.00 45.00 42,480.00 48.00 45,312.00 43.01 40,601.44 45.00 42,480.00 45 Polyethylene Encasement, 10" FOOT 136 37.50 5,100.00 60.00 8,160.00 60.00 8,160.00 41.60 5,657.60 56.00 7,616.00 FOOT 1080 1.50 1,620.00 2.10 2,268.00 1.50 1,620.00 0.40 432.00 2.00 2,160.00 46 47 Connection to Existing Water Main, 10" Connection to Existing Water Main, 8" EACH 1 500.00 500.00 1,600.00 1,600.00 2,270.00 2,270.00 1,083.00 1,083.00 1,510.00 1,510.00 48 Steel Encasing Pipe in Trench, EACH 1 500.00 500.00 1,500.00 1,500.00 2,200.00 2,200.00 1,190.00 1.190.00 1,410.00 1,410.00 49 16' x 3/8" Pipe Fittings Joints), FOOT 136 80.00 10,880.00 46.00 6,256.00 48.50 6,596.00 77.00 10,472.00 45.00 6,120.00 50 (Mechanical Ductile Iron Pressure Connections, LBS. 2600 3.20 8,320.00 3.25 8,450.00 4.00 10,400.00 3.50 9,100.00 3.00 7,800.00 16" x 10" EACH 1 2,200.00 2,200.00 5,000.00 5,000.00 5,300.00 5,300.00 7,460.00 7,460.00 5,225.00 5,225.00 51 52 Gate Valves, 10' Valve Box, Cast EACH 3 1,160.00 3,480.00 1,050.00 3,150.00 1,300.00 3,900.00 1,467.00 4,401.00 1,010.00 3,030.00 53 Iron, 6" Valve Vaults, Type EACH 3 150.00 450.00 160.00 480.00 162.00 486.00 91.00 273.00 155.00 465.00 54 A, 6' Dia. Fire EACH 1 1,800.00 1,800.00 3,100.00 3,100.00 3,240.00 3,240.00 2,884.00 2,884.00 3,550.00 3,550.00 55 Hydrants Water EACH 4 2,250.00 9,000.00 2,600.00 10,400.00 2,590.00 10,360.00 2,606.00 10.424.00 2,550.00 10,200.00 Service Connection, Near Side, 1 -1/2" EACH 8 735.00 5,880.00 1,300.00 10,400.00 1,100.00 8,800.00 945.00 7,560.00 1,360.00 10,880.00 56 57 Water Service Connection, Far Side, 1 -1/2" EACH 14 1,365.00 19.110.00 1,700.00 23,800.00 1,800.00 25,200.00 2,525.00 35,350.00 1,760.00 24,640.00 Selected Granular Backfill, Compacted C.Y. 280 26.00 7,280.00 28.00 7,840.00 30.00 8,400.00 26.73 7,484.40 27.00 7,560.00 58 Encasing Pipe in Trench, PVC (Schedule 40), 4" FOOT 60 10.00 600.00 28.00 1.680.00 65.00 3,900.00 45.76 2,745.60 27.00 1,620.00 59 Shotcrete Curb and Gutter Repairs FOOT 250 20.00 5,000.00 25.00 6,250.00 13.00 3,250.00 22.00 5,500.00 24.50 6,125.00 60 Brick Driveway Removal, Salvage, and Replacement S.Y. 40 40.00 1,600.00 11.00 440.00 15.00 600.00 99.00 3,960.00 21.00 840.00 61 Tree Root Pruning FOOT 30 4.00 120.00 11.00 330.00 10.00 300.00 275.00 8,250.00 9.50 285.00 62 Topsoil Furnish and Place, 4" S.Y. 3700 1.50 5.550.00 1.75 6,475.00 2.80 10,360.00 1.65 6,105.00 1.65 6,105.00 63 Sodding S.Y. 3700 3.00 11,100.00 3.00 11,100.00 3.00 11,100.00 2.75 10.175.00 3.00 11,100.00 64 Inlet and Pipe Protection EACH 6 200.00 1,200.00 65.00 390.00 70.00 420.00 63.00 378.00 61.00 366.00 65 Supplemental Watering UNIT 150 10.00 1,500.00 0.01 1.50 10.00 1,500.00 2.00 300.00 1.00 150.00 66 Thermoplastic Pavement Marking - Line 24" FOOT 15 10.00 150.00 52.00 780.00 71.00 1,065.00 68.10 1.021.50 17.50 262.50 67 Thermoplastic Pavement Marking - Line 6" FOOT 60 4.00 240.00 11.00 660.00 18.00 1,080.00 17.02 1,021.50 17.50 1,050.00 68 Traffic Control and Protection L.S. 1 5,000.00 5,000.00 2,000.00 2,000.00 5,000.00 6,000.00 8,000.00 8,000.00 19,000.00 19,000.00 69 Construction Layout L.S. 1 15,000.00 15,000.00 6,500.00 6,500.00 5,000.00 5,000.00 5,000.00 5,000.00 9,000.00 9,000.00 70 Insurance Provisions - OCP -O (Special) L.S. 1 3,000.00 3,000.00 1,500.00 1,500.00 1,100.00 1.100.00 8,000.00 8,000.00 2,150.00 2,150.00 T o t a I s: 452,599.50 424,969.05 429,069,00 472,027.73 496,119.20 Bid Error Corrections: 67 Thermoplastic Pavement Marking - Line 6" 1,021.20 TOTAL 472,027.43 Corrected Totals - - - 424,969.05 429,069.00 472,027.43 496,119.20 Over / Under - - • - - 27,630.45 - 23,530.50 19,427.93 43,519.70 Percent - • - - -6.10% -5.20% 4.29% 9.62% 630 887 0132 MAY.28'2003 09:34 630 887 0132 FRANK NO CTNY A550C:ATE5 #6252 P.001 Frank Novotny &Associates, Inc. 825 Midway Drive ❑ Willowbrook, Illinois ❑ 60527 0 630/887 -8640 ❑ Fax: 630/887 -0132 FACSIMILE TRANSMISSION COVER SHEET To: Steve May, P.E. Village of Lemont Fax: 257 -1598 Phone: From: James L. Cainkar, P.E. Date: May 27, 2003 Re: Country Lane /Country Cm rt/Kromray Road cc: Project File #02021 Pages: 5 (Including Cover Sheet) 0 Urgent ❑ For Review & Comment 0 As Requested Please Reply 0 For Your Information Dear Steve: Per the low bidder's proposal, in the amount of $424,969.05, please see the attached revised estimates: 1) Kromray Road Resurfacing $ 71,039.20 2) Country Lane /Country Court Water Main 136,564.00 3) Country Lane /Country Court Paving 217,365.85 Total $424,969.05 Should you have any questions concerning this matter, please do not hesitate to contact me. Thanks, Jim /deb'