Loading...
R-53-03 Authorizing Approval Of An engineering Agreement With Strand Associates, Inc. For Design And Construction Services For Well #6RESOLUTION 11\, 3 -03 RESOLUTION AUTHORIZING APPROVAL OF AN ENGINEERING AGREEMENT WITH STRAND ASSOCIATES, INC. FOR DESIGN AND CONSTRUCTION SERVICES FOR WELL #6 WHEREAS, the Village of Lemont requires engineering services related to design and construction services for a new well and softening plant to meet future needs of the community; and WHEREAS, the Village seeks to utilize the firm of Strand Associates, Inc. to design and prepare specifications for Well #6; and WHEREAS, the Village and Strand Associates, Inc. have negotiated an agreement to identify the terms and conditions of the services to be provided. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Engineering Fee Proposal attached hereto as Exhibit A is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DU PAGE, ILLINOIS, on this 28th day of July , 2003. AYES NAYS PASSED ABSENT Debby Blatzer V Peter Coules V Brian Reaves Steven Rosendahl ✓ Ronald Stapleton Jeanette Virgilio ✓ Attest: JO F. P AZZA, Village 4'I2Ut/k lUi)/14614( SMOLLEN, Village Clerk Sa STRAND ASSOCIATES, INC.. E N G I N E E R S 910 West Wingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Strand Associates, Inc. Madison, WI Joliet, IL Louisville, KY Subsidiary Offices PEH Lexington, KY Louisville, KY Division Offices SIECO Columbus, IN Lancaster, OH TAI Mobile, AL www.strand.com July 3, 2003 Mr. Dan Fielding, Director of Public Works Village of Lemont 418 Main Street Lemont, IL 60439 Re: Engineering Fee Proposal for Well No. 6 Facilities with Softening Plant Dear Mr. Fielding: At your request, we have prepared an engineering fee proposal for the design of a new deep well facility for the Village of Lemont. The facility will be housed in a masonry building and will include a new 1,650- foot -deep well, well pumping equipment, and ion exchange treatment to reduce anticipated elevated radium levels. This proposal also includes construction- related services for the deep well only. Engineering Services Design services envisioned for the Well No. 6 will include preliminary planning, topographic surveys, final design, plan and specification preparation, and IEPA submittals. Specific components are noted below: 1. A new deep well, which will be drilled to a depth of approximately 1,650 feet and cased to a depth of 1,050 feet to case off the upper St. Peter sandstone. 2. Pumping facilities, which will be housed in a masonry building designed to reflect the architectural appearance of nearby condominiums. Facilities will include a submersible well pump, chemical room, electrical gear, and controls tied into the existing SCADA system. 3. An ion exchange plant consisting of an automatic zeolite softener, sized to treat 75 percent of total well flow. Construction services for the deep well will include bidding assistance (including duplication), shop drawing review, general observation, contract administration, and part-time, on -site construction observation. Engineering Fees The proposed engineering services shall be provided on an hourly fee basis for the time actually spent on the project (plus expenses) per our standard billing procedure. Sa STRAND ASSOCIATES, INC.. E N G I N E E R S Mr. Dan Fielding, Director of Public Works Village of Lemont Page 2 July 3, 2003 Proposed engineering fees do not include legal surveys, IEPA loan applications, soil borings, design of a major ground -level reservoir, construction services for the well house and treatment facility, or any specialized investigations including archeological, hazardous waste, or flood evaluations. The total estimated engineering fee for the Well No. 6 facility design with well borehole construction services is $129,500, with the following anticipated breakdown. Item Description Amount Design (through bidding) Deep Well $ 15,000 Well Facility 63,000 Treatment 41,500 Subtotal $119,500 Construction Services Deep Well 10,000 Engineering Budget $129,500 If this proposal is acceptable to the Village, please let us know and we will begin work on the project immediately. If you have any questions or would like additional information, please call. Sincerely, STRAND ASSOCIATES, INC. Gerald D. Groth, P.E. ACCEPTED: Attest: GDG:mro \G: \SDATA \ @Sai \401 -- 450 \424 \010 \Wrd \Well 8 proposal.doc Village of Faith Mayor John F. Piazza Village Clerk Charlene M. Smollen Trustees Debby Blatzer Peter Coules Brian Reaves Steven Rosendahl Ronald Stapleton Jeanette Virgilio Administrator Gary C. Holmes Village of Lemont August 6, 2003 Gerald D. Groth, P.E. Strand Associates, Inc. 910 West Wingra Drive Madison, WI 53715 418 Main Street • Lemont, Illinois 60439 Administration RE: Engineering Fee Proposal for Well No. 6 Facilities with Softening Plant phone (630) 257 -1590 fax (630) 243 -0958 Building Department phone (630) 257 -1580 fax (630) 257 -1598 Community Development phone (630) 257 -1595 fax (630)257 -1598 Dear Gerry: Enclosed is a copy of Resolution R -53 -03 approving the attached Engineering Fee Proposal from Strand Associates for design and construction services related to Well #6, approved by the Village Board on July 28, 2003. Economic Development If any additional information is needed at this time, don't hesitate to call me at 630 - phone (630) 257 -6440 257 -2532. fax (630) 243 -0958 Engineering Department Sincerely, phone (630) 243 -2705 fax (630) 257 -1598 %� Finance Department F' -i phone (630) 257 -1550 fax (630) 257 -1598 Dan Fielding Director of Public Works Police Department 416 Main Street phone (630) 257 -2229 fax (630) 257 -5087 Public Works 14574 127th Street phone (630) 257 -2532 fax (630) 257 -3068 www.lemont.il.us