Loading...
R-14-02 02/25/02RESOLUTION (R • 0-- RESOLUTION AUTHORIZING CONTRACT CHANGE ORDER FOR CONSTRUCTION SERVICES RENDERED IN CONJUNCTION WITH THE 2000 ROAD RESURFACING PROGRAM, PHASE II WHEREAS, the Village of Lemont has previously awarded a construction contract to K -Five Construction Corporation for the 2000 Road Resurfacing Program, Phase II; and WHEREAS, the Village of Lemont has determined that certain changes to the contract totaling $53,064.15 are necessary to satisfactorily complete the construction project; and WHEREAS, the contract changes are a result of final quantities as measured in place and changes that were not originally contemplated at the time the contract was awarded. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Contract Change Order with K -Five Construction Corporation in the amount of $53,064.15 is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 25th day of February , 2002. AYES John Benik Debby Blatzer Peter Cowles Connie Markiewicz Steven Rosendahl Jeanette Virgilio NAYS PASSED ABSENT V v 1_1 & /612114-°'` CHARLENE SMOLLEN, Village Clerk Approved by me this 25th day of February , 2002. Attest: HARLENE SMOLLEN, Village Clerk PIAZZA, Village Presi ate, Approved as to form: JOHN ANTONOPOULOS, Village Attorney Date: February 15, 2002 County Request for Approval of Change in Plans Page 1 of 5 COOK, DUPAGE & WILL Contractor: K -Five Construction Corp. Road District or Municipality VILLAGE OF LEMONT 13769 Main Street Lemont, IL 60439 Section Project Description: Year 2000 Road Program & Water Main Request No. 2 & FINAL Replacement I recommend that an addition be made to the above contract. Between Station N/A and Station N/A a net length of N/A (Do not fill in unless a change in length is involved.) The estimated quantities are shown below and the Contract agrees to furnish the materials and do the work at the Contract unit prices. Shown station location for major items. Item No Description Awarded Deductions Unit Quantity Amount Over Under Quantity Unit Price Additions PAVING & STORM SEWER ITEMS: 84 88 8 80888 IN,, 8 * 88 888 888 88 08880 88.888 8488888.8 NN N o7 O O— o LO a 4 V V go N^ 7 ,4 N N g N 7 g N M g M (i s 0 f7 N 1 Bituminous Surface Removal, 1 -1/4" Avg. S.Y. 3400 6,800.00 192 3208 384.00 2 Bituminous Surface Removal (Over Concrete S.Y. 16464 37,044.00 1755 18219 3,948.75 Pavement), Variable Depth 3 Bituminous Surface Removal, 4" Avg. S.Y. 1606 4,015.00 954 652 2,385.00 4 Bituminous Surface Removal- Variable Depth S.Y. 541 4,328.00 541 4,328.00 (for Driveways) 5 Concrete Alley Pavement Removal S.Y. 315 3,150.00 150 165 1,500.00 6 Driveway Pavement Removal S.Y. 348 3,480.00 4 352 40.00 7 Sidewalk Removal S.F. 3765 3,765.00 1827 5592 1,827.00 8 Combination Curb and Gutter Removal FOOT 4002 20,010.00 5685 9687 28,425.00 9 Class D Patches, Type II, 12' S.Y. 50 3,250.00 50 3,250.00 10 Class D Patches, Type II, 6" S.Y. 1014 34,476.00 498 516 16,932.00 11 Fiberglass Fabric Repair System S.Y. 600 10,650.00 600 10,650.00 12 Area Reflective Crack Control Treatment, System A S.Y. 27100 27,100.00 984 26116 984.00 13 Aggregate Shoulders, Type B TON 40 1,117.60 25 15 698.50 14 Subbase Granular Material, Type B, 4" S.Y. 294 3,234.00 294 32334.00 15 Bituminous Materials (Prime Coat) TON 42.2 42.20 27.2 15 27.20 16 Leveling Binder (Machine Method), Mixture C, Type 2 TON 1494 64,242.00 97 1397 4,171.00 17 Bituminous Concrete Binder Course, Mixture C, Type 2 TON 192 8,256.00 192 8,256.00 18 Bituminous Concrete Surface Course, Mixture C, Class I, Type 3 TON 2725 119,900.00 343 2382 15,092.00 19 Mixture For Joints, Cracks & Flangeways TON 14 3,500.00 14 3,500.00 20 Temporary Ramp S.Y. 550 3,300.00 550 3,300.00 21 Incidental Bituminous Surfacing, Modified Mix TON 150 18,750.00 75 225 9,375.00 22 Aggregate (Prime Coat) TON 44 44.00 40 4 40.00 23 Combination Concrete Curb and Gutter, Type B-6.12 FOOT 588 8,232.00 216 804 3,024.00 24 Combination Concrete Curb and Gutter, Type M -3.18 FOOT 120 1,800.00 742 862 11,130.00 25 Combination Concrete Curb and Gutter, Type B -6.18 FOOT 1922 30,752.00 5781 7703 92,496.00 26 Shotcrete Curb & Gutter Repairs FOOT 120 2,520.00 120 2,520.00 27 Shotcrete Curb Repairs FOOT 1000 21,000.00 1000 21.000.00 28 Porous Granular Embankment, Subgrade C.Y. 60 3,900.00 60 3,900.00 29 Trench Backfill, Compacted C.Y. 277 5,540.00 277 5,540.00 30 P.C. Concrete Pavement, 8' S.Y. 186 7,440.00 22 164 880.00 31 P.C. Concrete Driveway Pavement, 7' S.Y. 254 8,890.00 86 340 3,010.00 32 P.C. Concrete Sidewalk, 5' S.F. 3775 10,381.25 1672 5447 4,598.00 33 Storm Sewer, Type 2, PVC (C -900), 8' FOOT 60 1,920.00 193 253 6,176.00 34 Storm Sewer, Type 2, PVC (C -900), 10" FOOT 280 9,520.00 29 309 986.00 35 Storm Sewer, Type 2, PVC (C -900), 12' FOOT 100 3,700.00 100 3,700.00 36 Stomr Sewer, Type 2, RCCP, 15' (0-Ring) FOOT 100 3,800.00 8 108 304.00 37 Storm Sewer, Type 2, RCCP, 12" (0-Ring) FOOT 113 $ 4,068.00 47 160 1,692.00 SUB - TOTALS (PAGE 1) $ 503,917.05 $ 167,031.75 $ 116,271.70 Request for Approval of Change in Plans Page 2 of 5 Date: February 15, 2002 County COOK, DUPAGE & WILL Contractor: K -Five Construction Corp. Road District or Municipality VILLAGE OF LEMONT 13769 Main Street Lemont, IL 60439 Section Project Description: Year 2000 Road Program & Water Main Request No. 2 & FINAL Replacement recommend that an addition be made to the above contract. Between Station N/A and Station N/A a net length of N/A (Do not fill in unless a change in length is involved.) The estimated quantities are shown below and the Contract agrees to furnish the materials and do the work at the Contract unit prices. Shown station location for major items. Item No Awarded Deductions Description Unit Quantity Amount Over Under Quantity Unit Price Additions BALANCE BROUGHT FORWARD FROM PAGE 1 167,031.75 116,271.70 38 Pipe Underdrains, Type 1, Perforated PVC, 4' Dia. FOOT 120 1,800.00 120 15.00 1,800.00 39 Catch Basins, Type A, 4' Dia., with Half Trap EACH 3 4,950.00 2 1 1,650.00 3,300.00 40 Catch Basins, Type C, with Half Trap EACH 39 39,000.00 4 43 1,000.00 4,000.00 41 Manholes, Type A, 4' Dia., with Type 1 Frame EACH 2 3,500.00 2 1,750.00 3,500.00 & Closed LId 42 Cleaning Existing Catch Basins and Manholes EACH 60 9,000.00 56 4 150.00 8,400.00 43 Catch Basins To Be Reconstructed EACH 12 9,600.00 5 17 800.00 4,000.00 44 Manholes To Be Reconstructed EACH 3 2,400.00 3 800.00 45 Valve Box To Be Adjusted EACH 10 2,000.00 7 3 200.00 1,400.00 46 Valve Box To Be Removed EACH 8 600.00 4 4 75.00 300.00 47 Grates (Special) EACH 3 645.00 3 215.00 645.00 48 Frames and Grates (Special) EACH 3 1,275.00 2 1 425.00 850.00 49 Remove Existing Catch Basin EACH 18 5,760.00 18 320.00 50 Remove Existing Valve Vault EACH 1 320.00 1 2 320.00 320.00 51 Frames and Lids To Be Adjusted (Special) EACH 51 17,850.00 8 59 350.00 2,800.00 52 Catch Basins To Be Adjusted EACH 22 4,730.00 14 8 215.00 3,010.00 53 Thermoplastic Pavement Marking - Letters & Symbols S.F. 303 757.50 149 154 2.50 - 372.50 54 Thermoplastic Pavement Marking - Line 4' FOOT 288 144.00 14375 14663 0.50 7,187.50 55 Thermoplastic Pavement Marking - Line 6' FOOT 2000 1,400.00 478 1522 0.70 334.60 56 Thermoplastic Pavement Marking - Line 12' FOOT 450 540.00 353 803 1.20 423.60 57 Thermoplastic Pavement Marking - Line 24' FOOT 630 1,575.00 11 619 2.50 27.50 160.00 58 Sign Panel, Type A S.F. 24 384.00 10 14 16.00 450.00 59 Sign Post, Type B FOOT 117 1,170.00 45 72 10.00 SUB -TOTAL For Paving & Storm Sewer Items 613,317.55 WATER MAIN ITEMS: 60 DELETED 61 Water Main In Trench, Ductile Iron, 6' FOOT 67 3,752.00 97 164 56.00 5,432.00 62 Water Main In Trench, Ductile Iron, 8' FOOT 3829 160,818.00 430 4259 42.00 18,060.00 4,515.00 63 Water Main In Encasing Pipe, Ductile Iron, 8' FOOT 654 22,890.00 129 525 35.00 64 DELETED 65 Polyethylene Encasement FOOT 4505 4,955.50 132 4637 1.10 145.20 66 Encasing Pipe In Trench, PVC (C-900), 12' FOOT 714 22,848.00 92 622 32.00 2,944.00 9,580.00 67 Encasing Pipe In Trench, PVC (Schedule 40), 2' FOOT 923 18,460.00 479 444 20.00 6,137.60 68 Pipe Fittings (Mechanical Joints), Ductile Iron LBS. 8511 27,235.20 1918 6593 3.20 45,085.00 69 Concrete Pavement Removal and S.Y. 3443 122,226.50 1270 2173 35.50 Bituminous Replacement 6" 70 Connection to Existing Water Main, 4" EACH 2 3,120.00 3 5 1,560.00 4,680.00 1,750.00 71 Connection to Existing Water Main, 6' EACH 3 5,250.00 1 2 1,750.00 SUB - TOTALS (PAGE 1 -2) $ 1,004,872.75 Totals: $214,080.05 $210,832.90 Net Change: $ 3,247.15 $ - Request for Approval of Change in Plans Page 4 of 5 Date: February 15, 2002 County COOK, DUPAGE & WILL Contractor: K -Five Construction Corp. Road District or Municipality VILLAGE OF LEMONT 13769 Main Street Lemont, IL 60439 Section Project Description: Year 2000 Road Program & Water Main Request No. 2 & FINAL Replacement recommend that an addition be made to the above contract. Between Station N/A and Station N/A a net length of N/A (Do not fill in unless a change in length is involved.) The estimated quantities are shown below and the Contract agrees to furnish the materials and do the work at the Contract unit prices. Shown station location for major items. Item No Description Awarded Deductions Unit Quantity Amount Over Under Quantity Unit Price Additions BALANCE BROUGHT FORWARD FROM PAGE 3 287,555.05 257,555.90 105 Construction Layout LS. 0.6 27,600.00 0.6 46000.00 106 Record Drawings LS. 0.6 2,505.00 0.6 4175.00 2505.00 107 Exploratory Excavation C.Y. 210 6,300.00 75 285 30.00 2250.00 108 Engineer's Feld Office, Type A CALMO 9 18,000.00 7 2 2000.00 14000.00 109 Fumishing and Placing Topsoil, 4' S.Y. 2967 5,934.00 4236 7203 2.00 8472.00 110 Sodding S.Y. 2967 8,901.00 4236 7203 3.00 12708.00 111 Supplemental Watering UNIT 60 600.00 60 10.00 600.00 "'APPROVED ADDITIONAL ITEMS"' Water Main In Trench, Ductile Iron, 4° FOOT 110 110 55.00 6050.00 Gate Valves, 4" EACH 4 4 745.00 2980.00 Shewer Tap, 8" x 6" 3 3 770.00 2310.00 Sanitary Sewer In Trench, PVC (SDR 26), 6' FOOT 150 150 36.00 5400.00 1,554,183.75 Totals: $327,725.05 5274,660.90 Total net addition to date 53,064.15 which is 3.41% of Contract price. Net Change: $ 53,064.15 5 - Page 5 of 5 State fully the nature and reason for the change: Adjustment for as- constructed quantities in comparison to Plan quantities. When the net increase or decrease in the cost of the contract is $10,000 or more or the time of completion is increased or decreased by 30 days or more, one of the following statements shall be checked. XX The undersigned determine that the circumstances which necessitate this change were not reasonably foreseeable at the time the contract was signed. The undersigned determine that the circumstances which necessitate this change were not within the contemplation of the contract as signed. The undersigned determine that this change is in the best interest of the local agency and is authorized by law. Dated: Title of Municipal Officer a.