Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R-37-02 05/13/02
RESOLUTION RESOLUTION AUTHORIZING AWARD OF CONTRACT TO JOHNSON BLACKTOP, INC. IN CONJUNCTION WITH THE STEPHEN STREET PARKING LOT IMPROVEMENTS AT SAFETY VILLAGE WHEREAS, the Village of Lemont requires construction services for a public parking lot at 55 Stephen Street adjacent to Safety Village; and WHEREAS, the Village of Lemont seeks to utilize the construction firm of Johnson Blacktop, Inc.; and WHEREAS, Johnson Blacktop, Inc. has submitted a low bid for such work in the amount of $93,077.70. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Contract with of Johnson Blacktop, Inc., is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS, on this 13th day of May , 2002. John Benik Debby Blatzer Peter Coules Connie Markiewicz Steven Rosendahl Jeanette Virgilio AYES NAYS PASSED A BSENT 4/ ✓ HARLENE SMOLLEN, Village Clerk Approved by me this 13th day of Mav , 2002. Attest: JO ► ' I • ZZA, Villag = ' reside/ CHARLENE SMOLLEN, Village Approved as to forni: JOHN ANTONOPOULOS, V llage Attorney Iinois ❑ 60527 ❑ 630 - 887 -8640 ❑ fax: 630 - 887 -0132 FRANK NOVOTNY & ASSOCIATES, INC. /AV/coNsn/N6 C /V /L ENGINEERS April 18, 2002 Mr. Gary Holmes Administrator Village of Lemont 418 Main Street Lemont, Illinois 60439 Re: Safety Village Parking Lot @ 55 Stephen Street Dear Gary: Listed below and on the attached "Bid Tabulation ", please find the results of the bid opening for the above- captioned project, as bid on April 17, 2002 at 10:00 AM. Twelve (12) bids were received and tabulated. Three (3) of the bids had calculation errors, however, these errors did not affect the bidding order. Johnson Blacktop, Inc $ 93,077.70 Hardin Paving Company 99,046.20 R.A. Ubert Construction 100,024.50 Northland Blacktop Paving 101,972.00 F &G Construction Company 104,062.00 McGill Construction Company 106,144.75 Abbey Paving Co., Inc. 106,572.72 MYS, Inc. 107,899.00 D Construction, Inc. 111,231.25 Century Contractors, Inc. 112,673.00 James D. Fiala Paving Company 115,831.00 Brothers Asphalt, Inc 118,432.00 Engineer's Estimate $ 104,899.00 The above work consists of the paving and curbing of the parking lot, as well as some storm sewer and landscape work. O O The low bid submitted by Johnson Blacktop, Inc., in the amount of $93,077.70, is $11,821.30 (11.27 %) under the Engineer's Estimate of $104,899.00. Since Johnson Blacktop, Inc. O is pre - qualified by IDOT to perform this type of work; we recommend that the Contract be awarded •3 to the Johnson Blacktop, Inc., 825 Hicks Drive, Elburn, IL 60119, in the amount of $93,077.70. Very truly D FRA ' • • P" Y AND ASSOCIATES, INC. co u� Ja e L. Cainkar, P.E., P. .S. CO JLC /debi Enclosure cc: Mr. Stephen May, P.E., w /Enc. Project File No. 01143 Please call if you have any questions regarding this matter. Date: 4/18/02 OWNER: PROJECT DESCRIPTION: TABULATION OF BIDS Village of Lemont Safety Village Parking Lot @ 55 Stephen Street Page 1 Of 2 PROJECT NO : 01143 Engineers Estimate Johnson Blacktop, Inc. 825 Hicks Drive Elbum, IL 60119 5% Bid Bond Hardin Paving Company 460 West Hintz Road Wheeling, IL 60090 5% Bid Bond R.A. Liked Construction P.O. Box 160 Yorkville, IL 60560 5% Bid Bond Northland Blacktop Paving P.O. Box 565 St. Charles, IL 60174 5% Bid Bond P&G Construction Co. 900 Ogden Avenue 6203 Downers Grove, IL 60515 5•/. Bid Bond McGill Construction Co. 13830 5. Harrison Avenue Blue Island, IL 60406 5% Bid Bond Item Unit Unit Unit Unit Unit Unit Unit No Description Unk Quantity Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount 1 Earth Excavation 850 25.00 18,275.00 17.90 15,215.00 20.00 17,000.00 16.00 13600.00 25.00 O O V O N o O N p, O :916;$88 g?;-0;6' N V A> A N N Oo 00500 8gggg g88gg 88FSO8 o gogg 8 28k-A ) 17,850.00 2 Perimeter Erosion Berner 270 3.50 1,080.00 2.50 675.00 3.00 810.00 2.50 675.00 2.50 ) 675.00 3 Aggregate Surface Course, Type A 50 30.00 1,050.00 28.75 1,437.50 25.50 1,275.00 30.00 1,500.00 22.00 ) 1,150.[ 4 Combination Concrete Curb & Gutter, Type 8-6.12 805 15.00 8.935.50 13.40 10,787.00 13.75 11,068.75 14.50 11,672.50 12.00 , 11,9542 5 Combination Curb& Gutter Removal 10 4.00 50.00 16.85 168.50 5.00 50.00 15.00 150.00 4.00 150.• 6 m Bituminous Surface Removal, 3' 435 6.00 2,740.50 1.85 804.75 2.50 1,087.50 5.50 2,392.50 10.00 10.657. 7 Portland Cement Concrete Sidewalk, 5 Inch 2015 3.50 6,548.75 3.60 7,254.00 3.85 7,757.75 3.50 7,052.50 3.50 8.060.. 8 Aggregate Base Course, Type B, 10' 1500 10.00 8,625.00 7.20 10,800.00 8.75 13,125.00 7.20 10.800.00 7.50 11.550.. 9 Bituminous Concrete Binder Course, Mixture B. 138 42.00 6,831.00 61.45 8,480.10 78.00 10,764.00 48.00 6,624.00 55.00 7,176.• Class I, Type 2,1.1/2' 10 Bituminous Concrete Surface Course, Mixture C, Class I. Type 3, 1 -112' 138 45.00 6,451.50 64.50 8,901.00 78.00 10,764.00 50.00 6,900.00 55.00 7,176„ 11 Incidental Bituminous Surfacing, 2' 7 100.00 525.00 64.50 451.50 105.00 735.00 60.00 420.00 100.00 553.. 12 Paint Pavement Marking - Line 4' 285 0.50 213.75 0.75 213.75 2.50 712.50 1.00 285.00 4.50 114... 13 Paint Pavement Marking - Letters 8 Symbols 6 8.00 90.00 10.00 60.00 15.00 90.00 10.00 60.00 35.00 9,.. 14 Metal Post- Type B 12 10.00 120.00 10.00 120.00 10.00 120.00 10.00 120.00 50.00 120... 15 Sign Panel - Type 1 2 90.00 50.00 15.00 30.00 180.00 360.00 50.00 100.00 200.00 60... 16 Catch Basins, Type A, Neenah R- 3281 -A Frame, Open Ud 2 900.00 3,720.00 1,070.00 2,140.00 800.00 1,600.00 2,500.00 5,000.00 1,700.00 3,100,.. 17 Storm Sewers, Ductile Iron, B' 97 35.00 3,986.70 55.60 5,39320 25.00 2,425.00 45.00 4,365.00 50.00 2,910,. 18 Storm Sewers, Type 2, RCCP, 12' (0 -Ring) 84 30.00 3,360.00 56.85 4,775.40 25.00 2,100.00 32.00 2,688.00 38.00 2.520.. 19 Trench Backfill V 120 30.00 8 2,160.00 48.30 5,796.00 16.00 1,920.00 35.00 4,200.00 25.00 8 8 ri 1,980,.. 20 Rock Excavation 25 200.00 5,000.00 75.00 1,875.00 125.00 3.125.00 150.00 3,750.00 25.00 4.125... 21 Inlets, Type A, Neenah R- 3281 -A Frame, Open Lid 2 700.00 2,020.00 555.00 1,110.00 800.00 1,600.00 1,500.00 3,000.00 750.00 1,500... 22 Furnishing & Placing Topsoil. 4' 600 2.00 1,830.00 3.05 1,830.00 5.00 3,000.00 3.50 2,100.00 3.00 2.310... 23 Sodding 600 3.50 3,600.00 3.05 1,830.00 3.00 1,800.00 5.50 3,300.00 2.50 2,400... 24 Porous Granular Embankment, Subgrade (PGES) 100 22.00 2.200.00 36.30 3,630.00 17.00 1,700.00 40.00 4,000.00 20.00 2,100.. 25 Precast Reinforced Concrete Flared End Sections. 12' 1 400.00 300.00 375.00 375.00 750.00 750.00 550.00 550.00 250.00 400,. 26 Stone Riprap, Class Al 0.5 100.00 50.00 200.00 100.00 250.00 250.00 500.00 250.00 700.00 250,.. 27 Geolechnical Fabric For Use With Riprap 5 10.00 15.00 5.00 25.00 10.00 50.00 10.00 50.00 75.00 100. 28 Grating For Concrete Flared End Section 12' 1 400.00 285.00 215.00 215.00 500.00 500.00 300.00 300.00 150.00 400.. 29 Relocate Vehicle Prevention Device (in Pathway) 1 500.00 600.00 500.00 500.00 200.00 200.00 350.00 350.00 500.00 800,. 30 Protective Coat (Special) 410 1.50 615.00 1.35 553.50 1.00 410.00 1.75 717.50 - 2.00 410,. 31 Construction Layout 1 3,000.00 1,000.00 2,500.00 2,500.00 2,000.00 2,000.00 4,500.00 4,500.00 4,000.00 2.500.00 32 Insurance Provisions 1 3,000.00 750.00 1,000.00 1,000.00 1,000.00 1,000.00 500.00 500.00 2,000.00 1,000.00 T o t a l s : 104,899.00 93,077.70 99,04620 100,149.50 101,972.00 104,062.00 106,059.754 Bid Error Corrections: . 1 Earth Excavation 17.935.00 26 Stone Riprap, Class Al 125.00 TOTAL 100,024.50 100.144.75 Corrected Totals - - - 93,077.70 99,04620 100,024.50 101,972.00 104,062.00 106,144.75 Over/ Under •••- - 1162130 - 5852.80 - 4,874.50 - 2.927.00 - 837.00 1,245.75 Percent - - •• - 11.27% -5.58% -4.65% -2.79% -0.80% 1.19% Dale: 4/18/02 OWNER: PROJECT DESCRIPTION: TABULATION OF BIDS Village of Lemont Safety Village Parking Lot @ 55 Stephen Street e...:i •7 onno r.a •n.nn .,.. Page 2 Of 2 PROJECT NO : 01143 Engineers Estimate Abbey Paving Co., Inc. 2319 Diehl Road Aurora, IL 60504 - 5% Bid Bond MYS, Inc. 7801 W. Deerwood Drive Palos Park, IL 60464 5% Bid Bond D Construction, Inc. 1488 S. Broadway Coal City, IL 60416 5% Bid Bond Century Contractors, Inc. 6401 West 75th Street Bedford Park, IL 60638 5% Bid Bond James D. Fiala Paving Company, Inc. 500 E. Frontage Road North Bolingbrook, IL 60440 5% Bid Bond Brothers Asphalt, 1340 Horseshoe Addison, IL Inc. Court 60101 Item No Descri•tion Unit Quanti Unit Price Amount Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price 5% Bid Bond Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32. Earth Excavation Perimeter Erosion Barrier Aggregate Surface Course. Type A Combination Concrete Curb 8 Gutter. Type B -6.12 Combination Curb 8 Gutter Removal Bituminous Surface Removal, 3' Portland Cement Concrete Sidewalk, 5 Inch Aggregate Base Course. Type B, 10' Bituminous Concrete Binder Course, Mixture B, Class I. Type 2, 1.12' Bituminous Concrete Surface Course, Mixture C, Class I, Type 3, 1 -12' Incidental Bituminous Surfacing, 2' Paint Pavement Marking - Line 4• Paint Pavement Marking - Letters 8 Symbols Metal Post - Type B Sign Panel - Type 1 Catch Basins, Type A. Neenah R- 3281 -A Frame, Open Ud Storm Sewers, Ductile Iron, 8' Storm Sewers. Type 2, RCCP. 12- (0 -Ring) Trench Bail Rock Excavation Inlets, Type A, Neenah R- 3257 -A Frame, Open Lid Famishing 8 Placing Topsoil, 4' Sodding Porous Granular Embankment, Subgrade (PGES) Precast Reinforced Concrete Flared End Sections. 12" Stone Riprap, Class Al Geotechnicel Fabric For Use With Riprap Grating For Concrete Flared End Section 12' Relocate Vehide Prevention Device (in Pathway) Protective Coat (Special) Construction Layout Insurance Provisions - C.Y. FOOT C.Y. FOOT FOOT S.Y. S.F. S.Y. TON TON TON FOOT S.F. FOOT S.F. EACH FOOT FOOT C.Y. C.V. EACH S.Y. S.Y. C.Y. EACH C.Y. S.Y. EACH EACH S.Y. L.S. L.S. 850 27C 50 805 10 435 2015 1500 138 138 7 285 6 12 2 2 97 84 120 25 2 600 600 100 1 0.5 5 1 1 410 1 1 88888 8888 8 88888 88888 88888 88888 °8 rv^R."j a 86628 §A888 vi q< °g- �S 21.250.00 945.00 1,500.00 12.07500 40.00 2,610.00 7,052.50 15.000.00 5,796.00 6,210.00 700.00 142.50 48.00 120.00 18000 1,600.00 3,395.00 2,520.00 3,600.00 5,000.00 1.400.00 1,200.00 2.100.00 2.200.00 400.00 50.00 50.00 400.00 500.00 615.00 3,000.00 3,000.00 26.73 1.50 35.00 12.00 5.00 2.53 3.35 5.67 44.91 51.31 51.31 0.22 5.00 6.25 100.00 2.995.00 42.61 39.43 3922 300.00 1.086.50 t.86 2.76 37.48 457.00 285.00 1.20 366.00 460.00 1.50 1,800.00 3,445.00 22.720.50 405.00 1.750.00 9.660.00 50.00 1,100.55 6.75025 8,505.00 6,197.58 7,080.78 359.17 62.70 30.00 75.00 200.00 5,990.00 4,133.17 3,312.12 4,706.40 7,500.00 2.173.00 1,116.00 1,656.00 3,748.00 457.00 142.50 6.00 366.00 460.00 615.00 1,800.00 3,445.00 20.00 2.00 25.00 16.00 10.00 6.00 4.00 9.00 66.00 70.00 110.00 2.00 20.00 10.00 50.00 1,600.00 42.00 38.00 20.00 250.00 900.00 1.50 3.50 20.00 325.00 220.00 5.00 175.00 350.00 1.00 2,200.00 2.000.00 17,000.00 540.00 1,250.00 12,880.00 100.00 1610.00 8.060.00 13,500.00 9,108.00 9,66000 770.00 570.00 120.00 120.00 100.00 3.200.00 4,074.00 3,192.00 2,400.00 6,250.00 1,800.00 900.00 2.100.00 2,000.00 325.00 110.00. 25.00 175.00 350.00 410.00 2,200.00 2,00000 16.00 3.50 36.00 16.00 10.00 6.00 4.00 9.40 60.00 62.00 85.00 0.65 10.00 15.00 50.00 1.500.00 35.00 35.00 38.00 300.00 1,500.00 3.00 4.00 42.00 400.00 400.00 15.00 200.00 1,000.00 1.00 4,000.00 100.00 13,600.00 945.00 1,800.00 11880.00 100.00 2,610.00 1060.00 14,100.00 8,280.00 8,556.00 595.00 185.25 60.00 180.00 100.00 3,000.00 3,395.00 2,940.00 4,560.00 7,500.00 3,000.00 1,800.00 2.400.00 4.200.00 400.00 200.00 75.00 200.00 1,000.00 410.00 4,000.00 100.00 22.00 2.00 40.00 15.00 4.00 2.00 3.50 7.00 90.00 90.00 70.00 0.30 30.00 10.00 60.00 2,000.00 50.00 25.00 20.00 50.00 1,200.00 3.00 4.00 22.00 900.00 200.00 10.00 700.00 1,000.00 1.00 3,500.00 5,000.00 18,700.00 540.00 2,000.00 12.07500 4000 870.00 7,052.50 10,500.00 12,420.00 12,420.00 49000 85.50 18000 120.00 120.00 4,000.00 - 4,850.00 2.100.00 2,400.00 1,250.00 2.40000 1,800.00 2.400.00 2,200.00 9000 10000 50.00 700.00 1.000.00 410.00 3,500.00 5,000.00 28.50 2.40 3700 15.00 2100 7.00 3.70 700 51.25 5325 155.00 2.10 4.80 9.50 1110 1,900,00 44.00 40.00 28.00 21000 630.00 190 170 4300 68000 105.00 10.50 420.00 50000 2.60 4.20000 2,400.00 Amount 24.225.00 64800 1,850.00 12,075.00 230.00 3.04500 7,455.50 11.700.00 7,072.50 7,348.50 1,085.00 598.50 28.80 114.00 2620 380000 4,268.00 3.360.00 3,360.00 5,250.00 1,260.00 1,140.00 2,220.00 4,300.00 680.00 52.50 52.50 42000 500.00 1,066.00 4,200.00 2400.00 Price 25.00 3.00 36.00 15.00 10.00 700 4.00 9.00 46.00 49.00 100.00 800 30.00 25.00 50.00 140000 42.00 40.00 35.00 50.00 900,00 4.00 3.50 50.00 500.00 100.00 20.00 250.00 1000.00 100 10000,00 1500.00 Amount 21,250.00 810.0. 1,800.0, 12,075.50 100.X 3,045.00 8,060.00 13,500.30 6,348.•• 6,762. • 7011OD( 2,280. 180. 300. 100. 2.800 4.074. 3160. 4,200. 1.250 00 1.80000 1400.00 2,100.001 5,000.• • 500•• 50.•• 100.•• 250.• 7.000.•• 738... 10.000, 1900..• Bid Error 25 Corrected T o t a l s : Corrections: 104,899.00 - 106,572.72 107,899.00 111,23125 112,673.00 115,831.00 Precast Reinforced Concrete Flared End Sections. 12' Totals - -- Overt Under -••• Percent - - •• 900.00 118.432.00 106,572.72 1073.72 1.60% 107,899.00 3,000.00 2.86% 111,23125 6.33225 - 6.04% 112,673.00 7,774.00 7.41% 115,831.00 10.932.00 10.42% 118,432.00 13.533.00 1290%