Loading...
O-63-10 Ord Adopting Annual Fee ScheduleORDINANCE Annual Fee Ordinance NOW, THEREFORE BE IT ORDAINED by the President and Board of Trustees of the Village of Lemont that: SECTION 1: CREATES AN ORDINANCE ESTABLISHING FEES, CHARGES, RATES AND REGULATORY MEASURES FOR FY 10 /11 SECTION 2: It is intended that the fees, charges, rates and regulatory measures set forth herein will be reviewed periodically by the President and Board of Trustees. Accordingly, some or all of the provisions of this Ordinance may be amended from time to time. SECTION 3: SCHEDULE OF FEES, CHARGES AND RATES. Delinquent Fees — the Village shall receive a reimbursement of $15.00 for returned checks to the Village of Lemont Dog and Cat License (6.04.080) - $3.00 Excessive False Alarms (9.08.030) Upon any alarm system producing a fourth, fifth, sixth or seventh false alarm in a calendar year, a fee of ten dollars per false alarm shall be charged to the subscriber. 1. The following fee schedule shall be used for each additional false alarm: a. Eighth, ninth, tenth and eleventh false alarms in a calendar year, a fee of twenty - five dollars per false alarm shall be assessed; b. Twelve or more false alarms in a calendar year, a fee of fifty dollars per false alarm shall be assessed. 2. All fees assessed must be paid to the village finance department, or a written appeal must be submitted to the village administrator within three days of the fee assessment. Commuter Parking Fees (10.22.020) 1. The fee for each such permit shall be as follows: a. Quarterly permit, fifty dollars; b. Six -month permit, ninety -eight dollars and fifty cents; c. Annual permit, one hundred ninety -four dollars. 2. These permit fees shall be effective for permits sold for the third quarter of 1993 and subsequent time periods. 3. The fee for daily designated parking spaces shall be one dollar per day. The payment of such fee shall be paid in advance by depositing said sum in a designated depository. Vehicle Licenses (10.32.010) Motorcycles or motor bicycles $39.00 Passenger vehicles 48.00 Trucks "B" license (pickup and R.V.) 60.00 Trucks "D" and "F" licenses 105.00 Trucks "H" and "J" through "Z" 123.00 Buses and motor homes 57.00 Antique vehicles 6.00 Transfer or replacement licenses 3.00 Vehicle License — Senior Citizen Discount (10.32.022) Passenger vehicles $16.00 (first vehicle), $32.00 (each additional vehicle) Trucks "B" license (pickup and R.V.) $20.00 (first vehicle), $40.00 (each additional vehicle) Excavation Permit Fee (12.20.040)- The Fee for such permits shall be $25 Construction of Utility Facilities in the Public Right of Way Application Fee (12.30.040) - All applications for permits pursuant to this chapter shall be accompanied by a fee in the amount of $250. Meter Testing (13.08.040) - $2 Water for Construction (13.08.050) — Deposits $150.00 per meter $50.00 per backflow preventor (if necessary) All deposits are to be paid in full prior to the meter being issued. Meter Rental Fees $50.00 per month $10.00 per day Meter Usage Rates $50.00 minimum -- 4,000 gallons or less $10.00 for each additional 1,000 gallons Water Rates (13.08.060) Water service effective after September 30, 2009 shall be charged in accordance with the following schedule: 1. Single- family residence, twenty -eight dollars and seventy -three cents ($28.73) minimum charge, plus five dollars and seventy cents ($5.70) per one thousand gallons for each one thousand gallons in excess of four thousand gallons; 2. Single business building, twenty -eight dollars and seventy -three cents ($28.73) minimum charge, plus five dollars and seventy cents ($5.70) per one thousand gallons for each one thousand gallons in excess of four thousand gallons; 3. Multiple - family residence, twenty -eight dollars and seventy -three cents ($28.73) minimum charge, plus five dollars and seventy cents ($5.70) per one thousand gallons for each one thousand gallons in excess of four thousand gallons; 4. Multiple business building, , twenty -eight dollars and seventy -three cents ($28.73) minimum charge, plus five dollars and seventy cents ($5.70) per one thousand gallons for each one thousand gallons in excess of four thousand gallons; 5. Residential - business building, , twenty -eight dollars and seventy -three cents ($28.73) minimum charge, plus five dollars and seventy cents ($5.70) per one thousand gallons for each one thousand gallons in excess of four thousand gallons; Water service effective after September 30, 2010, and annually thereafter, shall be increased in accordance with the following schedule unless the village "proves -up" the coverage on any outstanding bonds per the most recent audit and determines that the rate increase may be reduced: 1. Single - family residence, the minimum charge shall be increased by three percent annually, plus the per one thousand gallons charge for each one thousand gallons in excess of four thousand gallons shall be increased by two percent annually; 2. Single business building, the minimum charge shall be increased by three percent annually, plus the per one thousand gallons charge for each one thousand gallons in excess of four thousand gallons shall be increased by two percent annually; 3. Multiple- family residence, the minimum charge shall be increased by three percent annually per dwelling unit, plus the per one thousand gallons charge for each one thousand gallons in excess of four thousand gallons shall be increased by two percent annually per dwelling unit; 4. Multiple business building, the minimum charge shall be increased by three percent annually per business unit, plus the per one thousand gallons charge for each one thousand gallons in excess of four thousand gallons shall be increased by two percent annually per business unit; 5. Residential- business building, the minimum charge shall be increased by three percent annually per residential or business unit, plus the per one thousand gallons charge for each one thousand gallons in excess of four thousand gallons shall be increased by two percent annually per residential or business unit. Water Rates Senior Citizen Discount (13.08.070) Fixed rate of twelve dollars and ten cents minimum charge, plus three dollars and three cents per one thousand gallons for each one thousand gallons in excess of four thousand gallons. Water Turn -On Fee (13.08.080) - $10 Sewer Rates (13.09.020) 1. Single - family residence, twenty -five dollars ($25); 2. Single- business building, twenty -five dollars ($25)minimum charge plus twenty - five cents per one thousand gallons for each one thousand gallons in excess of twenty thousand gallons; 3. Multiple- family residence, twenty -five dollars ($25)minimum charge plus twenty -five cents per one thousand gallons for each one thousand gallons in excess of twenty thousand gallon allowance per dwelling unit; 4. Multiple- business building, twenty -five dollars ($25)minimum charge plus twenty -five cents per one thousand gallons for each one thousand gallons in excess of twenty thousand gallon allowance per business unit; 5. Residential business building, twenty -five dollars ($25)minimum charge plus twenty -five cents per one thousand gallons for each one thousand gallons in excess of twenty thousand gallon allowance per residential or business unit. Sewer Turn -On Fee (13.09.040) - $10 Sewer Rates Senior Citizen Discount (13.09.070) Fixed rate of seventeen dollars ($17) Contamination Cleanup Cost — Water Service Reconnection Fee (13.12.050) -$10 Clean -Up Bond (15.00.070) - $1,000 (refundable) Inspections (15.00.090 and 15.02.080) — Reinspection Fee — First Reinspection $80; Subsequent Reinspections - $100 Certificate of Occupancy (15.00.110(e)) — Temporary Occupancy -$500 (refundable) Building Permit Fees (15.02) New Single Family, Duplex and Townhouse Building Permit Fees (15.02.010 (a)) Building Permit and Inspection Fee $0.25 per ft2 (basement and garage included) Minimum Charge $1,200.00 New Multifamily/Nonresidential Buildings or additions /renovations to existing structures (15.02.010(b)) Building Valuation/Construction Cost $ 0.00 and up to $ 2,499.99 $ 50.00 $ 2,500.00 and up to $ 3,999.99 $ 75.00 $ 4,000.00 and up to $ 5,999.99 $ 100.00 $ 6,000.00 and up to $ 7,999.99 $ 125.00 $ 8,000.00 and up to $ 9,999.99 $ 155.00 $ 10,000.00 and up to $ 12,499.99 $ 200.00 $ 12,500.00 and up to $ 14,999.99 $ 225.00 $ 15,000.00 and up to $ 17,499.99 $ 250.00 $ 17,500.00 and up to $ 19,999.99 $ 300.00 $ 20,000.00 and up to $ 24,999.99 $ 350.00 $ 25,000.00 and up to $ 29,999.99 $ 400.00 $ 30,000.00 and up to $ 39,999.99 $ 450.00 $ 40,000.00 and up to $ 49,999.99 $ 550.00 $ 50,000.00 and up to $ 74,999.99 $ 750.00 $ 75,000.00 and up to $ 99,999.99 $ 925.00 $ 100,000.00 and up to $ 124,999.99 $1,150.00 $ 125,000.00 and up to $ 149,999.99 $1,375.00 $ 150,000.00 and up to $ 174,999.99 $1,600.00 $ 175,000.00 and up to $ 200,000.00 $1,800.00 $ 200,000.00 and up to $ 999,999.99 $1,800.00 for first $ 200,000.00 + $7.50 for each additional $1,000.00 (or fraction thereof) above $200,000.00 $ 1,000,000.00 and above $7,750.00 for first $1,000,000.00 + $6.25 for each additional $1,000.00 (or fraction thereof) above $1,000,000.00 Plan Review — In -house (15.02.020(b)) Building (commercial and multifamily) $100.00 0 to 60,000 ft3 $ 325.00 60,001 to 80,000 $ 400.00 80,001 to 100,000 $ 510.00 100,001 to 150,000 $ 585.00 150,001 to 200,000 $ 665.00 Over 200,000 per 10,000 or fraction thereof $ 5.00 Mechanical 0.25 x Building Fee Electrical 0.25 x Building Fee Plumbing 0.25 x Building Fee Single - Family /Townhomes $ 375.00 /dwelling unit Additional reviews, in excess of 2 $100.00 each Remodeling/Additions $250.00 Additional Permit Fees (15.02.030) Construction trailer $100.00 Driveways $100.00 Lawn sprinkler systems - Less than 75 heads - Over 75 heads $60.00 $30.00 each additional 50 heads or fraction thereof Re -roof (residential single - family only) $50.00 Sewer /water repair $85.00 Plumbing Fees (15.02.040) A. New Construction. New single - family, duplex and townhouse buildings $325.00 Plumbing permit fees for new construction other than that listed above will be combined with the building permit fee as figured in Section 15.20.010(B) of this title. This fee will be based on total construction costs and include all structural, electrical, plumbing, mechanical, interior and exterior finishes and normal site preparation. B. Except as provided above, the permit fees for plumbing work shall be as indicated in the following schedule: 1. Three (3) fixtures or less Sheds (120 sq. ft. or less) $85.00 Signs (permanent) Additional fee for electrical connection $1.25 /sq. ft. - $50.00 minimum Temporary tents $80.00 Commercial occupancy permit $150.00 Over 100 heads Plumbing Fees (15.02.040) A. New Construction. New single - family, duplex and townhouse buildings $325.00 Plumbing permit fees for new construction other than that listed above will be combined with the building permit fee as figured in Section 15.20.010(B) of this title. This fee will be based on total construction costs and include all structural, electrical, plumbing, mechanical, interior and exterior finishes and normal site preparation. B. Except as provided above, the permit fees for plumbing work shall be as indicated in the following schedule: 1. Three (3) fixtures or less $60.00 2. Each additional fixture or opening $6.00 (Items to be counted as fixtures include, without limitation: water closets, bidets, lavatories, bathtubs, hot water heaters, showers, kitchen sinks, utility sinks, drinking fountains, urinals, ejector pits, sump pits, floor drains, and dishwashing machines). 3. Fire sprinkler systems: 100 heads or less $180.00 Over 100 heads +$60.00 /additional 100 heads or fraction thereof 4. Lawn sprinkler systems: 75 sprinkler heads or less $60.00 Over 75 sprinkler heads +$30.00 /additional 50 heads or fraction thereof 5. Water connection charges to connect to the village water distribution system shall be as follows: a. Single- family $2,500.00 /dwelling unit b. Duplex, townhome, and multifamily $2,500.00 per dwelling unit c. Motels, hotels, institutional, commercial and industrial buildings: Water Service Lines 1 &Prime; $2,500.00 1- 1/4 &Prime; up to and including 2 &Prime; $3,000.00 2- 1/2 &Prime; up to and including 3 &Prime; $4,500.00 4 &Prime; $6,000.00 5 &Prime; $7,500.00 6 &Prime; $9,000.00 8 &Prime; $10,500.00 10 &Prime; or greater $12,000.00 d. Connection charges shall not be applicable to any current water customer who may be connected to a water service line rather than directly to the village water system. e. Water connection charges for any hotel, motels, institutional, commercial or industrial building shall be waived if all the following conditions apply: i. The water connection charge is solely related to an upgraded service connection required for the installation of a fire sprinkler system. ii. The building or structure was constructed prior to January 1, 1998. iii. A water service connection existed prior to January 1, 1998. 6. Water meters: a. All meters Cost plus installation b. Handling fee $120.00 7. Sewer connection charges (connect to village sanitary sewer system): a. Single - family $2,500.00 /unit b. Duplex, townhome, multifamily $2,500.00 /unit c. Motels and hotels $1,000.00 /room d. Institutional, commercial and industrial buildings to be based on size of water service lines and its population equivalents (PE). Connection charges shall be as follows: Sewer Service Lines 1 &Prime; $2,500.00 1- 1/4 &Prime; up to and including 2 &Prime; $4,320.00 2- 1/2 &Prime; up to and including 3 &Prime; $6,480.00 4 &Prime; and over $9,000.00 + $240.00 x PE e. Connection charges shall not be applicable to any current sewer customer who may be connected to a sewer service line rather than directly to the village sanitary sewer system. Mechanical Fees (15.02.050) Except as provided in 15.02.050(a), the permit fees for all mechanical work shall be as indicated in the following schedule: $0.00 and up to $15,000.00 $50.00 $15,001.00 and over $50.00 + $50.00 /$5,000.00 or fraction thereof Electrical Fees (15.02.060) A. New Construction. New single - family, duplex and townhouse buildings $325.00 Electrical permit fees for new construction other than that listed above will be combined with the building permit fee as figured in Section 15.02.010(B) of this chapter. This fee will be based on total construction costs and include all structural, electrical, plumbing, mechanical, interior and exterior finishes and normal site preparation. B. Except as provided above, the permit fees for all electrical work shall be as indicated in the following schedule: 1. Installations or alterations of electrical services: 0 to 200 ampere, 3 or 4 wire $50.00 201 to 1,000 ampere, 3 or 4 wire $75.00 Fees for services in excess of 1,000 amperes shall be computed on the basis of the rating of the service disconnects installed, prorated according to the schedule above. 2. New fixtures, sockets, or receptacles $10.00 /circuit 3. Minimum permit fee $50.00 4. For each motor or current - consuming device other than lighting fixtures: One motor or current- consuming device $10.00 Each additional motor or current device $5.00 5. Signs $ 1.25/sq. ft. - minimum $50.00 Freestanding signs requiring a separate service shall require an additional service permit based on the fee schedule above. Grading Review (15.02.070) Initial Review - $650 Additional Reviews - $100 per additional review Land Use Application Fees (Appendix A of Chapter 17) Annexation $250 per zoning lot Rezoning Application fees for re- zoning shall be based on total area to be re -zoned as follows: < 2 acres $300 2 to < 5 acres $500 5to <10acres $750 10 to < 20 acres $1,000 20 acres or more $1,250 Variation Appeal $250 per zoning lot $500 Special Use < 10 acres $500 10 acres or more $750 Preliminary Applications for preliminary plat shall be based on total area of subdivision plus the proposed and /or existing number of dwelling units as follows: Plat < 3 acres $300 3 to < 5 acres $600 5 to < 10 acres $1,000 10 acres or more $1,200 plus $50 per existing and /or proposed dwelling unit Final Plat Other Plats Uf Applications for final plat shall be based on total area of subdivision plus the proposed and /or existing number of dwelling units as follows: < 3 acres $300 3 to < 5 acres $600 5 to < 10 acres $1,000 10 acres or more $1,200 plus $25 per existing and /or proposed dwelling unit A lications for all other fats will be $300 •er •• • Planned unit development fees, upon application, shall be the total of the all applicable fees for: annexation, rezoning, special use, and preliminary plat Additionally, final plat fees shall be paid upon application for final plat approval. Escrow accounts shall be established with the Village for the following land use applications and in the following amounts: Rezoning $500 Zoning Variation $500 Special Use $500 Subdivision $750 Annexation $750 P U Ds ', 2,000 Site development permit fees are based on the type of development: single - family residential, residential subdivision, or commercial, as indicated below. Single -lot residential development Fee is based on acreage of disturbed area as follows: Less than 0.5 acres $200 0.5 acres and less than 2.0 acres $500 More than 2.0 acres, then fee is: $700 Residential Subdivisions Fee is based on the following formula: (ACRES x $100) + (ENGINEER'S ESTIMATE x 0.05) Commercial Development Fee is based on the following formula: (ACRES x $750) + (ENGINEER'S ESTIMATE x 0.025) Where "ENGINEER'S ESTIMATE" = the total estimated cost of all on -site public improvements to be installed or constructed. SECTION 4: Effective Date: This Ordinance shall be in full force and effect from and after its passage, approval and publication in the manner provided by law. Each provision of this Ordinance shall remain in full force and effect unless otherwise expressly provided or expressly amended by subsequent ordinance, in which case the amended provision shall be immediately effective. SECTION 5: Repealer: All Ordinances or parts of Ordinances in conflict herewith shall be and the same are hereby repealed. The Village Clerk of the Village of Lemont shall certify to the adoption of this Ordinance and cause the same to be published in pamphlet form. Grading Review (15.02.070) Initial Review - $650 - Additional Reviews - $100 per additional review Land Use Application Fees (Appendix A of Chapter 17) Annexation $250 per acre, existing zoning lot, existing dwelling unit, or proposed zoning lot or dwelling unit, whichever is greater. A filing fee of 10% of the total fee, or a minimum of $250, is payable upon application. The balance is due prior to approval of the final plat of subdivision. If the territory being annexed will not be subdivided, i.e. there be no application for final plat, then the balance is due prior to approval of the annexation. Rezoning Application fees for re- zoning shall be based on total area to be re -zoned as follows: < 2 acres $300 2 to < 5 acres $500 5 to < 10 acres $750 10 to < 20 acres $1,000 20 acres or more $1,250 Variation Appeal $250 per zoning lot $500 Special Use < 10 acres $500 10 acres or more .750 Preliminary Applications for preliminary plat shall be based on total area of subdivision Plat plus the proposed and /or existing number of dwelling units as follows: < 3 acres $300 3 to < 5 acres $600 5 to < 10 acres $1,000 10 acres or more $1,200 Final Plat plus $50 per existing and /or proposed dwelling unit Other Plats Applications for final plat shall be based on total area of subdivision plus the proposed and /or existing number of dwelling units as follows: < 3 acres $300 3 to < 5 acres $600 5 to < 10 acres $1,000 10 acres or more $1,200 plus $25 per existing and /or proposed dwelling unit Applications for all other plats will be $300 per Planned unit development fees, upon application, shall be the total of the all applicab fees for: annexation, rezoning, special use, and preliminary plat Additionally, final plat fees shall be paid upon application for final plat approval. ANC Q N. , . Escrow accounts shall be established with the Village for the following land use applications and in the following amounts: Rezoning $500 Zoning Variation $500 Special Use Subdivision Annexation $500 $750 $750 Site development permit fees are based on the type of development: single-family residential, residential subdivision, or commercial, as indicated below. Single-lot residential development Fee is based on acreage of disturbed area as follows: Less than 0.5 acres $200 0.5 acres and less than 2.0 acres $500 More than 2.0 acres, then fee is: $700 Residential Subdivisions Fee is based on the following formula: (ACRES x $100) + (ENGINEER'S ESTIMATE x 0.05) Commercial Development Fee is based on the following formula: (ACRES x $750) + (ENGINEER'S ESTIMATE x 0.025) Where "ENGINEER'S ESTIMATE" = the total estimated cost of all on-site public improvements to be installed or constructed. SECTION 4: Effective Date: This Ordinance shall be in full force and effect from and after its passage, approval and publication in the manner provided by law. Each provision of this Ordinance shall remain in full force and effect unless otherwise expressly provided or expressly amended by subsequent ordinance, in which case the amended provision shall be immediately effective. SECTION 5: Repealer: All Ordinances or parts of Ordinances in conflict herewith shall be and the same are hereby repealed. The Village Clerk of the Village of Lemont shall certify to the adoption of this Ordinance and cause the same to be published in pamphlet form. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LE O T, COOK, WILL AND DU PAGE COUNTIES ILLINOIS on this l3 Day of , 2010 Debby Blatzer Paul Chialdikas Clifford Miklos Rick Sniegowski Ronald Stapleton Jeanette Virgilio AYES NAYS PASSED ABSENT f v v v V Approved by me this 13th day of September, 2010 BRIAN REAVES, Village President Attest: CHARLENE M. SMOLLEN, Village Clerk