Loading...
O-46-07 06/25/2007VILLAGE OF LEMONT ORDINANCE NO.0 - 116-07 AN ORDINANCE AMENDING CHAPTER 15.29 SOIL EROSION AND SEDIMENT CONTROL ADOPTED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT This 25`" day of June , 2007. Published in pamphlet form by authority of the President and Board of Trustees of the Village of Lemont, Cook, Will and DuPage Counties, Illinois, this 25th day of June , 2007 . AN ORDINANCE AMENDING CHAPTER 15.29 SOIL EROSION AND SEDIMENT CONTROL BE IT ORDAINED by the President and Board of Trustees of the Village of Lemont that the LEMONT MUNICIPAL CODE CHAPTER 15.29 entitled ESOIL EROSION AND SEDIMENT CONTROL ORDINANCE OF THE VILLAGE OF LEMONT, be amended by adding Article 15.29.040.D5 as follows: 15.29.040. D5 For developments disturbing one (1) acre of more of land, a "Notice of Intent" must be filed with the IEPA for inclusion in the NPDES Permit ILR10, and a Stormwater Pollution Prevention Plan (SWPPP) must be submitted for review. The stormwater pollution prevention plan (SWPPP) must meet the following requirements: a) Minimum design level unless otherwise specified by more stringent regulations, shall be a storm event equal to or greater than a twenty -five (25) year twenty -four (24) hour rainfall event. b) The SWPPP must clearly identify for each measure identified in the plan, the contractor(s) that will implement the measure, and all contractor(s) and subcontractor(s) shall sign the following certificate (include in SWPPP). "I certify under penalty of law that I understand the terms and conditions of the general National Pollution Discharge Elimination System (NPDES) permit (ILR10) that authorizes the stormwater discharges associated with industrial activity from the construction site identified as part of this certification ". The certification must include the name and title of the person providing the signature of the contracting firm; the address (or other identifying description) of the site; and the date of the certification. c) The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of the NPDES ILRIO permit and with the requirements of the SWPPP. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. Proper operation and maintenance requires the operation of backup or auxiliary facilities or similar systems, installed by a permittee only when necessary to achieve compliance with the conditions of the permit. d) Inspection by permittee is required at least once every seven (7) calendar days and within twenty -four (24) hours of the end of a storm that is a half (0.5) inch or greater or five (5) inches or greater snowfall. Based on inspection results, modifications shall provide for timely implementation of any changes to the plans within seven (7) calendar days. The inspection report shall summarize scope of inspection, name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, and major observations relating to the implementation of the SWPPP. These records shall be retained as part of the SWPPP for at least three (3) years from the date that the permit coverage expires or is terminated. e) The permittee shall complete and submit to IEPA and the Village within five (5) days an "Incidence of Noncompliance" (ION) report for any violation of the SWPPP observed during an inspection conducted, including those not required by the plan. f) Upon completion of the project, a "Notice of Termination" must be filed with the IEPA. Use of the "Technical Manual Designed for Urban Ecosystem Protection and Enhancement" (Illinois Urban Manual,) 2002 or latest edition, prepared for the Illinois Environmental Protection Agency by the United States Department of Agriculture - Natural Resources Conservation Service, is made a part hereof by this reference, for purposes of exemplifying the considerations and factors which should enter into preparation of a soil erosion control plan and SWPPP. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COOK, DuPAGE, and WILL COUNTIES, ILLINOIS, on this 25h day of June , 2007 Debby Blatzer Peter Coules Clifford Miklos Brian Reaves Ronald Stapleton Jeanette Virgilio Attest: AYES NAYS PASSED ABSENT JO F. PIAZZA, Vi age esident ARLENE SMOLLEN, Village Clerk