R-44-05 Authorizing Approval Of Change Order NO. 1 For Well NO. 6 Softening PlantRESOLUTION k-14/4-06 RESOLUTION AUTHORIZING APPROVAL OF CHANGE ORDER NO. 1 FOR WELL NO. 6 SOFTENING PLANT WHEREAS, the Village of Lemont requires that the Well No. 6 Softening Plant project be completed; and WHEREAS, the Village seeks to utilize the construction firm of IHC Construction, Inc. for such work; and WHEREAS, IHC Construction, Inc. submitted a low bid for such work in the amount of $2,724,000.00, which is above the budgeted amount for the project of $2,000,000.00. Therefore, a Change Order No. 1, in the amount of $492,566.00 is proposed in order to bring the project construction cost closer to the budgeted amount. (The revised Contract value would, therefore, be $2,231,434.00.) NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the approval of Change Order No. 1, in the net deduction amount of $492,566.00, is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DuPAGE, ILLINOIS, on this 8th day of August, 2005. Debby Blatzer Peter Coules Clifford Miklos Brian Reaves Ronald Stapleton Jeanette Virgilio AYES NAYS PASSED ABSENT Approved by me this 8111 day of August, 2005. Attest: . %. , ..e_/_sr/ /lam ARLENE SMOLLEN, Village Clerk 1 14-dfigile ' -adrifiggile 1 Air rot. HARLENE SMOLLEN, Village Clerk Approved as to form: JOHN ANTONOPOULOS, Village Attorney Date: August 8, 2005 Hue 03 05 12:24p August 2, 2005 CHANGE ORDER NO. I PROJECT: Well No. 6 Softening Facility OWNER: Village of Lemont CONTRACT: Contract 1 -2004 CONTRACTOR: IBC Construction, Inc. p.4 Description of Change 1 a 12 inch Watermain Changes DEDUCT ($6,010.00) 1 b Reduce pavement extent and thickness DEDUCT ($8,619.00) lc Delete holding tank in NW corner DEDUCT ($2,125.00) Id Delete Door 8 and ladder DEDUCT ($2,700.00) le Add b -box for gate valve ADD $300.00 If Delete GUH03, EF02 & EF04 in the DEDUCT ($36,500.00) generator room lg Delete doors 4 and 10 DEDUCT ($6,009.00) lh Delete Chimney detail A/9 DEDUCT ($2,130.00) I i Delete Water heater DEDUCT ($1,086.00) Ij Delete Fire protection system DEDUCT ($5,000,00) 1k Reduce gas piping size DEDUCT ($865.00) 11 Delete fiberglass doors and replace with HM DEDUCT ($2,000.00) lm Delete all requirements Sections 10441, DEDUCT ($630.00) 10520, and 10522 in Delete W &T Chlorination system (Owner to DEDUCT ($29,000.00) provide) lo Delete Thermostatic Mixing Valve TMV -I DEDUCT ($2,436,00) 1p Fire Alarm system DEDUCT ($5,100.00) Iq Card entry system DEDUCT ($2,500.00) Hug 03 05 12:24p [Owner] - [Contractor] Contract , Change Order No. Page 2 [Date] p.5 lr Delete all electrical work in "generator room" DEDUCT ($8,300.00) 1 s Transfer Switch Allowance ADD $14,000.00 1 t Relocate CECO transformer within (20') of DEDUCT ($5,100.00) building service entrance lu Delete all 16951 Spare parts DEDUCT ($4,100.00) lv Deduct Generator and Accessories DEDUCT ($2I9,741.00) lw Deduct Bronze Bowls DEDUCT ($65,820.00) Ix Deduct 10 -inch drop pipe DEDUCT ($14,670.00 ly Deduct Glazed Tile DEDUCT ($60,000.00 lz Deduct Generator Room General DEDUCT ($16,425.00) Construction TOTAL VALUE OF THIS CHANGE ORDER: DEDUCT ($492,566.00) Contract Price Adjustment Original Contract Price $2,724,000 Previous Change Order Adjustments $0 Adjustment in Contract Price this Change Order DEDUCT $492,566 Current Contract Price including this Change Order $2,231,434 Contract Completion Date Adjustment Original Contract Completion Date September 30,2006 Contract Completion Date Adjustments due to 0 Days previous Change Orders Contract Completion Date Adjustments due to this 0 Days Change Order Current Contract Completion Dates including all 0 Days Change Orders Job Nallnitials\CADoctmients and SettingsUGalasinsla\Loeal Satins \Temporary !meant Fi]es\OLICEf Change Orden No 1 a.doc Village of Lemont/ IHC Construction, Inc. Change Order No. 1 August 2, 2005 This document shall become a supplement to the Contract and all provisions will apply. APPROVED CONTRACTOR — IHC Construction, Inc. Date APPROVED August 8, 2005 OWNER — Village of Lemont Date ❑ The above - signed determine that the circumstances which necessitate this change were not reasonably foreseeable at the time the contract was signed. ❑ The above - signed determine that the circumstances which necessitate this change were not within the contemplation of the contract as signed. 0 The above - signed determine that this change is in the best interest of the local agency and is authorized by law.