Loading...
R-66-05 Authorizing Approval Of an Engineering Agreement With McDonough Associates Inc. In Conjunction With 127th Street, Smith Road To State StreetRESOLUTION R-6, 640-5- RESOLUTION AUTHORIZING APPROVAL OF AN ENGINEERING AGREEMENT WITH MCDONOUGH ASSOCIATES, INC. IN CONJUNCTION WITH 127th STREET, SMITH ROAD TO STATE STREET WHEREAS, the Village of Lemont requires engineering services related to the preliminary engineering (Phase II engineering) for the 127th Street reconstruction project, from Smith Road to State Street; WHEREAS, the Village of Lemont seeks to utilize the firm of McDonough Associates, Inc.; and WHEREAS, the Village and McDonough Associates, Inc., in coordination with the Cook County Highway Department, have negotiated an agreement to identify the terms and conditions of the services to be provided. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the agreement attached is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DuPAGE, ILLINOIS, on this 26th day of September, 2005. Debby Blatzer Peter Coules Clifford Miklos Brian Reaves Ronald Stapleton Jeanette Virgilio AYES ✓/ NAYS PASSED ABSENT HARLENE SMOLLEN, Village Clerk Approved by me this 26th day of September, 2005. A test: CHARLENE SMOL N, Village Clerk Approved as to form: JOHN ANTONOPOULOS, Village Attorney Date: September 26, 2005 Local Agency Village of Lemont L p C A L A G E N C Y Illinois Department of Transportation Preliminary Engineering Services Agreement For Federal Participation C o N S U L L T A N T Consultant McDonough Associates, Inc. County Cook Address 130 East Randolph Drive, Suite 1000 Section 97- 00025 -00 -wr TIP# 06 -99 -0011 City Chicago STPM-7003(498) 00 STPM- 7003(498) State Illinois Job No : P -91 Zip Code 60601 -6214 Contact Name /Phone/E -mail Address Mr. Gary Holmes (630) 243 -1550 Contact Name /Phone /E -mail Address Mr. Feroz Nathani (312) 946 -7104 fnathaniamaiengr.com THIS AGREEMENT is made and entered into this day of between the above Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the PROJECT. Federal -aid funds allotted to the LA by the state of Illinois under the general supervision of the Illinois Department of Transportation (STATE), will be used entirely or in part to finance engineering services as described under AGREEMENT PROVISIONS. Name 127`" Street Termini From just west of Smith Road to State Road Project Description Route FAU 1591 Length 1.3 mi. Structure No. N/A Description: All work necessary to perform preliminary engineering (Phase II) for the widening and reconstruction of 1273' Street from west of Smith Road to State Street in the Village of Lemont. (Cook County Highway Department will financially participate in this project). Agreement Provisions I. THE ENGINEER AGREES, To perform or be responsible for the performance, in accordance with STATE approved design standards and policies, of engineering services for the LA for the proposed improvement herein described. 2. To attend any and all meetings and visit the site of the proposed improvement at any reasonable time when requested by representatives of the LA or STATE. 3. To complete the services herein described within calendar days from the date of the Notice to Proceed from the LA, excluding from consideration periods of delay caused by circumstances beyond the control of the ENGINEER. 4. The classifications of the employees used in the work should be consistent with the employee classifications and estimated man - hours shown in EXHIBIT A. If higher - salaried personnel of the firm, including the Principal Engineer, perform services that are indicated in Exhibit A to be performed by lesser - salaried personnel, the wage rate billed for such services shall be commensurate with the payroll rate for the work performed. 5. That the ENGINEER is qualified technically and is entirely conversant with the design standards and policies applicable for the PROJECT; and that the ENGINEER has sufficient properly trained, organized and experienced personnel to perform the services enumerated herein. 6. That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or corrections resulting from the ENGINEER's errors, omissions or negligent acts without additional compensation. Acceptance of work by the STATE will not relieve the ENGINEER of the responsibility to make subsequent correction of any such errors or omissions or for clarification of any ambiguities. 7. That all plans and other documents furnished by the ENGINEER pursuant to this AGREEMENT will be endorsed by the ENGINEER and will affix the ENGINEER's professional seal when such seal is required by law. Plans for structures to be built as a part of the improvement will be prepared under the supervision of a registered structural engineer and will affix structural engineer seal when such seal is required by law. It will be the ENGINEER's responsibility to affix the proper seal as required by the Bureau of Local Roads and Streets manual published by the STATE. 8. That the ENGINEER will comply with applicable federal statutes, state of Illinois statutes, and local laws or ordinances of the LA. BLR 4351 (Rev. 4/02) Page 1 of 6 9. The undersigned certifies neither the ENGINEER nor I have: a) employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other than a bona fide employee working solely for me or the above ENGINEER) to solicit or secure this AGREEMENT, b) agreed, as an express or implied condition for obtaining this AGREEMENT, to employ or retain the services of any firm or person in connection with carrying out the AGREEMENT or c) paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for me or the above ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the AGREEMENT. d) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency, e) have not within a three -year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal, State or local) transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property, f) are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (e) and have not within a three -year period preceding this AGREEMENT had one or more public transactions (Federal, State or local) terminated for cause or default. 10. Scope of Services to be provided by the ENGINEER g) • Make such detailed surveys as are necessary for the planning and design of the PROJECT. ❑ Make stream and flood plain hydraulic surveys and gather both existing bridge upstream and downstream high water data and flood flow histories. ❑ Prepare applications for U.S. Army Corps of Engineers Permit, Illinois Department of Natural Resources Office of Water Resources Permit and Illinois Environmental Protection Agency Section 404 Water Quality Certification. ❑ Design and/or approve cofferdams and superstructure shop drawings. ❑ Prepare Bridge Condition Report and Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or culvert types and high water effects on roadway overflows and bridge approaches). ❑ Prepare the necessary environmental and planning documents including the Project Development Report, Environmental Class of Action Determination or Environmental Assessment, State Clearinghouse, Substate Clearinghouse and all necessary environmental clearances. ❑ Make such soil surveys or subsurface investigations including borings and soil profiles as may be required to furnish sufficient data for the design of the proposed improvement. Such investigations to be made in accordance with the current Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal -Aid Procedures for Local Highway Improvements or any other applicable requirements of the STATE. • Analyze and evaluate the soil surveys and structure borings to determine the roadway structural design and bridge foundation. ® Prepare preliminary roadway and drainage structure plans and meet with representatives of the LA and STATE at the site of the improvement for review of plans prior to the establishment of final vertical and horizontal alignment, location and size of drainage structures, and compliance with applicable design requirements and policies. ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient data for the design of the proposed improvement. ® Complete the general and detailed plans, special provisions and estimate of cost. Contract plans shall be prepared in accordance with the guidelines contained in the Bureau of Local Roads and Streets manual. The special provisions and detailed estimate of cost shall be furnished in quadruplicate. ❑ Furnish the LA with survey and drafts in quadruplicate all necessary right -of -way dedications, construction easements and borrow pit and channel change agreements including prints of the corresponding plats and staking as required. BLR 4351 (Rev. 4/02) Page 2 of 6 II. THE LOCAL AGENCY AGREES, 1. To furnish the ENGINEER all presently available survey data and information 2. To pay the ENGINEER as compensation for all services rendered in accordance with this AGREEMENT, on the basis of ® Direct Labor Multiplier or ❑ specific rate. The total compensation for this shall not exceed $ 295,219.27. 3. To pay the ENGINEER in the following manner: 3a) Upon completion of the contract plans, specifications and estimates, 100% of the fee established for the project will be paid to the engineer. Payment to the Engineer will be made on progress billings. 4. The recipient shall not discriminate on the basis of race, color, national origin or sex in the award and performance of any DOT - assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The recipient shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of DOT - assisted contracts. The recipient's DBE program, as required by 49 CFR part 26 and as approved by DOT, is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as violation of this agreement. Upon notification to the recipient of its failure to carry out its approved program, the Department may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.). III. IT IS MUTALLY AGREED, 1. That no work shall be commenced by the ENGINEER prior to issuance by the LA of a written Notice to Proceed. 2. That tracings, plans, specifications, estimates, maps and other documents prepared by the ENGINEER in accordance with this AGREEMENT shall be delivered to and become the property of the LA and that basic survey notes, sketches, charts and other data prepared or obtained in accordance with this AGREEMENT shall be made available, upon request, to the LA or to the STATE, without restriction or limitation as to their use. 3. That all reports, plans, estimates and special provisions furnished by the ENGINEER shall be in accordance with the current Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal -Aid Procedures for Local Highway Improvements or any other applicable requirements of the STATE, it being understood that all such fumished documents shall be approved by the LA and the STATE before final acceptance. During the performance of the engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the documents herein enumerated while they are in the ENGINEER's possession and any such loss or damage shall be restored at the ENGINEER's expense. 4. That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties without written consent of the LA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this agreement. 5. To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and the STATE; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for which adequate books, records and supporting documentation are not available to support their purported disbursement. 6. The payment by the LA in accordance with numbered paragraph 3 of Section II will be considered payment in full for all services rendered in accordance with this AGREEMENT whether or not they be actually enumerated in this AGREEMENT. 7. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error, omission and /or negligent act in the prosecution of the ENGINEER's work and shall indemnify and save harmless the LA, the STATE, and their officers, agents and employees from all suits, claims, actions or damages of any nature whatsoever resulting therefrom. These indemnities shall not be limited by the listing of any insurance policy. BLR 4351 (Rev. 4/02) Page 3 of 6 8. This AGREEMENT may be terminated by the LA upon giving notice in writing to the ENGINEER at the ENGINEER's last known post office address. Upon such termination, the ENGINEER shall cause to be delivered to the LA all drawings, plats, surveys, reports, permits, agreements, soils and foundation analysis, provisions, specifications, partial and completed estimates and data, if any from soil survey and subsurface investigation with the understanding that all such material becomes the property of the LA. The LA will be responsible for reimbursement of all eligible expenses to date of the written notice of termination. 9. This certification is required by the Drug Free Workplace Act (30ILCS 580). The Drug Free Workplace Act requires that no grantee or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property or service from the State unless that grantee or contractor will provide a drug free workplace. False certification or violation of the certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of a contract or grant and debarment of the contracting or grant opportunities with the State for at least one (1) year but no more than five (5) years. For the purpose of this certification, "grantee" or "contractor" means a corporation, partnership or other entity with twenty -five (25) or more employees at the time of issuing the grant, or a department, division or other unit thereof, directly responsible for the specific performance under a contract or grant of $5,000 or more from the State, as defined in the Act. The contractor /grantee certifies and agrees that it will provide a drug free workplace by: (a) Publishing a statement: (1) (2) (3) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance, including cannabis, is prohibited in the grantee's or contractor's workplace. Specifying the actions that will be taken against employees for violations of such prohibition. Notifying the employee that, as a condition of employment on such contract or grant, the employee will: (A) abide by the terms of the statement; and (B) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5) days after such conviction. (b) Establishing a drug free awareness program to inform employees about: (1) The dangers of drug abuse in the workplace; (2) The grantee's or contractor's policy of maintaining a drug free workplace; (3) Any available drug counseling, rehabilitation and employee assistance program; and (4) The penalties that may be imposed upon an employee for drug violations. (c) Providing a copy of the statement required by subparagraph (a) to each employee engaged in the performance of the contract or grant and to post the statement in a prominent place in the workplace. (d) Notifying the contracting or granting agency within ten (10) days after receiving notice under part (B) of paragraph (3) of subsection (a) above from an employee or otherwise receiving actual notice of such conviction. (e) Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by, (f) Assisting employees in selecting a course of action in the event drug counseling, treatment and rehabilitation is required and indicating that a trained referral team is in place. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act. (g) 10. The ENGINEER or subconsultant shall not discriminate on the basis of race, color, national origin or sex in the performance of this AGREEMENT. The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of DOT assisted contracts. Failure by the ENGINEER to carry out these requirements is a material breach of this AGREEMENT, which may result in the termination of this AGREEMENT or such other remedy as the LA deems appropriate. BLR 4351 (Rev. 4/02) Page 4 of 6 Executed by the LA: ATTEST , By: 'LC L/A� f� [�n� By: /772:l Clerk Title: Village of Lemont (SEAL) (Municipality/Township/County) Executed by the ENGINEER: ATTEST: By: Alan Swanson Title: Vice President McDonough Associates, Inc. By: Feroz Nathani Title: Vice President BLR 4351 (Rev. 4/02) Page 5 of 6 F- 0 .c - p� c a> c Q c m d CO c 13 C O aQ a q O y Ear L L_ • m Overhead Rate N- o 0 O 0 O CD • N LL T w 0 X W O- E O c 00 (Municipality/Township/County) C++ • O N yo u�a Cost Estimate of Consultant's Services in Dollars R O 1- Profit In -House Direct Costs Services by Others Overhead* Payroll Costs Payroll Rate Man -Hours Employee Classification Totals Element of Work 0 a) CC CO O PI CO v y and EXHIBIT A 127th Street Improvement (from Smith Road to State Street) VILLAGE OF LEMONT Scope of Work The project will consist of preparing Phase 11 Contract Plans and Specifications for the improvement of 127th Street ( from Smith Road to State Street ). Additional coordination and engineering will also be performed for the purpose of updating the Phase I Report. The improvement will include roadway widening and reconstruction to provide a 3 lane urban cross section (1 lane in each direction with a bi- directional turning lane) The improvement will include an enclosed storm sewer system and sidewalk. The project length (on mainline 127th Street) is approximately 1.5 miles with an omission (approx. 2,200) in the vicinity of and in between east of Rolling Meadows Drive and west of Timberline Drive. The intersection of Smith Road will be reconstructed to provide left turn lanes on all four legs and a northbound to eastbound right tum Iane.The intersection of State Street will not be improved, the project will tie into the west leg of the intersection. The gross length of the entire project is 1.3 miles (including side streets). The project omission will be constructed by others when the 1 -355 Tollway contract (encompassing the 127th Street interchange) is awarded. All work will be performed in accordance with Cook County Highway Department and IDOT Standards, procedures, requirements and criteria. 1. Data Collection, Review and Coordination Man -hours Direct Costs Revise and Update Right -of -way Request and Plot Existing Utilities Coordination /Meetings with CCHD, FHWA, ISTHA, IDOT, Local Agency and Utilities (See Exhibit E) Project Management 8 32 80 60 $ 288.00 Sub -Total 2. Phase I Modification and Update 180 $ 288.00 Man -hours Direct Costs Vertical Profile Modifications Environmental Clearance Update Traffic Analysis Update Technical Memorandum Preparation (See Exhibit E) Coordination Meetings (3 meetings, See Exhibit E) Altemate Typical Section Study Sub -Total 3. Roadway - Contract Plans, Specifications and Estimate Cover Sheet Quantities and Schedules Alignment, Ties, Benchmarks and Right -Of -Way Corners Traffic Control Drawings (2 Stages plus Temporary Signal Plans) Typical Cross Section Drawings Roadway Plan and Profile Drawing (7 Mainline, 1 Side Street) Drainage Plan and Profile Drawings (7 Mainline, 1 Side Street) Miscellaneous Design Details Temporary Erosion Control Plans 'Landscaping and Erosion Control Plans Pavement Marking Plans and Signing Plans Legend, Abbreviations, General Notes and Bills of Material Lighting Plans One Line Diagrams and Load Schedules Controller Details Light Pole and Foundation Details Electrical Details Roadway Cross Sections (every 100 feet and driveways) Specifications and Special Provisions 96 40 40 40 12 $ 60.00 $ 108.00 80 308 Sheets HrslSheet Man -hours 1 10 10 2 20 40 2 16 32 9 20 180 1 24 24 8 40 320 8 60 480 2 20 40 3 24 72 2 24 48 2 32 64 1 12 12 6 24 144 2 20 40 1 16 18 1 .,._. 16 16 2 24 48 10 20 200 60 $ 168.00 Direct Costs EXHIBIT A 127th Street Improvement (from Smith Road to State Street) VILLAGE OF LEMONT Storm Water Pollution Prevention Plan Engineering Cost Estimate Roadway Quantity and Design Calculations Lighting Calculations Drainage Quantity and Design Calculations Computer Ploting, Xerox Copies and Reproductions (See Exhibit E) 4. SERVICES BY OTHERS Sub -Total 63 40 40 60 40 60 2086 $3,507.00 $3,507.00 Ground Survey ( By W.C. Doland Engineering Associates Sub -Total Total Man -hours Weighted Payroll Rate Extension Direct Labor Multiplier 2574 $37.64 $96,877.24 2.80 Extension $271,256.27 In House cost $3,963.00 Cost by Others $20,000.00 Total Engineering Fee $295,21927 $20,000.00 $20,000.00 Exhibit B Average Hourly Payroll Rate McDonough Associates Inc. Payroll Classification Range from to 3 .• . `: i =.. Percent Weighted Participation Rate 11 - Civil Project Manager $ 46.00 $ 60.00 ," • _ 12% $6.60 12 - Civil Project Engineer $ 39.00 $ 56.00 30% $12.75 14 - Civil Engineer $ 19.00 $ 46.00 26% $8.76 21 - Structural Project Manager $ 46.00 $ 60.00 ..b. 22 - Structural Project Engineer $ 39.00 $ 56.00 24 - Structural Engineer $ 20.00 $ 46.00 1% $0.35 31 - Resident Engineer $ 34.00 $ 48.00 32 - Assistant Resident Engineer $ 24.00 $ 42.00 34 - Inspector $ 19.00 $ 38.00 38 - Surveyor $ 20.00 $ 36.00 8% $2.17 42 - Electrical Project Engineer $ 37.00 $ 56.00 �'" 4% $1.92 44 - Electrical Engineer $ 19.00 $ 46.00 v =: 3% $1.19 52 - Project Architect $ 36.00 $ 55.00 53 - Senior Architect $ 30.00 $ 50.00 54 - Architect $ 18.00 $ 45.00 71 - Environmental Project Manager $ 40.00 $ 57.00 72 - Environmental Project Engineer $ 34.00 $ 50.00 74 - Environmental Engineer $ 19.00 $ 45.00 92 - Technician / Drafter $ 16.00 $ 32.00 ,p - 15% 7 $3.70 94 - Clerical $ 11.00 $ 29.00 ' 1% $0.20 96 - Principal $ 60.00, 100% $37.64 S O m = O U S u m ° a 0 6 hibit A, F & G Element of Work w m i0 ✓ H 8$ O .9 = m o m m (0 W H 0 0 N N Ni N w w N CO n e M N NtO N w n w n H 78,510.46 1 $ N. n M 0 N n, Review and Coordlnta 0 0 2. Phase I Modification 3. Roadway - Contrac O N N Engineering Fee Exhibit D In -House Expenses McDonough Associates Inc. Auto Xerox Copies Blueline Printing Computer Plots Vellum Reproductions Mylar Reproductions Exhibit Board Preparation Exhibit Board Mounting Report Assembler (Fold, Protective Cover, Sort, Punch and Bind) SurveLCrew Snooper / Operator CheryPicker Shoulder Closure Railroad Flagman Film & Processing Video Recording $41.00/day $0.15/ea $0.15 /sgft $1.25 /sq_ ft $1.25/sq ft $2.50 /sq ft $15.00/sq ft $5.00 /sg_ ft $35.00 /report $250 /hour $1,800.00 /day $900.00 /day $350.00 /setup $400.00 /day $15.00/roll $10.00 /cartridge Rev. July 2002 Exhibit E In -House Direct Cost Detailed Breakdown McDonough Associates Inc. 127th Street Smith Street to State Street 1. Data Collection, Review and Coordination # Price Unit Extension Meeting Transportation 8 $ 36.00 each $288.00 Total $288.00 2. Phase I Modification and Update # Price Unit Extension Xerox Copies 50 $ 0.15 each $7.50 Blueline Printing 50 $ 0.15 sq. ft. $7.50 Computer Plots 36 $ 1.25 sq. ft. $45.00 Meetings Transportation 3 $ 36.00 each $108.00 Total $168.00 3. Contract Plan, Specification and Estimate Preliminary Submittal Xerox Copies 500 $ 0.15 each $75.00 Blueline Printing (40 Sheets, 20 Sets) 4800 $ 0.15 sq. ft. $720.00 Computer Plots (40 Sheets) 240 $ 1.25 sq. ft. $300.00 Sub -Total $1,095.00 Pre -Final Submittal Xerox Copies 250 $ 0.15 each $37.50 Blueline Printing (50 Sheets, 10 Sets) 3000 $ 0.15 sq. ft. $450.00 Computer Plots (50 Sheets) 300 $ 1.25 sq. ft. $375.00 Sub -Total $862.50 Final Submittal Xerox Copies 250 $ 0.15 each $37.50 Blueline Printing (63 Sheets, 10 Sets) 3780 $ 0.15 sq. ft. $567.00 Mylar Reproductions (63 Sheets) 378 $ 2.50 sq. ft. $945.00 Sub -Total $1,549.50 Total $3,507.00 Letting Fall 06' - Assuming ROW is Acquired -W.C. DOLAND ENGINEERING, INC. •t August 23, 2004 Mr. Earl Jandacek, P.E. McDonough Associates, Inc. 130 East Randolph Street Suite 1000 Chicago, Illinois 60601 RE: 127th Street in Lemont, Illinois (from State Street to Smith Street including 800' West and South from Smith Street intersection) (approximately 1.5 miles of roadway) Dear Mr. Jandacek, We are pleased to provide you with the following proposal for land surveying services for the above referenced project. PROPOSAL Topographic Mapping Phase We will perform the Topographic and existing conditions mapping of the above referenced roadways (approximately 1.5 miles) to serve as the base map for future roadway design. This plat will include all rim and invert elevations of utilities whenever available by field measurement and in addition utility company records which you furnish will also be utilized to create full utility documentation. Contours will be drawn at 1 foot intervals and will extend to 25 feet past the proposed right -of -way lines to adequately define drainage patterns. We will locate all improvements 25 feet beyond the proposed right of way to fully define the impact of roadway design on the adjacent parcels. This field location will include all existing pavement, side streets, driveways, sidewalks, curbs, ditches, inlets, catch basins, manholes, fire hydrants, valves and any other observable improvements. We will also provide all field measurement data necessary to document the cemetery boundary and grave sites located along the north and south sides of 127' Street to define the constraints posed the cemetery. This plat will be prepared in Microstation for ease of transition into design phase. The plat will be provided in hard copy and computer file format. Price: $20,000.00. Topography Schedule: We will work within your schedule to accommodate your time table. We anticipate that this topographic mapping phase will take approximately three weeks. Should you have.. questions regarding this matter, fed free to call me. Sincerely Jason Ddland, P.E., P.L.S. 509 EAST DUNDEE ROAD, PALATINE, ILLINOIS 60074 847.991.5088 • FAX 847.934.3427 • WWW.DOI.ANDENGINEERING.COM