Loading...
R-74-05 Authorizing Award Contract Cook Composite/ Ashland Chemical Water Main ExtensionRESOLUTION R- 7 . o6 RESOLUTION AUTHORIZING AWARD OF CONTRACT FOR THE COOK COMPOSITE / ASHLAND CHEMICAL WATER MAIN EXTENSION Main Street: Parker Road to Maley Road Maley Road: Main Street to Cook Composite Company WHEREAS, the Village of Lemont requires that the Cook Composite & Polymers / Ashland Distribution Water Main Extension project be completed; and WHEREAS, the Village seeks to utilize the construction firm of A Lamp Concrete Contractors, Inc. for such work; and WHEREAS, A Lamp Concrete Contractors, Inc. submitted a low bid for such work in the amount of $268,088.80. NOW, THEREFORE, BE IT RESOLVED, by the President and Board of Trustees that the Contract with A Lamp Concrete Contractors, Inc. is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DuPAGE, ILLINOIS, on this 12th day of October, 2005. Debby Blatzer Peter Coules Clifford Miklos Brian Reaves Ronald Stapleton Jeanette Virgilio AYES NAYS PASSED ABSENT Approved by me this 12th day of October, 2005. Attest: J CHARLENE SMOLLEN, Village Clerk CHARLENE SMOLLEN, Village Clerk JOHN ' PIAZZA, Vill . ge Approved as to form: JOHN ANTONOPOULOS, Village Attorney Date: , 2005 ident /4/ Civil Engineers/ Municipal Consultants 1+ank Novotny & Associates, Inc. 825 Midway Drive • Willowbrook, IL • 60527. Telephone' (630) 887-8640 4 Far (630) 887 -0132 September 12, 2005 Mr. Gary Holmes Administrator Village of Lemont 418 Main Street Lemont, Illinois 60439 Re: Cook Composite / Ashland Chemical Water Main Extension Main Street: Parker Road to Maley Road Maley Road: Main Street to Cook Composite Company Dear Gary: Listed below and on the attached "Bid Tabulation ", please find the results of the September 1, 2005 bid opening for the above - captioned project. Six (6) bids were received and tabulated, with no errors being found. A.Lamp Concrete Contractors $ 268,088.80 Riccio Construction Corp 284,834.50 George W. Kennedy Construction 305,631.50 J. Congdon Sewer Services 322,312.00 Unique Plumbing Company 327,176.00 Comstock Earthmoving, Inc. 397,112.50 Engineer's Estimate $ 239,416.00 These bids were received in an attempt to firm up the actual cost for this project. The bids have a 60 -day hold, giving us more time to finalize the Cog Hill and NiCor easements. (We already have received the IMTT easement.)Once we receive these easements, we will need firm commitments from Ashland Chemical and Cook Composite to fund the project, based upon the amounts indicated in the "Cost Distribution" sheet (attached). A recapture agreement will need to be passed that will ensure that the Village will receive funds from the D. Loniello Hussman Parcel at the northeast corner of Maley Road and Main Street, when it is developed. This recapture amount will be $79,686.67, plus interest, to be recaptured for the benefit of and shared by Cook Composite and Ashland Chemical. Mr. Gary Holmes Village of Lemont September 12, 2005 Page Two At this time, the qualifications of the lowest bidder are being checked. Once the easements are acquired, and the funds deposited to the Village, we will then recommend award of this Contract to the lowest responsible bidder. Should you have any questions conceming this matter, please do not hesitate to contact me. Very truly yours, FRAN .►.' VOTNY AND ASSOCIATES, INC. James . Cainkar, P.E., P.L.S. JLC /debi Enclosure cc: Mr. Dan Fielding, Director of Public Works, w /Enc. Mr. James Brown, Community Development Director, w /Enc. Mr. John Antonopoulos, Esq., w /Enc. Ashland Chemical Company, c/o Mr. Gary Brum, w /Enc. Cook Composite Company, c/o Ms. Marteen Nolan, w /Enc. IMTT Corporation, c/o Jim Durham, w /Enc. Project File No. 05171 COST DISTRIBUTION FOR THE COOK COMPOSITE / ASHLAND CHEMICAL WATER MAIN EXTENSION MAIN STREET: PARKER ROAD TO MALEY ROAD MALEY ROAD: MAIN STREET TO COOK COMPOSITE COMPANY Ashland Chemical Company Share 1/2 ($67,416.20) + 1/3 (137,935.70) = $ 79,686.67 Cook Composite Company Share 1/3 (137,935.70) + $58,447.10 = $104,425.66 D. Loniello Hussman Parcel Share (to be recaptured) 1/3 (137,935.70) + 1/2 ($67,416.20) = $ 79,686.67 Total $263,799.00 *Modified Scope Value Deposit Required Ashland Chemical 115% x [$79,686.67 + 1/2 ($79,686.67 *)] _ $137,459.51 Cook Composite 115% x [$104,425.66 + 1/2 ($79,686.67 *)] = $165,909.34 * Represents Loniello /Hussman share to be funded up front by Ashland Chemical and Cook Composite and recaptured later with interest, when Loniello /Hussman parcel is developed. Note: Construction costs allocated as follows: • Shared by Ashland Chemical, Cook Composite, and D. Loniello Hussman: Portion on Main Street, Parker Road to Maley Road. 1/3 each times $137,935.70. • Shared by Ashland Chemical and D. Loniello Hussman: Portion on Maley Road, Main Street to Maley Road bend. 1/2 each times $67,416.20 ■ Cook Composite only; Portion adjacent to Cook Composite. $58,447.10 Note: The above costs do not include any work on private property, such as service piping, backflow preventers, tap -on fees, etc. 05171 Cost Distribution O w TABULATION OF BIOS PROJECT NO: 05171 11. c°2 0 o gO 0 E. Fb°Fb m uuN 9 o 582 Comstock Earthmoving, Inc. 15W700 Frontage Rd., 8200 Burt Ridge, IL 80527 8% Bld Bond Unit^'^ t,MI Price Amount 38888 88888 88278 8R78R 88..f888 88888 888 12EI§ P,REE EMEAN EEEEE S8ogm Mao 88§ D NO o w y 1 O; n n o n f ry N N N r,NX,0 w01-WV < 20882 22222 882aa 8728' 88888 88828 888 2ra FF . -.-Fis SWOer( ipp N'SRA g' § °ra 8$8 - 2 8 n BS+. �mm n 1- Unique Plumbing Co. 5408 Weal 47th Street Brookfield, IL 60513 5%BId_Bond tEEnI O° e Yo Mt 88888 88888 88888 88888 88888 88888 88.8 E EEEEE RB1$1 IEsEI ? EE HERE IEE R 0 1x1 n NNN fC 2 ^G G NM.- ry 0G .- ON C C C OC tp -C OC C 88888 88888 88888 88888 8E888 88888 888 SS0 8 888 §1 SEALS, "n8E. N' ° °R ' °o1r' A §§ N 8 n 88x : -R 2:6 w °2m'� `r °O ;rd ry E 'ala . co4�meu nr0n EEgR$Sx a r888gg 8888Qp8Q 88888 RIM 8g8gQ8Q8585�� 5g5�88QQ88 88888 58Q888Q 88$88 13SSEi5 0iEm 71. 3manti 88rn� S8? 8888 888888 888888 88888 888888 88Q8 "' "' .- 88x° AR Geo. Kennedy Construction 690 Old Skokie Road Park City, IL 60086 5%Bid Bond Unl Price Amaunl 78.00 8 .288.00 84.00 80.900.00 87.00 87.435.00 530.00 21 .200... 80.00 t800.00 30.00 1.200.00 12.00 480... 28.00 1,820.00 1,450.00 1.450.00 1,700.00 2,400.00 2,100.00 2,100.00 2,300.00 4,600 .. 1,100.00 1,100." 1200.00 2,400.00 2.800.00 18.800.00 3.50 9.320.60 150.00 450.00 1,700.00 3,400.00 26.00 2,758.00 500.00 1.500.00 17.00 12,490.' 1.00 1.958... 76.00 28.825.00 15.00 750.00 25.00 8,20000 6.00 400.00 2.00 3,000.00 5,000.00 350.00 3.00 3,501.00 5.00 5,070.00 800.00 3,0000 , 1.500.00 1,500.,. 6,000.05 8,000..+ q w $wa8ryx 8 �8 Rlulo Conatrudbn Corp. P.O. Boa 872 Polo. Perk, IL 60484 5% Bid Bond 888g888p8 8888y8y8 8$8ry84q p8Q 888q Q888 X6wp+8888� gxs8888 888Q8 0111E EMI REIN MrEE EEEE°Y lEggg 2§I .0140 now N 0ny2 o nn( OfO_N 4 88888 88888 88888 88888 88888 88888 888 681 "all laalk 'W§ NNg82 mwr E0- ° = RK tam $: A.Lamp Conc. Contractors 800 West Irving Park Road Schaumburg, IL 60193 5% Bld Bond 88888 �r'qN 8*O8!80 88 881 8888 80O 88O8n 8 888N 88 88888 8f88 NNg1 4S R §pgg 8fCg 0(E* $fES)P 4O& 888.88 888$8g.8 888888 88888 8J88C881V 88888 888 l2 i w O 2 N agg om; En 88888 88888 88888 88888 8.8888 88p828 888 F11§si § §g §g 8�8�0 0EEnE 854$2 HEMS EE0 Eo ggo n. onn nom r .N N-Nr n t ow mom a 88888 88888 8q8 Q8Qg8q6 28 Q8Q8 Q8Q 88888 88888 p8 g8 ¢8 '4828 "218 NIU 8n, n8n3"Ei g-g2= *".1 6 EES .d BID OPENING: September 1.20056010:00 a.m. 8r8.R 88R N N_Nn N8n F0 R8 88CbR °"-^ a prpr�p Ep--I pr 1Q -�pp-xy yx �z�jjzz yx �pp-�xj �p w F z ON I R w 2 g g IIbH�$ olii ;N Nll " NMI ! ZAP ➢ FeL 1 bb bg i' {. $�� 1-2° wo .@'^ 2 w4 i WI' t�@ ��sll iE1�S1 gill 11111 a��� ga �8a iq ci C3 i i t w w ! i i 1 1 i l l 2 g Ili ! ial Iiiil illil it 144 4.2111 gal !MI w Totals: ?rror Corrections: Ei -Nnan ermrg. �:.2$.42 -grara2 n`awnn nHNnR nng