R-04-08 01/14/2008VILLAGE OF LEMONT RESOLUTION NO. R -O N - 6 RESOLUTION AUTHORIZING LETTER OF CREDIT REDUCTION FOR ASHBURY WOODS III SUBDIVISION ADOPTED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT This 14`" day of January, 2008. Published in pamphlet form by authority of the President and Board of Trustees of the Village of Lemont, Cook, Will and DuPage Counties, Illinois on this 14th day of January, 2008. RESOLUTION NO. IR 0 4- ®g RESOLUTION AUTHORIZING LETTER OF CREDIT REDUCTION FOR ASHBURY WOODS III SUBDIVISION WHEREAS, pursuant to the Subdivision Regulations, an owner or developer of a subdivision is required to deposit certain security or evidence thereof with the Village of Lemont to guarantee the installation of such improvements; and WHEREAS, in the matter of Ashbury Woods III subdivision, located west of Ashbury Woods Subdivision, an Irrevocable Letter of Credit #SBY/07/30414 from First American Bank in the amount of $976,253.54 was deposited with the Village of Lemont on September 10, 2007; and WHEREAS, Don Stevens, President of Donven Homes, has made application for a reduction of the Irrevocable Letter of Credit #SBY /07/30414; and WHEREAS, the Village Engineer has inspected certain portions of the improvement and has found these portions to have been satisfactorily installed, resulting in his recommendation of a reduction of $610,756.36 to a balance of $365,767.18. NOW, THEREFORE BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont that Letter of Credit #SBY/07/30414, for Ashbury Woods III Subdivision, is hereby reduced to $365,767.18 PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DU PAGE, ILLINOIS, on this 14th day of January, 2008. Debby Blatzer Peter Cowles Clifford Miklos Brian Reaves Ron Stapleton Jeanette Virgilio AYES NAYS PASSED ABSENT V S v V APPROVED by me this 14"' day of January, 2008. JOH F. PIAZZA, ilia: resident ATTEST: CHARLENE M. SMOLLEN, Village Clerk M;ROMMUNII'Y DE■ ELOPMENi DEPIWG• DEVELOPMENTTIU. Lat<a CreECnooB hb n}f.()C &dutd 2 Engineers: Municipal Consultants Nnnnk Novotny ct- Associates, Inc. 825 Midway Drii v 1Villowbrook, IL 0 60.5>7 7'I c+kphonr : (630) 887 -8640 <Far (630) 887- OI32 January 7, 2008 Mr. James Brown Community Development Director Village of Lemont 418 Main Street Lemont, Illinois 60439 Re: Ashbury Woods — Unit 3 Letter of Credit Reduction Dear Jim: Attached please find correspondence from Donven Homes and Asbury Woods Development, LLC., pertaining to a request for a reduction in the Letter of Credit for the above - captioned Subdivision. I have reviewed the attached and recommend the following balance be maintained in the Letter of Credit. Remaining Balance Maintenance Balance Provision $246,585.24 X 115% = $283,573.03 $821,941.48 X 10% = 82,194.15 Required L.O.C. Balance $365,767.18 Should you have any questions concerning this matter, please do not hesitate to contact me. Very truly yours, FRANK VOTNY & ASSOCIATES, INC. es L. Cainkar, P.E., P.L.S. JLC /debi Enclosure cc: Mr. Gary C. Holmes, Administrator, w /Enc. Mr. Dan Fielding, Director of Public Works, w /Enc. Project File No. 06232 [M106232 JBrown Letter of Credit Reduction 010708.doc] ASHBURY WOODS DEVELOPMENT, LLC. January 07, 2008 Mr. Jim Brown Community Development Director Village of Lemont 418 Main Street Lemont, Illinois 60439 Re: Reduction in Letter of Credit ASHBURY WOODS, Unit 3 Subdivision Dear Jim, Regarding our Letter of Credit renewal for ASHBURY WOODS, Unit 3, I am submitting the following: Copy of the Engineer's Estimate that the original Letter of Credit is based on, marked up to indicate the amounts for site work still remaining to be done. The unfinished work consists primarily of final surface course paving, parkway trees, streetlights, public walks and detention basin sod /walls. With the above site improvements remaining to be completed, we are requesting that the amended Letter of Credit be reduced from the original $976,523.54 to a new amount of $369,876.46. A copy of this letter as well cis the estimate reduction prepared by our engineer (IG Consulting) is also being sent to Jim Cainkar and Lynn Stratton for their use. 6428 Joliet Road • Countryside, IL 60525 • Phone 708.482.0860 • Fax 708.482.0860 page 2 of 2 Please review at your earliest convenience in order to approve the appropriate reduction for our amended Letter of Credit from First American Bank. Thank you for your cooperation. Very truly yours, ASHBURY WOODS Development, LLC Donald A. Stevens Member Cc: Jim Cainkar, Village Engineer Kevin Lewis, TG Consulting Lynn Stratton, Community Development • Consulting, Inc. ASHBURY WOODS LEMONT, ILLINOIS ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST :1 -37. • : : : P. . . . . 1.5" BITUMINOUS CONCRETE SURFACE COURSE 1.5" BITUMINOUS CONCRETE BINDER COURSE 6" BITUMINOUS AGGREGATE MIXTURE(MS 1500) 4" CA-6 BASE COURSE M 3-12 CURB AND GUTTER 5" PCC SIDEWALK Consulting Civil Engineers • Planners • Land Surveyors PROJECT NO: 5118 DATE: 07/1112007 Page 1 of 3 Revised for LOC reduction: 12/10/07 • :::::::: • . . • 4,097 S.Y. $3.92 516,060.24 $16,060.24 $2,409.04 $18,469.25 4,097 S.Y. 4.22 17,289.34 $0.00 $2,593.40 62,59340 4,097 S.Y. 11.75 45,139.75 $0.00 $7,220.96 $7,220.96 4,097 S.Y. 4.60 18,846.20 $0.00 $2,826.93 $2,826.93 2,723 L.F. 12.50 34,037.50 50.00 $5,105.63 $5,105.63 15,898 S.F. 3.00 47,694.00 547,694.00 $7,154.10 554,848.10 SUBTOTAL: $182,067.03 563,754.24 $27,310.05 591,064.29 2'41 • • SANITARY•SEWER •••• •.:: :•••:•: .•••:••• •• • • : 8" SDR 26 PVC SANITARY SEWER 48" SANITARY MANHOLE SANITARY 6" PVC SDR 26 SERVICE TRENCH BACKFILL CLEANOUT :•: : :WATER:MAIN :•: : : : : :•: :•: : : 8" DIP CL 52 WATER MAIN 1.5" TYPE K COPPER WATER SERVICE FIRE HYDRANT PRESSURE CONNECTION IN 60" VAULT 8" GATE VALVE IN 60" VAULT B-BOX TRENCH BACKFILL(SERVICE) TRENCH BACKFILL 1,697 L.F. $30.00 $50,910.00 $0.00 $7,636.50 $7,636,50 10 EA 1,800.00 18,000.00 50.00 $2,700.00 52,700.00 1,310 L.F. 20.00 26,200.00 60.00 $3,930.00 $3,930.00 670 L.F. 11.00 7,370.00 50.00 $1,105.50 51,105.50 39 EA. 150.00 5,850.00 $5,850.00 5877.50 $6,727.50 SUBTOTAL: $108,330.00 65,850.00 616,249.50 522,099.50 1,810 L.F. $25.00 $45,250.00 $0.00 $6,787.50 $6,787.50 2,284 L.F. 15,00 34,260.00 50.00 $5,139.00 $5,139.00 7 EA. 1,900.00 13,300.00 50.00 $1,995.00 $1,995.00 1 EA. 5,500.00 5,500_00 60_00 $825.00 5825.00 4 EA. 2,500.00 10,000.00 50.00 51,500.00 51,500.00 39 EA. 300.00 11,700.00 50.00 $1,755.00 $1,755.00 488 L.F. 11.00 5,368.00 50.00 $805.20 5805.20 864 L.F. 11,00 9,504.00 50.00 51,425.60 $1,425.60 SUBTOTAL: $134,882.00 50.00 $20,232.30 520,232.30 300 Marquardt Drive, Suite 101, Wheeling, IL 60090 847.215.1133 • e-mail: ia@iaconsultina net • F• A A7 91R 1177 ASHBURY WOODS LEMONT, ILLINOIS ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST ' STORM SEWER - ---- 24" INLET WITH GRATE 48" CATCH BASIN 60" CATCH BASIN W/RESTRICTOR 48" MANHOLE 12" FLARED END SECTION 15" FLARED END SECTION 18" FLARED END SECTION 21" FLARED END SECTION 24" FLARED END SECTION 12" RCP SEWER 15' RCP SEWER 18" RCP SEWER 21" RCP SEWER 12'' HDPE SEWER 15" HDPE SEWER 24" HDPE SEWER 6" SDR 26 PVC SEWER 10" SDR 26 PVC SEWER 6" PERFORATED UNDERDRAIN TRENCH BACKFILL PROJECT NO: 5118 DATE: 07/11/2007 Page 2 of 3 Revised for LOC reduction: 12/10/07 . --- ---- --- - .:.:-:':.:•:-:QTY:::::::•:::::::PNI.T::::::::PNO::::::*::-AMOUNT::::::::::::RP.ANNINP.:::::1§%:PO::::::::::!:.PP:B010::::: ---- -- 12 EA. - 5800.00 59,600.00 $0.00 $1,440.00 51,440.00 24 EA. 1,400.00 33,600.00 60.00 65,040.00 $5,040.00 3 EA. 2,295 00 6,885.00 $0.00 $1,032.75 $1,032.75 14 E.A. 1,300.00 18,200.00 60.00 62,730.00 52,730.00 2 EA. 750.00 1,500.00 60.00 $225.00 5225.00 3 EA. 850.00 2,550.00 60.00 $382.50 5382.50 1 EA. 950,00 950.00 60.00 614250 $142.50 1 EA 1,050.00 1,050.00 60.00 5157,50 6157.50 1 EA. 1,150.00 1,150.00 60.00 $172.50 $172.50 683 L.F. 21.00 14,343.00 50.00 $2,151.45 $2,151 45 378 L.F. 25.00 9,450.00 $0.00 51,417.50 61,417 50 172 L.F. 27.00 4,644.00 60.00 669660 5696 60 98 L.F. 29.00 2,842.00 60.00 5426.30 542630 1,287 L.F. 10.00 12,870.00 50.00 $1,930 50 61,930.50 465 L.F. 12.50 5,812.50 60.00 5871.88 6871.58 309 L.F. 24.00 7,416.00 60.00 51.112.40 $1,112.40 40 L.F. 15.10 644.00 $0.00 $96.60 596.60 413 L.F. 24.50 10,118.50 $0.00 $1,517.78 $1,517.78 551 L.F. 14.00 7,854.00 5000 $1,175.10 $1,178.10 556 L.F. 11.00 6,116.00 60.00 6917.40 6917.40 SOIL:ErkeistON STAKED SILT FENCE INLET PROTECTION FILTERS EROSION CONTROL BLANKET CONSTRUCTION ENTRANCE (12" STONE) RIP-RAP SUBTOTAL: 5157,595.00 $0.00 $23,639.25 523,639.25 OTY -UNIT. : : AMOUNT -REMAMING .:164".1.06 LoCiita-lance. 2301 L.F. 61.50 39 EA. 20.00 774 S.Y. 1.25 36.3 C.Y. 11.50 5 C.Y. 20,00 $3,451.50 760.00 967.50 417.45 120.00 SUBTOTAL: 55,736.45 50.00 $517.73 60.00 $117.00 $0.00 $145.13 50.00 $62.62 $0.00 618.00 $0.00 5860.47 $517.73 $117.00 $145,13 562.62 $18.00 $860.47 ASHBURY WOODS LEMONT, ILLINOIS ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST .... ... .................... ::6.0 : .. :EIGHTINGAND.SIGR: STREET LIGHTS • PROJECT NO: 5118 DATE: 07/11/2007 Page 3 of 3 Revised for LOC reduction: 12/10/07 - :QTYi:- UNIT . PRICE '.:AMOUNT :::::REMAINING 15 /0LOC : LOC Balance':> 4 EA. $3,500.00 $14,000.00 $14500.00 $2,100.00 $16,100.00 SUBTOTAL: 614,000.00 $14,000.00 $2,100.00 $16,100.00 QTY: • : : UNIT :• :PRICE: :AMOUNT . :: REMAINING 15 ✓.BLOC LOO Balance TOPSOIL STRIPPING TO STOCKPILE TOPSOIL RE- SPREAD FOR PONDS CLAY CUT /EXCAVATION TO STRUCT. FILL 11,500 C.Y. 62.50 2,000 C.Y. 1.25 6,900 C.Y. 4.00 8-0 LANDSCAPING SUBTOTAL: $28,750.00 2,500.00 27,600.00 60.00 $4,312.50 $4,312.50 $2,500.00 $375.00 $2,875.00 60.00 $4,140.00 64,140.00 $58,850.00 $2,500.00 $8,827.50 $11,327.50 AMOUNT:::: QTY ` UNtT � � PRIGE AMOUNT �: REMAINING 1$h:LOC LOO Balance PARKWAY TREES, 2 -1/2" DIA. DETENTION AREA SOD e -0 ? :: RETAINING WALLS: RETAINING WALL DESIGN & INSTALLATION G \IG\5151181COST ESTIMATEILOC REDUCTION.xis 45 EA. $400.00 618,000.00 618,000.00 62,700.00 $20.700.00 1,750 S.Y. 3.50 6,125.00 66,125.00 6918.75 $7,043.75 SUBTOTAL: 624,125,00 $24,125.00 $3,618.75 $27,743.75 ut,o- : AMOUNT QTY', UNIT P.RIOE AMOUNT REMAINING is%.LOC LOG Balance 6198 F.F $22.00 6136,356.00 $136,356.00 $20,453.40 5156,809.40 SUBTOTAL: 5136,356.00 $136,356.00 $20,453.40 6156,609.40 GRAND TOTAL $821,941.48 6246,585.24 123,291.22 $369,876.46 vs pFESS /pNI� Gary D. Pared gsk.' m 8205SB67L ' = a