Loading...
R-15-08 03/24/2008Illinois Department of Transportation BE IT RESOLVED, by the VILLAGE of (City, Town or Village) appropriated the sum of $174,000.00 SUPPLEMENTAL Resolution for Maintenance of Streets and Highways by Municipality Under the Illinois Highway Code MAYOR AND BOARD OF TRUSTEES of the (Council or President and Board of Trustees) LEMONT , Illinois, that there is hereby (Name) of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of the Illinois Highway Code from January 1, 2008 (Date) to December 31, 2008 (Date) BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department , a certified statement showing expenditures from and balances remaining in the account(s) for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at Schaumburg , Illinois. I, Charlene M. Smollen Clerk in and for the Village of Lemont , County of Cook, DuPage & Will (City, Town or Village) hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Mayor and Board of Trustees at a meeting on March 24, 2008 (Council or President and Board of Trustees) Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 24th day of March, 2008 (SEAL) Printed 3/11/2008 d A /Yt' 7 Cilrn/ Village Clerk (City, Town or Village) Approved Date Department of Transportation Regional Engineer Project # 08112 BLR 14230 (Rev. 11/06) Illinois Department of Transportation Period from 01/01/2008 to 12/01/2008 Municipal Estimate of Maintenance Costs Section Number 08 - 00000 - 00 - GM Municipality Village of Lemont Estimated Cost of Maintenance Operations Maintenance Operation (No. — Description) Group (1,u,w,iv) For Group I, II, or III (Material, Equipment or Labor) Operation Cost Item Unit Quantity Unit Price Cost B. Street Lighting II Luminaires, Poles & EAC 14 500 7,000.00 7,000.00 C. Pavement Striping IV Thermoplastic Pavement FEET 45,000 1.00 45,000.00 (Contract) D. Street Repairs II Bituminous Patching Mix TON 1000 3220 32,200.00 Stone and Sand TON 400 10.00 4,000.00 36,200.00 E. Traffic Signals II Maintenance EAC 6 1,300.0 7,800.00 7,800.00 F. Street Signs II Material L.SUM 1 8,000.0 8,000.00 8,000.00 G. Snow & Ice Control I Rock Salt, Bulk TON 2,000 35.00 70,000.00 (State Contract) ._ Total Day Labor Costs $59,000.00 .Yg Total Estimated Maintenance Operation Cost $174,000.00 Preliminary Engineering Engineering Inspection Material Testing Total Estimated Engineering Cost 0.00 Total Estimated Maintenance Cost $174,000.00 Submitted: By: March 24, 2008 Date Municipal Official (John F. Piazza) Page 1 of 1 Printed on 3/11/2008 3:22:26 PM Mayor Title Approved: Date Submit Four (4) Copies to Regional Engineer Regional Engineer BLR 14231 (Rev. 2/23/06) Project #08112