R-38-08 06/09/2008RESOLUTION R.-?j g D
RESOLUTION AUTHORIZING APPROVAL OF CHANGE ORDER #4
TO THE GMAX POLICE BUILDING CONTRACT WITH WIGHT FOR
CONSTRUCTION OF A SHARED PARKING LOT
WHEREAS, the Village of Lemont approved a design/build contract with Wight Construction for the
construction of its new Police Facility; and
WHEREAS, the contract with Wight Construction included a Guaranteed Maximum Price for the
scope of the contract; and
WHEREAS, the Village of Lemont requires an increase in scope to include the construction of a
shared parking lot on the St. Matthews property; and
WHEREAS, the construction of the shared parking lot was not included in the scope of the original
Guaranteed Maximum Price Contract but will be added as a change order to said contract;
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees that a Change
Order to the Guaranteed Maximum Price Contract with Wight Construction shall be authorized for $56,169.15.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COOK, WILL AND DU PAGE COUNTIES ILLINOIS on this
44-k Day of , 2008
Debby Blatzer
Peter Coules
Brian Reaves
Cliff Miklos
Ronald Stapleton
Jeanette Virgilio
Attest:
AYES
V
v
✓
NAYS PASSED ABSENT
JOHN F. ' i AZZA, Village Pr
ENE SMOLLEN, Village Clerk
DESIGN BUILDER CHANGE ORDER
VILLAGE OF LEMONT POLICE FACILITY
Village of Lemont
418 Main Street
Lemont, IL 60439
Design Builder's Project No.: 07- 5011 -03
TO: Wight Construction, Inc.
2500 N. Frontage Road
Darien, IL 60581
630 -969 -7000
You are hereby directed to make the following changes in the Contract:
WIGHT CONSTRUCTION, INC.
2500 N. Frontage Road
Darien, IL 60561
Design Build / Construction Management
DATE: 5/5/2008
Prepared By.
Approved By
CHANGE ORDER NUMBER: VOL-04
CONTRACT FOR: 004 -002 - Design Build Services
CONTRACT DATE: 3/3/2008
Item - Description Quantity Unit Price Net Amount
01 Increase scope to Include the construction of the shared parking lot on the St. Matthew
property and associated Design/CM Services
Grading 6 Excavation $ 6,900.00
Concrete $ 9,500.00
Asphalt $32,828.00
Sub Total Hard Cost 549,228.00
CM Fee 3.5%
NE Fee 7.6%
Contingency 3.0%
$ 1,722.98
$ 3,741.33
$ 1,476.84
Total 556,169.15
1.000 $56,169.15 $56,189.15
Total: $56,169.15
Not valid until signed by the Design Builder
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or contract time.
The original Contract Sum was:
Net change by previously authorized requests and changes:
The Contract Sum prior to this Change Order was:
The Contract Sum will be Increased by this Change Order:
The new Contract Sum including this Change Order will be:
The Contract Time will not be changed.
The Date of Substantial Completion as of this Change Order therefore is
$7,724,293.00
$50,219.98
$7,774,512.98
$56,169.15
$7,830,682.13
Authorized:
DESIGN BUILDER:
OWNER:
Wight Construction, Inc. Village of Lemont
2500 N. Frontage Road 418 Main et
Darien. IL 60561 Lemont ,,
NIIIIMIN
By:
Date:
f co_01 vight_dbco
By:
Date: