Loading...
R-39-08 06/09/2008RESOLUTION • 39 , os RESOLUTION AUTHORIZING APPROVAL OF A CHANGE ORDER #6 TO THE GMAX POLICE BUILDING CONTRACT WITH WIGHT FOR LOW VOLTAGE SERVICES: VOICE/DATA CABLING & EQUIPMENT WHEREAS, the Village of Lemont approved a design/build contract with Wight Construction for the construction of its new Police Facility; and WHEREAS, the contract with Wight Construction included a Guaranteed Maximum Price for the scope of the contract; and WHEREAS, the Village of Lemont requires low voltage services: Voice/Data Cabling & Equipment in conjunction with the Lemont Police Facility construction contract; and WHEREAS, these low voltage services were not included in the scope of the original Guaranteed Maximum Price Contract but will be added as a change order to said contract; NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees that a Change Order to the Guaranteed Maximum Price Contract with Wight Construction shall be authorized for $61,921.23. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COOK, WILL AND DU PAGE COUNTIES ILLINOIS on this Day of , 2008 Debby Blatzer Peter Coules Brian Reaves Cliff Miklos Ronald Stapleton Jeanette Virgilio Attest: AYES NAYS PASSED ABSENT v v V" CHARLENE SMOLLE , Village Clerk resident DESIGN BUILDER CHANGE ORDER VILLAGE OF LEMONT POLICE FACILITY Village of Lemont 418 Main Street Lemont, IL 60439 Design Builder's Project No.: 07- 5011 -03 TO: Wight Construction, Inc. 2500 N. Frontage Road Darien, IL 60561 630- 969 -7000 You ere hereby directed to make the following changes In the Contract: WIGHT CONSTRUCTION, INC. 2500 N. Frontage Road Darien, IL 60561 Design Build / Construction Management t4 / Prepared By: Approved By: `fib DATE: 5/5 /2008 CHANGE ORDER NUMBER: VOL -06 CONTRACT FOR: 004 -002 - Design Build Services CONTRACT DATE: 3/3/2008 Item Description 01 Increase scope to include technology wiring, devices and racks for phone, data, sound reinforcement, speakers and CATV and associated CM Services. Technology Sub Total Hard Cost CM Fee 3.5% NE Fee 0.0% Contingency 3.0% Total $58.142.00 $58,142.00 $ 2.034.97 $ 0.00 $ 1,744.26 $61.921.23 Quantity Unit Pride 1.000 $61,921.23 Total: $61,921.23 $61,921.23 Not valid until signed by the Design Builder Signature of the Contractor indicates his agreement herewith, Including any adjustment in the Contend Sum or contract time. The original Contract Sum was: Net change by previously authorized requests and changes: The Contract Sum prior to this Change Order was: The Contract Sum will be Increased by this Change Order: The new Contract Sum including this Change Order will be: The Contract Time will not be changed. The Date of Substantial Completion as of this Change Order therefore is $7,724,293.00 $107,972.14 $7,832,265.14 $61,921.23 $7,894,186.37 Authorized: DESIGN BUILDER: Wight Construction, Inc. 2500 N. Frontage Road Darien, IL 60561 By: Date: f_co_O1 wight_dbco OWNER: Village of Lemont 418 Main Street Lemont, IL 60439 By: Date: