Loading...
R-47-10 - Res. Accepting Change Order 1 Metra LotRESOLUTION X70 RESOLUTION ACCEPTING CHANGE ORDER NO. 1 METRA LEMONT COMMUTER STATION PARKING LOT REHABILITATION WHEREAS, the Village of Lemont has awarded a Contract to Construction Management Corp. of IL, for the Metra Lemont Commuter Station Parking Lot Rehabilitation project; WHEREAS, a Village -owned parking area along Main Street, east of the Metra lot, requires rehabilitation; WHEREAS, the additional work that is required was not contemplated at the time of the original Contract award; and NOW THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont that the Change Order No. 1, in the amount of $21,533.37 to Construction Management Corp. of IL, attached hereto is hereby approved. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DuPAGE, ILLINOIS, on this 26th day of July, 2010. Debby Blatzer Paul Chialdikas Clifford Miklos Rick Sniegowski Ronald Stapleton Jeanette Virgilio AYES NAYS PASSED ABSENT v v V Approved by me this 26th day of July, 2010. CHARLENE SMOLLEN, Village Clerk CHARLENE SMOLLEN, Village Clerk IAN K. REA S, age President Approved as to form: Daniel P. Blondin, Village Attorney Date: Date: Request No. Illinois Department of Transportation July 20, 2010 1 El Final Contractor: Construction Management Corp. Address: 5106 Walnut Avenue Downers Grove, IL 60515 addition I recommend that an nextension be made j3 to the above contract. deduction Request for Approval of Change in Plans Page 1 of 2 County Cook, DuPage & Will Road District or Municipality Village of Lemont Section Metra Parking Lot Rehabilitation Project No.: 10138 ❑from Between Station N/A and Station N/A a net length of (Do not fill in unless a change in length is Involved.) N/A The estimated quantities are shown below and the Contractor agrees to furnish the materials and do the work at the unit prices. Show station location for major items. Item No Description Awarded As Constructed Unit Quantity Amount Over Under Quantity Unit Price Additions Deductions 1 Bituminous Materials (Prime Coat) TON 5 $ 5.00 0.4 $1.00 $0.40 2 Aggregate (Prime Coat) TON 12 12.00 1 $1.00 $1.00 3 Leveling Binder (Machine Method), 3/4" TON 448 37,475.20 42 $83.65 $3,513.30 4 Hot -Mix Asphalt Surface Course, Mix "C ", N50, 1 1/2" TON 899 65,627.00 $73.00 5 Hot -Mix Asphalt Surface Removal - Butt Joint SQ YD 35 350.00 $10.00 6 Protective Coat SQ YD 10 50.00 $5.00 7 Hot -Mix Asphalt Surface Removal, 2 1/4" SQ YD 3568 9,990.40 $2.80 8 Hot -Mik Asphalt Surface Removal (Variable Depth), 0" to 2 -1/4" SQ YD 2468 5,676.40 $2.30 9 Combination Curb and Gutter Removal FOOT 35 175.00 $5.00 10 Combination Concrete Curb & Gutter, B -6.12 FOOT 35 1,575.00 $45.00 11 Class D Patches, Type III, 6 Inch SQ YD 150 5,400.00 16 $36.00 $576.00 12 Class D Patches, Type IV, 6 Inch SQ YD 60 2,160.00 $36.00 13 Area Reflective Crack Control Treatment, System A SQ YD 10645 19,693.25 982 $1.85 $1,816.70 14 Catch Basins To Be Adjusted EACH 8 2,400.00 $300.00 15 Manholes To Be Adjusted EACH 11 3,300.00 $300.00 16 Thermoplastic Pavement Marking - Letters And Symbols SQ FT 48 343.20 33 $7.15 $235.95 17 Thermoplastic Pavement Marking - Line 4" FOOT 6533 10,322.14 449 $1.58 $709.42 18 Parking Stall Number Stenciling EACH 34 205.70 $6.05 19 Sign Panel SQ FT 3.5 35.00 $10.00 20 Metal Post - Type B FOOT 12 120.00 $10.00 21 Topsoil Furnish And Place, 4" SQ YD 14 14.00 $1.00 22 Sodding SQ YD 14 280.00 $20.00 23 Changeable Message Sign CAL MO 2 1,550.00 $775.00 24 Railroad Protective Liability Policy L SUM 1 2,500.00 $2,500.00 25 Insurance Provisions - Complete L SUM 1 250.00 $250.00 "'Approved Additional Items, Per CO #1 °° Hot -Mix Asphalt Surface Course, Mix "C ", N50, 1 3/4° TON 97 $73.00 $7,081.00 Hot -Mix Asphalt Surface Removal, 2 1/2" SQ YD 982 $2.80 $2,749.60 Curb Removal FOOT 15 $10.00 $150.00 Parking Bumpers, Remove and Reset EACH 24 $100.00 $2,400.00 Concrete Parking Bumper Stops EACH 2 $150.00 $300.00 Miscellaneous & Contingency L SUM 1 $2,000.00 $2,000.00 $ 169,509.29 Totals: $ 21,533.37 $ - Total net addition to date $ 21,533.37 which is 12.70% of Contract price. Net Change: $ 21,533.37 $ - Amount of original Contract: Amount of previously adjusted Contract: Amount of ajdusted /final Contract: addition $ 169,509.29 $ 191,042.66 Total net I 1 deduction to date: $ 21,533.37 which is 12.70% of Contract Price State fully the nature and reason for the change: This addition includes the rehabilitation of the west lot on Main Street, east of the Metra lot. When the net increase or decrease in the cost of the contract is $10,000 or more or the time of completion is increased or decreased by 30 days or more, one of the following statements shall be checked. Note: XX The undersigned determine that the circumstances which necessitate this change were not reasonably foreseeable at the time the contract was signed. The undersigned determine that the circumstances which necessitate this change were not within the contemplation of the contract as signed. The undersigned determine that this change is in the best interest of the local agency and is authorized by law. Signed: Signed: VI E OF LEMO Page 2 of 2 Make out separate form for change in length quantities. Give net quantities only. Submit 3 copies of this form to District Engineer (4 copies for road district) If plans are required attach 3 sets. Municipal Officer Brian K. Reaves, Village President Title of Municipal Officer July 26, 2010 Date CONSTRUCTION MANAGEMENT CORP. OF IL Date BLR 13210 (Rev. 7/05)