R-89-26 Authorizing a Professional Engineering Services Agreement with H.W. Lochner, Inc. for the Walker Road Extension / Rail Safety Improvement Project1 \ 3 9 t z� 418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: George Schafer, Administration THROUGH: SUBJECT: A Resolution Authorizing a Professional Engineering Services Agreement with H.W. Lochner, Inc. for the Walker Road Extension / Rail Safety Improvement Project DATE: October 26, 2026 SUMMARY/BACKGROUND The Village of Lemont has been working toward the extension of Walker Road and improvements to railroad crossing safety for several years. The project is intended to improve access to existing and future commercial development while addressing safety concerns associated with the existing private at -grade railroad crossings at Boyer Street and McGuire Parkway. On July 27, 2020, the Village Board approved Resolution R-31-20, authorizing a Phase Engineering Agreement with Knight Engineering and Architects, Inc. The initial engineering work included preliminary studies, environmental assessments, and evaluation of alternatives for extending Walker Road across the Canadian National Railroad corridor. Although preliminary engineering activities were initiated, the project experienced delays related to agency coordination, project development requirements, and funding considerations. During this period, the Village continued to pursue additional funding opportunities to advance the project. On February 18, 2026, the Village was awarded a $500,000 grant through the Federal Railroad Administration's (FRA) Consolidated Rail Infrastructure and Safety Improvements (CRISI) Program. The grant, along with the Village's required matching contribution, will support continued project planning, environmental review, and preliminary engineering activities. In May 2025, the Village issued a Request for Proposals for planning and design engineering services. Following a qualifications -based selection process, H.W. Lochner, Inc. was identified as the highest -rated firm. The proposed professional engineering services agreement identifies the following tasks: 1. Task 1 — Project Administration and Management: Project administration and coordination with federal, state, and local agencies, railroad representatives, and other stakeholders. 2. Task 2 — Project Planning: Evaluation of existing conditions, traffic and railroad operations, development and analysis of improvement alternatives, and preparation of a project planning package. 3. Task 3 — Environmental Review: Completion of environmental studies and documentation required under the National Environmental Policy Act (NEPA), including coordination with the FRA and other regulatory agencies. 4. Task 4 — Preliminary Engineering: Development of preliminary engineering plans for the preferred improvement alternative, including roadway and railroad crossing design considerations, drainage evaluations, and preliminary construction cost estimates. 5. Task 5 — Quality Assurance/Quality Control (QA/QC): Quality assurance and quality control reviews of project deliverables to ensure compliance with applicable engineering standards and project requirements. The FRA approved the project's Project Management Plan on September 21, 2026, allowing the Village to proceed with the next phase of project activities. The proposed agreement with H.W. Lochner, Inc. is for an amount not to exceed $435,000 for Tasks 1 through 3, with quality assurance and quality control activities incorporated throughout the project. Task 4, Preliminary Engineering, will be addressed through a future supplemental agreement once the preferred improvement alternative has been identified and the scope of engineering services finalized. The total project expenditures are anticipated to remain within the approved grant project budget of $625,000. The current FRA CRISI grant performance period extends through October 31, 2027. The Village also anticipates utilizing future Surface Transportation Program (STP) funding to continue engineering activities beyond the CRISI-funded phase. Approval of the proposed agreement will allow the Village to advance the project, utilize available federal grant funding, and continue working toward a long-term solution to improve railroad crossing safety and roadway connectivity. The total project budget is $625,000, consisting of $500,000 in federal funding through the FRA CRISI Program and a $125,000 Village matching contribution. The proposed professional engineering services agreement with H.W. Lochner, Inc. is for an amount not to exceed $435,000 for Tasks 1 through 3, including associated quality assurance and quality control activities. Task 4, Preliminary Engineering, will be addressed through a future supplemental agreement once the preferred improvement alternative has been identified and the scope of services finalized. The remaining project budget of $190,000 is available for this phase, with total project expenditures anticipated to remain within the $625,000 grant project budget. ANALYSIS Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Staff recommends approval of the attached Resolution and agreement BOARD ACTION REQUESTED Motion to approve Resolution ATTACHMENTS Resolution Authorizing HW Lochner for Walker extension.pdf WalkerRd_Proposal HW Lochner.pdf VILLAGE OF LEMONT RESOLUTION NO. g 5q'-ZP A Resolution Authorizing a Professional Engineering Services Agreement with H.W. Lochner, Inc. for the Walker Road Extension / Rail Safety Improvement Project ADOPTED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT THIS 26th DAY OF OCTOBER 2026 Published in pamphlet form by authority of the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois on this 26th day of October 2026 \ r RESOLUTION NO. A Resolution Authorizing a Professional Engineering Services Agreement with H.W. Lochner, Inc. for the Walker Road Extension / Rail Safety Improvement Project WHEREAS, the Village of Lemont (the "Village") is an Illinois municipal corporation organized and operating under the laws of the State of Illinois; and WHEREAS, the Village has identified the Walker Road Extension / Rail Safety Improvement Project (the "Project") as an important infrastructure improvement intended to enhance roadway connectivity, improve access to existing and future commercial development, and address safety concerns associated with the existing private at -grade railroad crossings at Boyer Street and McGuire Parkway; and WHEREAS, the total grant project budget is $625,000, consisting of $500,000 in federal grant funding and a required Village matching contribution of $125,000; and WHEREAS, the Village issued a Request for Proposals for professional planning and design engineering services, and following a qualifications -based selection process, H.W. Lochner, Inc. was identified as the highest -rated firm; and WHEREAS, H.W. Lochner, Inc. has submitted a Professional Engineering Services Agreement for the Project, which identifies project administration and management, project planning, environmental review, preliminary engineering, and quality assurance/quality control services; and WHEREAS, the proposed agreement establishes compensation in an amount not to exceed $435,000 for Tasks 1 through 3, including associated quality assurance and quality control activities; and WHEREAS, Task 4, Preliminary Engineering, will be further defined following identification of the preferred improvement alternative and will be subject to a future supplemental agreement and separate authorization, with total planned project expenditures remaining within the $625,000 grant project budget; and WHEREAS, the President and Board of Trustees have determined that approval of the proposed Professional Engineering Services Agreement with H.W. Lochner, Inc. is in the best interests of the Village and will further the Village's efforts to improve transportation infrastructure and railroad crossing safety. NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COOK, DUPAGE, AND WILL COUNTIES, ILLINOIS, AS FOLLOWS: SECTION 1: RECITALS The foregoing recitals are hereby incorporated into this Resolution as if fully set forth herein. SECTION 2: APPROVAL OF AGREEMENT The President and Board of Trustees hereby approve the Professional Engineering Services Agreement between the Village of Lemont and H.W. Lochner, Inc. for the Walker Road Extension / Rail Safety Improvement Project, substantially in the form attached hereto as Exhibit A, in an amount not to exceed Four Hundred Thirty -Five Thousand Dollars ($435,000). SECTION 3: AUTHORIZATION TO EXECUTE The Village President or his designee is hereby authorized and directed to execute and attest, respectively, the Professional Engineering Services Agreement with H.W. Lochner, Inc., together with any documents necessary to effectuate the intent of this Resolution, subject to review and approval as to form by the Village Attorney. SECTION 4: SUPPLEMENTAL ENGINEERING SERVICES The professional engineering services authorized under this Resolution are limited to the current agreement amount of $435,000. Additional services associated with Task 4, Preliminary Engineering, shall be subject to a future supplemental agreement and approval by the President and Board of Trustees. No additional compensation beyond the amount authorized herein shall be incurred without the required approval. SECTION 5: EFFECTIVE DATE This Resolution shall be in frill force and effect immediately upon its passage and approval as provided by law. ADOPTED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL AND DUPAGE, ILLINOIS on this 26th DAY OF OCTOBER 2026. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYS: ABSENT: ABSTAIN: Samuel J. Forzley V Janelle Kittridge� Ken McClafferty V Kevin Shaughnessy Rick Sniegowski Ron Stapleton Attest: Charlene M. Srof enj Village Clerk �0(Ep4,,, C? 7 4 John Egofske, i lage President EXHIBIT A cf- Lochner CONSULTANT AGREEMENT Owner: Village of Lemont, Illinois Client: Village of Lemont Consultant: H.W. Lochner, Inc. ("Lochner") 225 W. Washington St. Chicago, IL 60606 Date: May 27th, 2026 Project: Walker Road Rail Safety Improvement Project Lochner and the Client (collectively, the "Parties" and individually, a "Party") agree as follows 1. Agreement. This Agreement is a contract between Lochner and the Client for Lochner to perform consulting, engineering, and/or design services on the Project. 2. Lochner. Lochner is the Client's Consultant for the services listed in this Agreement which Lochner is contracting to provide for the Project, and Lochner shall facilitate the exchange of information between or among Lochner and the Client, Lochner and other consultants retained by the Client, and Lochner and other consultants that Lochner may have retained for the Project. All communications between Lochner and the Client shall be through Lochner unless the Client authorizes otherwise. Lochner represents that it is a properly licensed engineering firm and is registered to practice its profession and to conduct business in the State of Illinois. 3. Scope of Services. Lochner shall perform the services set forth in Attachment A Scope of Work/Services, as awarded herein (the "Services"). 4. Compensation. Client shall compensate Engineer for professional services rendered under this Agreement on a direct labor multiplier basis. Engineer's fee shall be calculated by multiplying the Direct Labor Cost by the agreed -upon Multiplier, as set forth herein. For purposes of this Agreement, "Direct Labor Cost" means the actual hourly wages or salaries paid to Engineer's personnel for time directly devoted to the performance of services under this Agreement, exclusive of bonuses, overtime premiums (unless expressly authorized in writing by Client), employer -paid taxes, insurance, retirement contributions, and other fringe benefits. "Multiplier" means a factor of [3.01, which is applied to the Direct Labor Cost to account for overhead, general and administrative expenses, and profit. Reimbursable Expenses - In addition to the fee described above, Client shall reimburse Engineer for Reimbursable Expenses incurred in connection with the performance of services. "Reimbursable Expenses" include, but are not limited to, the following: travel and subsistence costs; reproduction and printing costs; postage, overnight delivery, and courier charges; permit and filing fees; specialized software or equipment rental charges; fees of subconsultants and subcontractors; and any other out-of-pocket expenditures approved in advance by Client. Maximum Compensation - Total compensation under this Agreement shall not exceed $435,000 unless increased by written amendment executed by both parties. cf- Lochner 5. Schedule. Lochner shall perform its Services within a timeframe mutually agreed to by Lochner and the Client as specified in Attachment B. Lochner shall strive to cooperate with and to coordinate its Services with the activities of all other parties to the Project, including other consultants retained by the Client. 6. Additional Services. If the Client requests Lochner to perform services that Lochner believes to be in addition to the Services specified in Section 3 of this Agreement, and for which Lochner believes it is entitled to additional time or additional compensation, before commencing with any Additional Services Lochner shall submit a written cost estimate and revised schedule in accordance with Section 15 of this Agreement. Lochner shall not commence with any Additional Services without written authorization by the Client. 7. Standard of Care. The standard of care applicable to Lochner's Scope of Services shall be the degree of skill and care normally employed by professionals engaged to perform services similar to the Services required herein at the same time and in the same geographic area as the performance of Services hereunder and on projects similar in size and scope to the Project. In the event a standard of care is prescribed by statute, such statutory formulation shall be the Standard of Care. 8. Payment. Lochner shall send invoices to the Client at monthly intervals. Payment will be made to Lochner for invoiced Services not more than thirty (30) days following submittal of invoice to the Client. 9. Correction of Work. Lochner shall correct any Services that fail to conform to the Standard of Care set forth in Section 7 of this Agreement at Lochner's own expense. 10. Termination. Lochner may terminate this Agreement upon five (5) days written notice if the Client breaches any term of this Agreement. The Client may terminate this Agreement upon seven (7) days written notice without cause for the Client's own convenience. If this Agreement is terminated by Lochner for the Client's breach, the Client shall be liable to Lochner for all costs and expenses that Lochner incurred prior to the termination as a result of the Client's breach. If this Agreement is terminated by the Client for its convenience, Client shall be liable to Lochner for all costs and expenses that Lochner incurred prior to the termination. 11. Insurance. Lochner will provide and maintain the following policies of insurance under the terms and conditions set forth below: 1. Professional Liability Insurance retroactive to the date of commencement of Lochner's services in relation to the Project with a per claim and aggregate limit in the amount of the greater of $1.0 million. This policy shall be maintained in effect for a period of one (1) year after completion of all Lochner's Services hereunder. 2. Commercial General Liability ("CGL") Insurance in the amount of $1.0 million per occurrence, $1.0 million aggregate limit, and $1.0 million products and completed operations aggregate limit. In addition to the coverage provided by the Commercial General Liability Insurance, if not already included in such coverage, such insurance shall also provide coverage for personal injury, bodily injury, property damage, products -completed operations (for a minimum of five (5) years after completion of work) and broad form contractual liability. 3. Comprehensive Automobile Liability ("Auto") Insurance in the amount of $1.0 million per occurrence, and $1.0 million aggregate limit. In addition to the coverage provided by the Comprehensive Automobile Liability Insurance, if not already included in such coverage, such insurance shall also provide coverage for personal injury, bodily injury and property damage arising out of owned, hired, leased and non -owned vehicles, automobiles, trucks and trailers. 2 J:1 Lochner 4. Workmen's Compensation Insurance in the amount of the statutory maximum, if there is one, and if there is no statutory maximum, in the amount of $1.0 million and Employer's Liability Insurance of at least $1.0 million. 5. Umbrella Excess Liability Insurance in the minimum amount of $3.0 million each occurrence, and $3.0 million aggregate limit. The Umbrella Excess Liability Insurance shall be written on an umbrella excess basis over, and shall follow form to, the Commercial General Liability Insurance policy, the Comprehensive Automobile Liability Insurance policy, and the Employer's Liability Insurance policy. The Umbrella Excess Liability Insurance policy shall be endorsed to provide defense coverage obligations. Lochner will include coverage for its subcontractors in its policies or obtain from each subcontractor equivalent insurance as required of Lochner hereunder. The provisions of Section 11 shall apply equally to Lochner's subcontractors as they do to Lochner. All insurance policies will be endorsed to provide that the insurance company will give the Client at least thirty (30) days written notice of cancellation or material change prior to such cancellation or modification. Prior to commencement of Lochner's Scope of Services hereunder, Lochner shall provide the Client with certificates of insurance evidencing the requirements set forth herein. 12. Indemnification. Lochner agrees to indemnify the Client and its officers, directors, members, managers, employees and assigns (the "Indemnitees") from and against liability, claims, damages, losses and expenses (including, but not limited to, reasonable attorneys' fees, expert witness costs, other litigation costs, judgments, settlements and economic losses) (collectively the "Losses" and individually, a "Loss") arising out of or resulting from negligent performance of any Services or duties under this Agreement by Lochner, its subcontractors, lower -subcontractors, or agents of any tier or their respective employees provided, however, that in the event of a Loss arising out of damages to persons or property, the foregoing obligation (1) shall not require Lochner to indemnify any Indemnitee for Losses other than to the extent caused by the act, omission or default of Lochner, its contractors, subcontractors, lower -subcontractors, materialmen, or agents of any tier or their respective employees, where such is prohibited by law, and (2) shall not require Lochner to indemnify any Indemnitee for Losses caused in whole or in part by any act, omission, or default of the Indemnitee, where such is prohibited by law. If the obligation to indemnify set forth in this Section is broader than that allowed by applicable law, this Section should be interpreted as providing the broadest indemnification obligation permitted and should be limited only to the extent necessary to comply with that law. Lochner shall reimburse the Client for its reasonable attorneys' fees, expert witness costs and other litigation costs to enforce Section 12 and shall survive the termination or full performance of this Agreement by either or both Lochner and/or the Client. Section 12 is to be read separately and independently of Section 11 and the additional insured obligations therein contained. 13. Waiver of Immunity. In claims against any person or entity indemnified under Section 12 by an employee of Lochner, a subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable (a "Claimant"), the indemnification obligation under Section 12 shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Claimant's employer under workers' compensation acts, disability benefit acts or other employee benefit acts. 14. Ownership of Documents. If the Agreement requires that any of the Client's documents, drawings, plans, specifications, or other work product are, or shall become, the property of another person, Lochner shall, at the Client's request, assign all rights of ownership of any like document prepared by Lochner to the same person. M (fp- Lochner 15. Changes. Client may, by written direction only, make changes, revisions, additions, or deletions (collectively called "changes") to this Agreement. Any claim by Lochner for an adjustment under this paragraph must be asserted in writing fully supported by factual documentation to the Client, within fifteen (15) calendar days from the date of receipt by Lochner of the written change order from the Client, or within such extension of this period as Client, in its sole discretion, may grant in writing at Lochner's request prior to expiration of said period. Claims arising under this Agreement shall be decided in the state or federal courts located in Illinois. 16. Confidentiality. Lochner acknowledges, that as part of Lochner's relationship with the Client, it will have access to information that is not publicly available ("Confidential Information"). Lochner agrees that it will maintain strict confidentiality with respect to such Confidential Information and will not, directly, or indirectly, disseminate it or use it for any purpose unrelated to Lochner's obligations under this Agreement. Lochner shall not, without the prior written consent of the Client, make any public statement, announcement or release concerning the Project or the Confidential Information to trade publications, the press, or any other individual, corporation, partnership, or entity except as may be necessary to comply with the requirements of any applicable law, governmental order or regulation. In the event Lochner believes it is required to disclose any Confidential Information in order to comply with any applicable law, governmental order or regulation, Lochner shall promptly notify the Client of same with sufficient time to allow the Client to object or otherwise take actions to prevent the disclosure of such Confidential Information. 17. Quality Control/Quality Assurance. Lochner shall perform Quality Control/Quality Assurance (QC/QA) commensurate with the Standard of Care throughout the provision of all Services by Lochner pursuant to the terms of this Agreement. 18. Miscellaneous Provisions. 1. Assignment. Lochner shall not assign this Agreement or the benefits arising therefrom without the prior written consent of the Client. 2. Integration. This Agreement represents the entire and integrated Agreement between Lochner and the Client and supersedes all prior negotiations, representations or agreements, either written or oral. 3. Third Parties. There are no third -party beneficiaries to this Agreement other than as expressly indicated in Section 11 (Insurance) and Section 12 (Indemnification). 4. Invalidity. In the event any provision or part of a provision of this Agreement is found invalid by a tribunal of competent jurisdiction, (i) the other provisions or parts of the provision of this Agreement shall remain in full force and effect notwithstanding such finding, and (ii) the Agreement shall be interpreted to, as closely as possible, effectuate the purpose the original Agreement language. 5. Mutually Negotiated. The Parties acknowledge that the terms and conditions of this Agreement have been the subject of mutual negotiation, and that this Agreement shall be construed as if drafted jointly by the Parties and no presumption or burden of proof shall arise favoring or disfavoring any Party by virtue of the authorship of any provision of this Agreement. 6. Survival. Notwithstanding anything herein to the contrary, the provisions of this Agreement providing for limitation of or protection against liabilities between the Parties, shall survive termination of the Agreement and/or completion of the Services hereunder. 7. Limitation of Liability. Lochner's liability for any claim or breach of Standard of Care shall be limited to the amount of its Compensation as defined in Section 4. H cf— Lochner 8. Notices. Unless otherwise provided herein, all notices, requests, consents, approvals, demands and other communications to be given hereunder shall be in writing and shall be deemed given upon (a) the date of delivery when hand delivered to the respective Parties as set forth below, or (b) actual receipt as evidenced by proof of delivery by a national courier service or the United States Postal Service, addressed to the respective Parties at the following addresses: Notice to Lochner: Jason Moller Project Principal H. W. Lochner, Inc. 225 W. Washinton St. 12t" Floor Chicago, Illinois 60606 Notice to Client: Mr. George Schafer Village Administrator Village of Lemont, IL 418 Main Street, Lemont, IL 60439 9. Mutual Waiver of Consequential Damages. In no event shall either Party, their members, managers, affiliates, officers, directors, employees, agents, or shareholders be liable to the other Party for any special, incidental or consequential damages, direct or indirect, including, but not limited to, lost revenue, lost profits, financing costs, overhead, penalties, fines, liquidated damages and lost opportunities, whether incurred by a Party or by third parties to that Party may be liable, whether sounding in breach of contract, warranty, tort (including negligence), strict or statutory liability or otherwise, arising from or relating to the Services under this Agreement. 10. Electronically Produced Documents. Electronically produced documents will be submitted in data files compatible with AutoCAD Release 2020. Lochner makes no warranty as to the compatibility of the data files beyond the above specified hardware and release or version of the stated software. Because data stored on electronic media can deteriorate undetected or be modified without Lochner's knowledge, the electronic data files submitted to the Sponsor or other Agencies will have an acceptance period of thirty (30) days. If during that period the Sponsor or other Agencies find any errors or omissions in the files, Lochner will correct the errors or omissions as a part of the basic Agreement. Lochner will not be responsible for maintaining copies of the submitted electronic data files after the acceptance period. 11. Engineer's Opinion of Probable Project Cost and Construction Cost. Since Lochner has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractor(s) methods of determining prices, or over competitive bidding or market conditions, Lochner's opinions of probable Project Cost and Construction Cost provided for herein are to be made on the basis of Lochner's experience and qualifications and represent its best judgment as an experienced and qualified professional engineer, familiar with the construction industry; but Lochner cannot and does not guarantee that proposals, bids or actual Project or Construction Cost will not vary from opinions of probable cost prepared by Lochner. However, Lochner represents that it will use reasonable engineering care and judgment commonly exercised by an engineer in the same or similar circumstances in making and transmitting such cost estimates to the Client. 5 Cf- Lochner 12. Force Majeure. Any delay or failure of Lochner in the performance of its required obligations hereunder shall be excused if and to the extent caused by acts of God, war, riot, strike, fire, storm, flood, windstorm, discovery or uncovering of hazardous or toxic materials or causes beyond the reasonable control of Lochner, provided that prompt written notice of such delay or suspension be given by Lochner to the Client. Upon receipt of said notice, if necessary, the time for performing shall be extended for a period of time reasonably necessary to overcome the effect of such delays and Lochner shall be reimbursed for the cost of such delays. 13. Client's Responsibilities. a. Arrange for access to and make all provisions for Lochner to enter upon public and private property as required for it to perform his/her services. b. Assist in approvals and permits from all governmental entities having jurisdiction over the project and such approvals and consents from others as may be necessary for completion of the project. c. Designate in writing a person to act as Client representative with respect to the services to be rendered under this Agreement. Such person shall have complete authority to transmit instructions, receive information, and interpret and define Sponsor policies and decisions. d. Give prompt written notice to Lochner whenever Client observes or knows of any development that affects the scope or timing of Lochner's services. e. Pay publishing cost for advertisements of notices, public hearings, request for bids, and other similar items. The Sponsor shall pay for all permits and licenses that may be required by local, state or federal authorities; and shall secure the necessary land, easements and rights -of -way required for the project. f. Available information relating to environmental conditions at the property, including any permits, clearances, investigations, and remediation required for federal, state, and local agencies identified by environmental consultants for the Sponsor in currently available reports. H.W. LOCHNER, INC. Jason A. Moller ti By:' US Transportation Title: —Planning Practice Leader Date: 05-27-2026 Attachments VILLAGE OF LEMONT Title: Date: 10 �� -lu 0 Cf- Lochner Attachment A Scope of Work/Services Attachment B Project Schedule Attachment C Workhours (fp- Lochner Attachment A Scope of Work/Services (f'- Lochner Scope of Work/Services Project Overview Lochner ("CONSULTANT') professional services will focus on a planning study and subsequent preliminary engineering activities for a new Walker Road Extension that will study alternatives to cross over or meet at grade the Heritage High -Speed Corridor, coupled with the removal of the existing McGuire Parkway and Boyer Street private at -grade crossings. A proposed Project Action will be identified based on the evaluations conducted and a full NEPA review will be carried out. Following alternative review and NEPA approval, preliminary engineering for a preferred alternative will be performed. This project is partially funded through a Consolidated Rail Infrastructure and Safety Improvements (CRISI) Program grant for the "Village of Lemont Rail Safety Improvement Project" (the Project). This is a non -Major Project as that term is defined in FRA Guidance on Development and Implementation of Railroad Capital Projects, January 11, 2023 (Railroad Capital Projects Guidance). Work under this contract will be performed in general accordance with the USDOT Grant. The Project is located in the Village of Lemont (Village) and Lemont Township, Illinois and will extend Walker Road across Canadian National (IC) Heritage High-speed Corridor to provide safe access to existing and proposed commercial development. Boyer Street and McGuire Parkway are identified by DOT/AAR Crossing Numbers 289731 G and 309452U, respectively. Boyer Street is under the jurisdiction of Lemont Township from Main Street to the rail crossing. McGuire Parkway is entirely a private roadway. Both at grade rail crossings are private and under private agreement with Canadian National (CN). Properties served by both Boyer Street and McGuire Parkway are private commercial entities. Table l - Existing At -Grade Crossing b�jorination Infrastructure Owner Rail Corridor Milepost U.S. DOT Crossing Inventory Number Roadway at the crossing Canadian National - Heritage Corridor 23.50 (Boyer) 289731 G (Boyer) Boyer Street & North America [CN] (HC) 23.40 (McGuire) 309452U (McGuire) McGuire Parkway Schedule for Services CONSULTANT anticipates a scheduled duration for the project of 16 months from the milestone approval of the Project Management Plan (PMP) (described in Task 1.3). Table 2 - Project Deliverable Schedule (Tentative) Deliverable # Deliverable Estimated Completion Date 1 Approved Project Management Plan (PMP) TBD (PMP Approval) 2 Project Planning Package PMP Approval + 3 months 3 Final NEPA Documentation PMP Approval + 10 months 4 Preliminary Engineering (PE) Design Set TBD (pending Supplement Agreement) 5 Final Performance Report (by others) TBD (pending Preliminary Engineering) Cf- Lochner Scope of Services Task 1 — Project Administration, Coordination, and Final Performance Reporting Subtask 1. 1: Project Administration CONSULTANT will set up and administer the project. CONSULTANT will prepare and submit invoices monthly. CONSULTANT's Project Manager and main point of contact for the Village is Jake Nardulli. Subtask 1.2: Agency and Stakeholder Coordination CONSULTANT will coordinate with project stakeholders through meetings, emails, and letters during delivery of the project.: • Village of Lemont: kickoff meeting and milestone updates • 2 Meetings (all virtual) • Coordination correspondence • IDNR — Environmental permitting and floodway • 1 Meetings (virtual) • Coordination correspondence • USFWS • 1 Meetings (virtual) • Coordination correspondence • USACE — Section 404 • 1 Meetings (virtual) • Coordination correspondence • MWRD — Impacts to stormwater and wastewater collection. • 1 Meetings (all virtual) • Coordination correspondence • Illinois Commerce Commission (ICC) • 2 Meetings (all virtual) • Coordination correspondence • Canadian National (CN) • 1 Meetings (all virtual) • Coordination correspondence • Illinois Department of Transportation (IDOT) — Impacts to IDOT system • 1 Meetings (all virtual) • Coordination correspondence • Metra — project impacts • 2 Meetings (all virtual) • Coordination correspondence • Cook County — project impacts • 1 Meetings (all virtual) • Coordination correspondence • Lemont Township — project impacts • 1 Meetings (all virtual) • Coordination correspondence • FRA—technical reviews 2 cf— Lochner • 4 Meetings (all virtual) • Technical review with FRA subject matter experts • Village will address internal project status coordination with FRA and submit quarterly progress and financial reports Property Owners • 4 Meetings (all virtual) • Coordination correspondence CONSULTANT will prepare meeting materials and create meeting minutes for all meetings. Subtask 1.3: Project Management Plan (PMP) The Village has prepared a Project Management Plan (PMP) as required by the grant pursuant to FRA guidance. This action is being completed outside of this scope of work description. The PMP describes how the Project will be implemented and monitored to ensure effective, efficient, and safe delivery of the Project on time and within budget. Work on Task 2 (Project Planning) activities cannot commence until written approval of the PMP (Deliverable #1). CONSULTANT also understands that the Village and their supporting consultants will be responsible for the evolving document that is the PMP, and thus CONSULTANT is not scoping services for any related activities. Subtask 1.4: Final Performance Report Final performance report to be completed by Village. Village will prepare and submit a Final Performance Report as required by Section 7.2 of Attachment 1 of the Grant Agreement, which will describe the cumulative activities of the Project, including a complete description of the Project achievements with respect to the Project objectives and milestones. This is the final task deliverable for the project. Table 3 — Deliverable l and S Schedule Deliverable Deliverable Estimated Completion Date # 1 Approved Project Management Plan (PMP) TBD (PMP Approval) 5 Final Performance Report PMP Approval + 16 months Task 2 — Project Planning Work on Task 2 cannot commence until after written approval is received from the FRA for the PMP from Task 1. CONSULTANT will conduct analyses, project planning activities, and prepare a Project Planning package as defined below. CONSULTANT will develop a project improvement scope that establishes the type and scope of capital improvements that meet the goals and objectives. In general, project planning will address development of a range of alternatives, study of reasonable alternatives, provide a preliminary assessment of environmental impacts, documentation of stakeholder input, tabulation of the decision -making process, and preparing documentation in accordance with the National Environmental Policy Act (NEPA). Subtask 2.1: Project Definition 3 (fp- Lochner CONSULTANT will develop a summary written project definition including its relevance in the transportation market(s) served — and the impact potential improvements may have on the rail system and overall transportation network. This summary definition will be included in the Project Planning package. Subtask 2.2: Preliminary Purpose and Need Statement CONSULTANT will develop, and submit to FRA for approval, a preliminary Purpose and Need statement to serve as the foundation for Alternatives Analysis; the preliminary Purpose and Need is for project planning and will be subject to agency and public review and comment as part of the NEPA process. Purpose and Need documentation will be included in the Project Planning package. Subtask 2.3: Stakeholder Coordination Plan A Stakeholder Coordination Plan will be prepared to identify key contacts within agencies, civic and business groups, public officials, relevant interest groups, present and potential riders/users, private service providers/shippers, other key stakeholder groups, and the public. The Stakeholder Coordination Plan will also identify potential state, local, and federal agencies that should be consulted with. The plan will identify involvement activities linked to key milestones in the planning/conceptual engineering and alternatives analysis process. CONSULTANT will prepare the Stakeholder Coordination Plan and submit for review. Subtask 2.4: Data Collection and Existing Conditions Assessment Subtask 2.4.1: Data Collection and Review: CONSULTANT will collect existing condition data for the project area. CONSULTANT will review and organize available material sources and relevant background studies performed by others prior to this scope of services, including: Available data sources from publicly accessible sources or as provided by the Village: • Topographic survey files and other project CADD reference files • CN and Metra Schedule information • CN and Metra maintenance schedules • IDOT Crash Data • CN and Metra Crash/Safety Data • As Built plans — Rail and Roadway • Zoning & Land Use Maps • Property Development Plans • Flood and Wetland mapping • GIS data layers • Utility Atlases Prior technical study summary information: • IDOT Phase I Kickoff Conference Report (09/03/2020) IDOT ESR Submittal (09/16/2020) • Wetland Delineation Report (10/22/2020) • USACE Jurisdictional Determination (01/20/2021) • PESA Response (01 /25/2021) rd e- Lochner • NRHP Site Information (04/29/2021) • IDOT Historic Resource Review (05/03/2021) • Walker Road Extension Draft Alternatives (012/31/2021) • Walker Road Extension Grade Separation Alternative and Rendering (01 /13/2021) • Walker Road Extension At -Grade Alternatives (11/18/2021) • Annexation Exhibit (10/23/2023) CONSULTANT will perform the following field data collection exercises: • CONSULTANT will perform one field visit to observe operations, note infrastructure conditions, and photograph the project area. • Traffic counts (5 locations) will be performed by CONSULTANT team utilizing MioVision hardware and software for the collection effort in coordination with Village of Lemont. Two (2) 24-hour counts will be conducted at the following locations: o Main Street and Walker Road o Main Street and Boyer Street o Main Street and McGuire Parkway o Boyer Street at CN Rail Crossing o McGuire Parkway at CN Rail Crossing • CONSULTANT will perform a tree survey investigation, and species, size and health for all the areas required. An exhibit of findings from this survey will conclude the process. CONSULTANT will not perform additional field surveys other than those indicated above. Any surveys deemed necessary will be performed by others or will be included in future supplemental agreements. Subtask 2.4.2: Existing Condition Assessment: Subtask 2.4.2.1 Existing Rail Infrastructure and Operations CONSULTANT will assess the condition of current rail operations and infrastructure and other conditions within the project area. This may include information on the roadway crossing characteristics, train operations and safety, the number of train tracks, train speed and train traffic through the railroad crossing, maintenance activities, engineering/capacity constraints of the existing facilities or infrastructure. • Identification of any planned or programmed infrastructure improvements within the project area. • The safety of the rail/road grade crossings (potentially including crash history, near misses, injuries, fatalities, or incidences of rail -related trespassing for each railroad crossing, if such exists), and deficiencies that hinder achieving a higher level of safety. Subtask 2.4.2.2 Existing Road Infrastructure and Operations • CONSULTANT will assess the pavement condition at the existing crossing roadways, visually. Other attributes identified and analyzed will include the 5 cf- Lochner presence of geometric design exceptions, number of highway lanes, highway posted speed, traffic flow characteristics, character of highway traffic through the railroad crossing, types of traffic control devices (including protective devices), land use, sight distance, topography, and distance to the next closest crossing. • CONSULTANT's assessment will include identification of sidewalks, bicycle lanes and public transit usage, as applicable. • CONSULTANT will request and evaluate crash data within the project study area. Data will be collected for the recent 5 years and will be requested through applicable public agencies. • CONSULTANT will analyze the existing traffic operations at the intersections along Main Street at Walker Road, Boyer Street, and McGuire Parkway. The capacity analysis will be performed using HCS or Synchro. Subtask 2.5: Alternatives Development and Analysis CONSULTANT will develop and document project alternatives based on the project's purpose and need and complete an Alternatives Analysis as part of the pre -design planning process. CONSULTANT will develop and analyze two (2) Build alternatives as well as the No Build alternative. • Subtask 2.5.1 Build Alternative Development o Build Alternatives will be developed to a conceptual engineering level of detail sufficient to identify necessary infrastructure improvements and determine the concept -level (order of magnitude) cost estimates for each alternative. o Conceptual engineering will include developing design criteria, track work concepts (as applicable), structural concepts and roadway crossing concepts for grade separation or closure, track relocation, installation of protective devices (signals, signs, other and measures that improve safety), mobility enhancements, and technology solutions, etc. o Alternatives will be plotted to 11 x17 exhibit sheets. • Subtask 2.5.2 Alternatives Analysis Memo o Prior to commencing Alternative Analysis, CONSULTANT will develop and submit to FRA, for approval, a memo documenting the methodologies to be employed in carrying out Alternative Analysis. Subtask 2.5.3 Technical Analysis of Alternatives o The transportation technical Alternative Analysis will be completed for each alternative. General considerations for the technical analysis should include the following items listed below: ■ Traffic counts per day that use the roadway now versus the traffic counts expected in the future, including any seasonal variation in traffic counts. Include pedestrian and bicycle counts if this applies. CONSULTANT will coordinate with the Chicago Metropolitan Area Planning Organization (CMAP) for forecast traffic data. CONSULTANT will make logical N cf— Lochner assumptions to convert the AADT data to peak DHV information for individual turning movements. ■ Determination of the operational performance including travel delay for the peak demand for each railroad crossing. This assessment will be conducted using SYNCHRO. ■ Frequency and duration of roadway blockage by trains including sidewalks and bicycle lanes (as applicable) and consider peak demand for train operations. ■ Discuss the direction the travel delays are occurring in (northbound, southbound, westbound, and eastbound). ■ The character of the adjacent road network and whether the railroad crossing creates access issues for the community, and does this consider future development projections close to the railroad crossing and any access issues for schools and/or emergency facilities. Subtask 2.5.4 Preliminary Environmental Screening o CONSULTANT will prepare Preliminary Environmental Screening of the suite of Alternatives in support of the Analysis process and to support future project development. In doing so, CONSULTANT will perform a high-level qualitative socioeconomic, cultural, human environment, and natural environmental resource inventory and preliminary effects analysis. This preliminary environmental assessment is not meant to take the place of full NEPA documentation, but to serve as a precursor to more detailed studies and to support decision -making in the Alternatives phase. • Subtask 2.5.5 Order -of -Magnitude Cost Estimate o CONSULTANT will complete an order -of -magnitude project cost estimate for the project Alternatives. Select infrastructure items will be quantified with the remainder calculated via assumptions and percentage allocations. Cost estimate will be in tabular form. Subtask 2.5.6 Alternative Evaluation Summary Table o CONSULTANT will prepare an Alternative comparison matrix for the purpose of summarizing the analysis and feedback collected in the above scope of services. This matrix will serve as a tool for stakeholder discussion and decision making. Subtask 2.5.7 Stakeholder Coordination of Alternatives Development & Analysis o CONSULTANT will coordinate with key stakeholders during development and analysis of the Build Alternatives in order to obtain feedback for comparison and for the project record. Scope services for these meetings are accounted for in Section 1.2. Subtask 2.6: Proiect Planning Package A Project Planning Package will be assembled for submittal to FRA for review and approval. (fp- Lochner Table d — Deliverable 2 Schedule Deliverable Deliverable Estimated Completion Date 2 Project Planning Package PMP Approval + 3 months Task 3 — Environmental Review with Supporting NEPA Document CONSULTANT will not commence work on Task 3: Environmental Review with Supporting NEPA Document until FRA has approved the PIMP deliverable described in Task 1: Project Administration and Management, accepted the Project Planning Package described in Task 2: Project Planning, and is provided with written notification to proceed. CONSULTANT will conduct an environmental review and prepare the environmental documentation for the Project action to comply with the National Environmental Policy Act (NEPA) (42 U.S.C. § 4321 et seq.), Section 106 of the National Historic Preservation Act, Section 4(f) of the Department of Transportation Act and Section 7 of the Endangered Species Act. At the time of this scoping, CONSULTANT anticipates the Class of Action will be a Categorical Exclusion. The scope of services, below, is prepared based on this assumption. Subtask 3.1 Environmental Survey Request o CONSULTANT will facilitate an Environmental Survey Request (ESR) update in coordination with IDOT. CONSULTANT will prepare the ESR boundary and submit this file to the project IDOT liaison for processing with resource agencies. IDOT will collect and forward response directives to CONSULTANT. A prior ESR request has been submitted for the project study area, however, it is anticipated that due to the lapse in time an update/additional request will be required. Subtask 3.2 Environmental Proiect Description (EPD) Memorandum o CONSULTANT will draft an Environmental Project Description (EPD) memorandum to provide a description of project with a focus on elements that would be of environmental concern. o The EPD, described above, will be submitted to the FRA for review and to determine the NEPA Class of Action. Subtask 3.3 FRA Categorical Exclusion Development o CONSULTANT will utilize the FRA Categorical Exclusion Worksheet as a guide in organizing and preparing the Environmental Analysis and in support of informing FRA with sufficient information to confirm a CE is the appropriate class of action under NEPA. The following actions and deliverables related to the Project Proposed Action are included with this scope item: o Subtask 3.3.1 Project Description ■ Develop a Description of the Project relative to the E: (fp- Lochner environmental considerations. This section will include a short, written summary and a project overview exhibit with key environmental features overlaid. o Subtask 3.3.2 Property Acquisition ■ Develop a description of the need to acquire property; included in this section will be a summary of outreach and feedback from affected property owners. This section will include a short, written summary and a project overview exhibit with property acquisition linework overlaid. o Subtask 3.3.3 Proposed Action Effects ■ Develop a discussion of effects resulting from analysis of potential impacts including measures to avoid, minimize, and mitigate impacts. Topical coverage for impact discussion is expected to include the following: Subtask 3.3.3.1 Summary of Affected Environment • Summary of the affected environment — CONSULTANT will define the limits of the Project or analysis area and briefly describe the environmental conditions in and surrounding the area. This section will include a short, written summary and a project overview exhibit with key environmental features overlaid. Subtask 3.3.3.2 Land use analysis • CONSULTANT will briefly describe the existing land use of the Project area and surrounding properties and resources and identify and discuss alignment with or any potential inconsistencies the Project might have with local land use plans and policies. This section will include a short, written summary and a project overview exhibit with referenced Land Use information. Subtask 3.3.3.3 Cultural Resources • In reviewing the 2020/2021 ESR response from [DOT, the Central Office provided a map of archaeological sites within the project ESR boundary. Though NHRP site presence is indicated in the area, the Project's Area of Potential Effect (APE), is not anticipated to disturb these sites. CONSULTANT anticipates preparing a short memorandum concluding that "No Historic Properties Affected." This memo will describe the Project APE, the research and response information from IDOT sources, and an exhibit showing the Project with the NHRP sites. This memorandum will be submitted to the State Historic Preservation Office 9 Cf- Lochner (SHPO) for a 30-day review period. This scope of work assumes SHPO will not object, comment, or require further action. Subtask 3.3.3.4 Parks and Recreational Facilities • The project is located near the Lemont Heritage Quarries Recreation Area. Because of the proximity of recreational lands, CONSULTANT anticipates developing a detailed description of the property, including map or drawing, describing the recreational uses of the property, any unique characteristics of the property, identify if the property or resource may be protected under Section 4(f) of the Department of Transportation Act, and discuss any coordination with the entity with legal jurisdiction over the property. CONSULTANT anticipates the study regarding recreational and potential 4(f) properties will not result in a "use" requiring additional coordination. A description of this reasoning will be prepared for project documentation, along with an exhibit of the project area and recreational lands surrounding. Coordination with the Village of Lemont, Lemont Township, the MWRD is anticipated, along with representatives of "The Forge" who operate within the Recreation Area. Subtask 3.3.3.5 Transportation Impact Assessment • CONSULTANT will provide a summary on whether the Project will have any effect (beneficial or adverse) on transportation including but not limited to other railway operations, road traffic, pedestrian, or increase the demand for parking. Anticipating that an effect is evident, CONSULTANT will describe potential transportation, traffic, and parking impacts, and address capacity constraints and potential impacts to existing railroad and highway operations. In addition, • CONSULTANT will summarize any coordination that has occurred with other railroads or highway authorities whose operations this Project would be impacted. This section will include a short, written summary and a project overview exhibit with key area transportation elements. Coordination in development of this section is anticipated with the Village of Lemont, IDOT, surrounding property owners (2), the Canadian National Railroad, Metra, the ICC, Lemont Township, and Cook County Department of Transportation & Highways. • Existing and Future operational analyses results (road & rail) will be attached as documentation. 10 (f'- Lochner ■ Subtask 3.3.3.6 Noise and Vibration • Sensitive receptors are anticipated in or near the project area. CONSULTANT will analyze the potential noise impacts of the applicable segments of the project in accordance with the regulations set forth in Title 49 of the Code of Federal Regulations, Part 210 (49 CFR 210), the FTA's Transit Noise and Vibration Impact Assessment manual, the Federal Highway Administration (FHWA) regulations published in 23 Code of Federal Regulations, Part 772 and the IDOT Noise Policy. The analysis will be completed in keeping with the laws, regulations, guidance, methodologies and models that are in place or in effect at the time of the analysis. CONSULTANT's scope of work includes: • Data Compilation - CONSULTANT will assimilate topographic and aerial mapping, design files, traffic data and other information for the project. CONSULTANT will prepare base maps for noise analysis. • Selection of Analysis Sites - CONSULTANT will identify noise sensitive sites within the area that could be affected by noise from the project. It is anticipated that the project study area will be limited to the properties adjacent to the proposed roadway alignment and '/4 mile along the tracks from the existing grade crossings. • Ambient Noise Levels - Existing ambient noise levels will be determined by monitoring (field measuring) background noise levels at representative sites. Two sites are included, one along Main Street and one along the I&M Canal Trail. • Noise Modeling - For properties along Main Street, noise levels for the existing and design year Build and No -Build conditions will be predicted at receptor sites using FHWA's Traffic Noise Model, v2.5 for the worst noise hour. The FTA methodology will be used to calculate a contribution to noise levels from rail activity. For properties away from any roadway sources, the FTA methodology will be used to calculate noise levels for the existing and design year Build and No -Build conditions. This task includes assembling roadway traffic data for use in the TNM modeling and rail traffic data for usage in the FTA methodology. • Determination of Impacts - Since the project is a roadway improvement with a rail noise component, noise impacts will be determined based on both the IDOT Noise Policy and the FTA methodology. • Noise Abatement Considerations - CONSULTANT will investigate potential noise abatement measures where noise impacts are identified. All applicable noise 11 cf— Lochner abatement measures will be evaluated for feasibility and reasonableness. If noise walls or berms are the recommended noise abatement measure, the approximate length, height, attenuation, and cost effectiveness will be calculated for each recommended barrier. • Vibration Analysis - CONSULTANT will determine design year vibration impacts of the project based on the FTA methodology. It is assumed that field measurement of vibration will not be necessary. • Noise and Vibration Technical Report - CONSULTANT will summarize in a report the methods, assumptions, input data, and results of the noise and vibration study analysis, including a description of abatement measures. Three printed copies and one electronic copy of two separate draft reports will be submitted to the Rail Division for review and comment. CONSULTANT will revise the report following each of the two the Rail Division reviews, including providing memoranda with responses to comments. It is assumed that the third draft of the report will be ready for FRA review, after which the final report will be produced. Subtask 3.3.3.7 Air Quality • The Consultant will identify the attainment status for criteria pollutant for the project area. A qualitative assessment of the project's effects on criteria pollutants will be prepared and documented in a Technical Memorandum. Since the project is not anticipated to change the area roadway network or attract new roadway or rail traffic, it is assumed that the project will not result in new criteria pollutant emissions. Assessments of greenhouse gas emissions and mobile source air toxics are not included. Screenings for carbon monoxide at the signalized intersections in the project area are not included. Subtask 3.3.3.8 Hazardous Materials and Waste • A Preliminary Environmental Site Assessment (PESA) was performed by IDOT, with a completion date of January 2021. This PESA response will require updating due to the lapse of time from prior completion. PESA findings from the 2021 report show that multiple sites along the project were determined to contain RECs. It is highly likely that the next PESA update will show the same. As the contract continues, a Preliminary Site Investigation is likely required. CONSULTANT assumes this PESA update effort will 12 cf— Lochner be completed by others, and CONSULTANT will coordinate with this party regarding the totality of the project impact area. Subtask 3.3.3.9 Communities and Environmental Justice • CONSULTANT will provide a summary of potential impacts to adjacent communities both beneficial and adverse. Anticipating no adverse impacts, CONSULTANT will provide a summary of steps taken to assess this determination including coordination with the Village, township, and adjacent property owners. In addition, a Public meeting will help where general feedback can be solicited. ■ Subtask 3.3.3.10 Waters of the US The Project may temporarily or permanently impact wetlands in the area. A wetland delineation was previously performed by others, but due to the lapse of time, this report will need to be updated. The Consultant will perform a wetland delineation, prepare an update to the wetland report, and coordinate a jurisdictional determination with the USACE. For this CE worksheet section, CONSULTANT will show wetlands and waters on the site map and classify and describe the Project's potential impact to on -site and adjacent wetlands and waters and attach any correspondence with the US Army Corps of Engineers. CONSULTANT anticipates a 404 permit will be necessary for the project and will assemble documentation in support of this process for future phases. Subtask 3.3.3.11 Floodplains • The Project area is highly likely to include an area designated as 100-year floodplain, special flood hazard area, and/or regulated floodway. CONSULTANT will describe the potential for impacts due to changes in floodplain capacity or water flow and how the Project will comply with Executive Order 11988. Scale maps representing potential impacts will be prepared and attached to the CE documentation. Subtask 3.3.3.12 Water Quality • Waters of special quality may be present in the project area. CONSULTANT anticipates investigation of these sources/resources, a summary of the potential impacts as well as mitigation strategy to protect these sources as the project develops through design and moves to 13 (:P- Lochner implementation. CONSULTANT assumes a Section 401 permit will not be necessary for the Project. This section will include a short, written summary and a project overview exhibit with referenced water quality features information. ■ Subtask 3.3.3.13 Navigable Waterways • No impacts anticipated from the Project. ■ Subtask 3.3.3.14 Coastal Zones • No impacts anticipated from the Project. ■ Subtask 3.3.3.15 Important Farmlands • No impacts anticipated from the Project. ■ Subtask 3.3.3.16 Listed Species • CONSULTANT will coordinate any listing of critical species potentially present (as determined through the ESR process) with the appropriate resource agencies. (e.g., IDNR, USFWS). This scope of services assumes only research and consultation will be needed and that the conclusion will be that critical species habitat will not be present or affected by the project improvements; no detailed biological survey or assessment will be required. This section will include a short, written summary and will include attachments representing resource agency coordination. ■ Subtask 3.3.3.17 Public Safety • The Project is not expected to create public safety or security impacts. A short, written section will describe the reasoning for this conclusion. Subtask 3.3.3.18 Mitigation • CONSULTANT will describe all mitigation measure commitments as noted on CE worksheet, which address identified impacts that have been incorporated into the Project. A short, written section and a table will be provided. Subtask 3.3.3.19 Public Notification • CONSULTANT will provide a description of public outreach efforts undertaken on behalf of the Project. Services included in this scope of work will be: • Organizing and executing one (1) Public Open House held at a Village building. CONSULTANT will arrange logistics for the Open House, prepare materials, 14 cf— Lochner coordinate messaging with the Village, staff the Open House, solicit public comments for the record and provide responses. A summary (memorandum) of activities and information collected will be prepared at the conclusion of this process. • CONSUTLANT will develop and facilitate project letter distributions to Stakeholders and Property Owners. This scope of services does not include any presentations to the Village board, nor other public events or demonstrations. Subtask 3.3.3.20 Related Federal, State, or Local Actions Permits • CONSULTANT will provide a table of permits required for the Project action pursuant to another Federal environmental law, which will become clear through coordination and correspondence with Federal permitting agencies. A short description will be provided in the table including a description of the permitting issue in the relevant resource discussion. Correspondence documentation will be attached. • Development of permit applications is assumed to be done by others. Table 5 — Deliverable 3 Schedule Deliverable Deliverable Estimated Completion Date 3 Final NEPA Documentation PMP Approval + 10 months Task 4 — Preliminary Engineering Subtask 4.1: Preliminary Engineering Design Package CONSULTANT will complete Preliminary Engineering (PE) (30% design) for FRA review and approval to support the construction of the Project. The PE Design Set will be developed for the preferred alternative in sufficient detail to define, as applicable, operational performance, resilience outcomes, construction duration, material quantities, domestic material and product sourcing strategy, practical construction methods, utility and road relocations, property acquisition, and risks, including third -party risks, that influence schedule and cost. The outcome of studies through completion of Task 3 and the scope of the preferred alternative is unknown. As such, a planned supplement will be developed for Task 4 once the scope of the preferred alternative is understood. The planned supplement will include the following subtasks if applicable and develop the PE Design Set in detail to meet the scope of the preferred alternative. Subtask 4.1.1 Preliminary Engineering Plan Set 15 (fp- Lochner Subtask 4.1.2 Intersection Design Studies (IDS) Subtask 4.1.3 Drainage Studies, Regulatory Coordination, and Reporting Subtask 4.1.4 Capital Cost Estimate CONSULTANT will identify the capital cost to design, construct, and implement the preferred alternative. Table 5 —Deliverable 4 Schedule Deliverable Deliverable Estimated Completion Date 4 Preliminary Engineering (PE) Design Set PMP Approval + 14 months Task 5 — QAQC Lochner will perform QAQC on all deliverables per Lochner's QAQC plan. Note that the QAQC plan is incorporated as part of the PMP. Scope Exclusions — This scope of work excludes actions relative to the following: 1. PMP Development and Coordination 2. Final Performance Report — Development and Coordination 3. Field Survey (other than items indicated) 4. Future Safety Performance predictive modeling (Rail/Road) 5. Bridge Type Study 6. Type, Size and Location Study 7. Hydraulic Reports for Bridges 8. Incidental Take Authorization(s) 9. Preparation/Coordination of a CLOMR or LOMR 10. Soil Geotechnical & Environmental Borings 11. Structural Geotechnical Reports 12. Roadway Geotechnical Reports 16 Cf- Lochner Attachment B Project Schedule 10 cf— Lochner Project Deliverable Schedule (Tentative) Deliverable Deliverable Estimated Completion Date 1 Approved Project Management Plan (PMP) TBD (PMP Approval) 2 Project Planning Package PMP Approval + 3 months 3 Final NEPA Documentation PMP Approval + 10 months 4 Preliminary Engineering (PE) Design Set TBD (pending Supplemental Agreement) 5 Final Performance Report (by others) TBD (pending Preliminary Engineering Schedule 11 Cf- Lochner Attachment C Workhours k � / $ � ! _ f - { � - @ �_� / \ 12 \ _ E ! I ■§ I !!§ . ■ !a !® _ � ];§!■la,�2■ ■ �■ @!! ■■ ■ ! §| e� a!':; a;ee; el;, ! „ ;� ;; :■ „ , § ;o2 # !f r /!(,\))) E° - t - ft / �\/a •§\f&)|{!# � \ |�\j,\(\\\{\\\k\\�§k.k �)\|f !)�;'�•r`:`�;/.�`�``i!\!` �7z!!3l;;FIT3!!;�°°!!!a!� # i�� � \\\ \\ -- /®£ } ® \< � )kj -iE\} 2 § \ \ \\ \ \ / § ) § 7 § , I § , ,_�■_;|-, |Aal;a „ ■!�fl, �k�\ \ _, - f,� !)� _ -, ,!! !:®.��:|±! /1,0 !! ]!��)#]!}°�®!2!I ;!!•�l;.;a,/)|{/J| ;!)}\ !k%; 2 oo ��� = f § & n | § iz § Ell �