Loading...
R-86-26 Approving Extra Work Proposal 013 PW Annex Storage Building413 Main Street I Lemont, IL 60430 THROUGH: SUBJECT: A Resolution Approving Extra Work Proposal 013 PW Annex Storage Building DATE: October 13, 2026 SUMMARY/BACKGROUND Public Works Department is requesting approval of Extra Works Proposal 013. The Contractor found a deficiency in the structure supports related to wind shear on the mezzanine and proposed Extra Work Order 013 to correct this. To expedite the additional work and keep the job moving forward so the Contractor doesn't have to pull their crew, the Village Administrator signed off as an emergency change order. This is the Resolution to request Board approval for the change. ANALYSIS Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass A Resolution Approving Extra Work Proposal 014 PW Annex Storage Building BOARD ACTION REQUESTED Pass A Resolution Approving Extra Work Proposal 014 PW Annex Storage Building ATTACHMENTS A Resolution Approving Extra Work Proposal 013 PW Annex Storage Building.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R- ' -26 A RESOLUTION APPROVING EXTRA WORK PROPOSAL 013 PW ANNEX STORAGE BUILDING JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk SAMUEL J. FORZLEY JANELLE KITTRIDGE KEN MCCLAFFER TY KEVIN SHA UGHNESSY RICK SIVIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on IQ k�026 RESOLUTION NO. R- ') -26 A RESOLUTION APPROVING EXTRA WORK PROPOSAL 013 PW ANNEX STORAGE BUILDING WHEREAS the Village of Lemont recommends that Extra Work Proposal 013 to install additional steel bracing for the PW Annex Storage Building project be accepted; and WHEREAS, the Village seeks to utilize the services of E.P. Doyle & Son, LLC for such work as part of the PW Annex Storage Barn Project, and as Extra Work Proposal No. 013 to same; and WHEREAS, E.P. Doyle & Son LLC, submitted a bid for such work in the amount of $33,359.87; and WHEREAS, the Village has determined that the circumstances which necessitate this change were not reasonably foreseeable at the time the contract was executed; and WHEREAS, the Village has determined that this change is in the best interest of the Village. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: Change Order Request Number 013 to be completed by E.P. Doyle & Son, LLC, 1100 Wheaton Oaks Court, Wheaton, IL 60187 in the amount of $331,359.87 is hereby approved. SECTION 2: The Village President, Administrator, or Designee is hereby authorized to execute the agreement and to make minor changes to the document prior to execution that do not materially alter the Village's obligations, to execute any other agreements and documentation as well as to take any other steps necessary to carry out this resolution. SECTION 3: This Resolution shall be in frill force and effect from and after its passage and approval as provided by law. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COVN IES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS DAY OFs% 2026. Samuel J. Forzley Janelte Kittridge Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES V V l� 161 CHARLENE M. SMOLLEN Vi lage Clerk St o� v � J 7 NCO ,L L 11%® ABSENT: ABSTAIN: OHN EGOFSKE President EXHIBIT A Extra Work Proposal #013 Village of Lemont New Public Works Building (26-003) Extra Work Proposal #013 Below are the pricing and time requirements to perform the following extra work to the contract: Additional Bracing for Steel on CL 7 References : Analysis by Post -Frame Bldg's SE Submittal: #1 09/24/2026 EWP Cost Subtotal $30,026.88 Overhead and Profit 10.00% $3,002.69 P&P Bond 1.00% $330.30 EWP #013 Total Cost: $33,359.87 EWP #013 Time Extension : TBD C4601 Notes : Add cross bracing to building steel on column line 7 to address concerns raised by the Structural Engineer for the post -framed building package. E. P. Doyle is uncomfortable with proceeding to sheath and install siding on the North and South ends of the new building until the cross bracing is installed. The related delays, and impacts on general conditions, is difficult to quantify until we know when this additional bracing is approved, along with shop drawing approval. 30,026.88 Add to Structural Steel ------------------------------------------------------------ 30,026.88 Subtotal 3,002.69 EPD OH&Fee 330.30 P&P Bond $33,359.87 Total Additional general conditions and general requirements are separate from overhead and profit, and are both excluded from the amounts above unless specifically listed. To authorize E.P. Doyle & Son, LLC to proceed with this extra work, please acknowledge your acceptance of this proposal by signing and dating below, and we will issue a Change Order in accordance with the Contract provisions. E. P. Doyle & Son, LLC By September 24, 202 Date Thursday, September 24, 2026 CHANGE ORDER REQUEST 41.1ded Tension )hod X-Far€king at Mezzanine - Grid Line 7 COR # To: Email: 8355-001 Rev 1 Date: Kevin Kozlowski, Project Manager Project: E.P. Doyle & Son, LLC EPD Contract: 1100 Wheaton Oaks Court, Wheaton, IL 60187 RHS Job No.: kkozoowski@epdoyle.com DESCRIPTION OF CHANGE Reference: RALPH H. SIMPSON CO. Y's, h�lf,)tJ.`il'�h\L i�R EI.PrIHI R� ( ii.6 � 23 33!};%37-90n7 i ftr\(_}'!IFSIi�ilf'SOi�IC:JS;C)�il September 24, 2026 New Lemont Public Works Pole Barn 26-003 8355 Carlile A-301 Det. 8 (07/01/26); RHS E3 Rev 1 (09124/26) Per E.P. Doyle email dated 09/22/2026 and Carlile Architects sheet A-301 (Architectural Sketch #1, 07/01/26, Detail 8), furnish and install four (4) bays of V diameter steel rod X-bracing between the mezzanine and roof framing along Grid Line 7, at bays B-D, F-H, K-M and P-R, as detailed on RHS drawings E3 Rev 1, 52VB1, 53VB1, 54GP1-57GP1 and G4 (09/24/2026). SCOPE INCLUDED • Shop drawings for rod braces, clevises and gusset plates. • (16) 1" dia. A36 rod braces (marks 52VB1 / 53VB1), LH/RH threaded for field adjustment, each with (2) #2-1/2 clevises, V pins and jam nuts (32 clevises total). • (16) PL 1/2" corner gusset plates (54GP1, 55GP'l, 56GP1) and (4) PL 1/2" x 12" x V-4" center plates (57GP1) at brace intersections, shop primed. • Field welding of corner gussets to existing column and beam flanges (1/4" continuous fillet, both sides).. installation and tensioning of braces, lift and welding equipment, and delivery to site. PRICING Description Amount Material (V rods, #2-1/2 clevises & pins, jam nuts, 1/2" plate, consumables, delivery) $4,705.80 Shop Drawings / Detailing $700.00 Shop Fabrication Labor (plates, prime, rod assembly & kitting) $1,235.00 Erection Subcontractor - labor & equipment (Premier Steel Solutions COR-01, attached) $21,640.00 Subtotal - Direct Cost $28,280.80 Overhead & Profit - 10% on RHS work ($6,640.80) per Subcontract Section 7.3 $664.08 Markup - 5% on erection subcontractor ($21,640.00) $1,082.00 TOTALORDER ®D $30,026.88 CLARIFICATIONS & EXCLUSIONS • Braces are adjusted by LH/RH threaded rod ends in lieu of separate turnbuckles, with a center plate at each X in lieu of crossing rods. Subject to Architect / Engineer of Record approval; engineering / PE -stamped calculations are excluded. Bottom gussets at the mezzanine beam fall in the zone of the bar joist seats, wood nailer and plywood decking (by others). Removal / replacement of nailer or decking and any revised connection detail are excluded. • Braces pass through the fixed mezzanine guardrail zone. Guardrail modifications, if required, are excluded. • Straight -time, normal working hours. Overtime / premium time, remobilization, finish painting, fireproofing, permits and bonds are excluded. Clear lift access to work areas by others. Project is tax exempt. • Schedule: a time extension of five (5) calendar days is requested for this change. Fabrication and delivery per material lead times following written approval. • Pricing valid for 30 days. Work will proceed upon receipt of a fully executed Subcontract Change Order per Section 7 of the Subcontract Agreement. Sub and supplier backup attached. SUBMITTED BY: RALPH H. SIMPSON CO. ACCEPTED BY: E.P. DOYLE & SON, LLC Dom-lfil,k Jagm gin. Pfgect Manager Date gnatue, Name; Title Data Ascelianr.ou.; :v1>:ta13 I R lu:h t i Siolpsnn co )P _;sr00-. P. V 1 Premier Steel Solutions 700 Butterfield Road, Suite 300, Lombard, IL 60148 (630) 2,11-9380 COR NUMBER CHANGE ORDER REQUEST PSS-26-029-RSC-COR-01 COR NO. 01 DATE: September 23, 2026 PRICE VALID: 30 days PROJECT TO(CUSTOMER) Lemont Public Works Ralph Simpson PROJECT LOCATION ATTENTION 12490 Derby Road, Lemont, IL Attn: Dominick Jagman, Project Manager JOB NUMBER PREPARED BY 26-029-RSC Dino DePasquale, President CONTRACT REFERENCE Subcontract Agreement dated 5/26/2026 (Proposal 426-062) DESCRIPTION OF CHANGE Furnish labor and equipment to install (16) 1/2" thick gusset plates - unload, layout, tack in place, and field weld with 1/4" fillet continuous, both sides - and install (8) 1" steel rod braces with turnbuckles and clevis, including unload, installation, and tensioning, per Sheet A-301 Detail 8 Revision 3 (7/01/2026) and SK-TR1 (9/22/2026). Reason for change: Rod bracing added by the Engineer; not shown on the original bid documents referenced in Proposal #26-062. Reference documents: Sheet A-301, Detail 8, Revision 3, dated 07/01/2026; SK-TR1, dated 09/22/2026 es. � CATEGORY DESCRIPTION CITY UNIT RATE AMOUNT LABOR Install (16) 1/2" gusset plates and (8) 1" steel rod braces _ �$17,240.00 w/ turnbuckles & clevis - unload, layout, tack, field weld This is based on how many �~ 1/4" fillet continuous both sides, tension rods labor hours and a force of what? Labor subtotal $17,240.00 EQUIPMENT 40' boom lift w/ welder, weekly rental 2 wk $2,000.00 /$4,101,00 Equipment subtotal $4,000.00 CV 2 m berbY Nd lamo d, IOmoir,. USA 010/51'26-10119,26 Cart Order summary Rentals �, felesm P'c Jfj'Sbaq,h� 1,11" iA, 92.620 O, O Hema�.a TOTAL DIRECT COST 1 rdu rs T di oA $'2,628 $424 Rental price + markup appears high. Equipment subtotal already appears to have a markup. $268.55 Estimated subtatal. $3,312.55 c,a,�te note $21,240.00 ,g $400.00 markup has been applied to PSS-26-029-RSC-COR-01 I Paye 'i Price is based on performing this work concurrently with base contract scope; remobilization, if required, will be billed as an additional change order. Excludes any work requiring overtime, night, or weekend hours. Boom lift access to work areas to be maintained clear by others. 1 y 'Y .ti.' SUBMITTED BY AUTHORIZATION TO PROCEED Premier Steel Solutions Ralph Simpson Signature Signature Dino DePasquale --------------------------------------- Name (print) Name (print) Title Title Date ^—__._---_.--_-- Date --- TERMS: 1. This Change Order Request (COR) s a proposal only and does not modify the contract. Contract amounts will be adjusted by formal Change Order upon approval of this COR. 2. The price stated Is valid for the period shown, after expiration it is subject to reprice for material, labor, and equipment escalation. 3. Signature under Authorization to Proceed constitutes direction to perform the work described at the price stated and agreement that this COR will be incorporated into a formal Change Order at that amount. 4. Absent written authorization, no work described herein will be performed. Work directed verbally will proceed only on a time -and -material basis with daily signed tickets, and this COR price will not apply. 5. Work is priced on the basis of straight -time hours during normal worWm hours unless expressly noted otherwise. 6. Any schedule impact stated herein is contingent on authorization within the price validity period. Premier Steel Solutions 1 700 Butterfield Road, Suite 300, Lombard, IL 60148 1 (630) 241-9380 COR PSS-26-029-RSC-COR-01 I Page 2 tJ a s`d N rn IL I .. , r ' I I , 3 ! S 1 r , I ,j { W 2 ~ i O ' c y _ r � .LLI� w - i �O u El z i a � n 2t- � L K W e J ui x, c7 o ry�q Q v W rc o' m r a O a r - 73 w \ J U N I N � L �_J \m N Lf'> U:) W U m �I tJ NF--N 1 1. W 00