R-67-26 Authorizing the Illinois Street and State Street Intersection Improvements Project418 Main Street I Lemont, IL 60439
TO: Village Board Meeting
FROM: Ted Friedley, Public Works
THROUGH:
SUBJECT: A Resolution Authorizing the Illinois Street and State Street Intersection
Improvements Project
DATE: August 10, 2026
SUMMARY/BACKGROUND
Illinois Street is and IDOT route from New Avenue to Main Street. The intersection of Illinois &
State Street is consistently a maintenance nightmare due to the heavy truck traffic through it.
Trying to get a hold of the IDOT maintenance yard in Joliet has always proved to be difficult
through the years. After 18-24 months of trying to get IDOT to rectify the slipping asphalt
pavement occurring in the Illinois/State intersection, Mayor Egofske was able to get a meeting
with Jose Rios, Region 1 Engineer, on site to show him these issues at this intersection as
well as a little further East on Illinois Street where the sidewalk is failing. Once Mr. Rios saw
the issue at the intersection, he quickly acted to find the best way to repair it.
Through Mr. Rios, another meeting was set up with Jacek Ejmont, at the time the Region 1
Bureau Chief of Maintenance, and a member of the IDOT Joliet maintenance yard to
determine the limits of what needs to be repaired at the Illinois/State intersection. After this
meeting, the next step was to determine who would perform the work.
The Village mentioned that there was an upcoming resurfacing project on State Street that
was going to dead end at Cass Street. If IDOT Joliet maintenance yard was willing to pay for
the additional work at the intersection and meet the Village project at Cass Street, the general
contractor was willing to do the work. At this time, IDOT determined that it would be a better
idea to have this done by and IDOT approved contractor instead of having their Joliet yard
perform the work.
The Village mentioned that there was an upcoming resurfacing project on State Street that
was going to dead end at Cass Street. If IDOT Joliet Maintenance Yard was willing to pay for
the additional work at the intersection and meet the Village project at Cass Street, the general
contractor was willing to do the work. IDOT at this time determined it would be a better idea to
have this done by an IDOT-approved contractor instead of having their Joliet yard perform the
work.
IDOT determined that the Village contract would not be a good idea because it had already
been let out, so this additional work would be considered an extra. Instead, IDOT had two
Archer Avenue resurfacing contracts being let out in early 2026, so they decided to add the
Illinois/State intersection work to one of the Archer contracts.
Throughout this process, it was always the understanding this intersection work would meet
the Village's State Street resurfacing project. While the intersection work was being done, it
came to be that the block of State Street between Cass Street and Illinois Street was not part
of the Archer Avenue plans. When quizzed on this, the IDOT resident engineer told us that his
boss told him that the block between Cass and Illinois is not IDOT maintenance, so it could not
be part of the contract. When further quizzed that this block of State Street is the same
concrete pavement that used to be at the Illinois/State intersection, IDOT just said to check
their jurisdiction map. When the jurisdiction changed from [DOT to Village (for 80% of the
block), no one knows. The cost to resurfacing State Street from Cass Street to Illinois Street is
$75,855.57.
Before the general contractor started the Illinois/State intersection, the Village requested a
quote to see how much it would cost to perform the intersection work at night to minimize the
amount of traffic headaches that would occur if the work occurred during the day. The cost to
do the intersection work at night is $14,483.86.
ANALYSIS
The improvements at the Illinois/State intersection were much needed. The bulk cost of these
improvements was paid for by IDOT Joliet Maintenance yard. The night paving extra was a
request of the Village to not greatly inconvenience Lemont residents. Resurfacing the block of
State Street between Cass Street and Illinois Street was always intended to be part of this
project and leaving that block as -is did not make any sense given the improvements both north
and south of this block.
Staff will continue negotiating with IDOT on the total payment of the resurfacing of State Street
from Cass Street to Illinois Street.
Consistency with Village Policy
5-Year Capital Improvement Plan (if applicable)
STAFF RECOMMENDATION
Pass A Resolution Authorizing the Illinois Street and State Street Intersection Improvements
Project
BOARD ACTION REQUESTED
Pass A Resolution Authorizing the Illinois Street and State Street Intersection Improvements
Project
ATTACHMENTS
A Resolution Authorizing State Street and Illinois Street Intersection Improvements Project.pdf
VILLAGE OF LEMONT
RESOLUTION
NUMBER R- (61-26
A RESOLUTION AUTHORIZING STATE STREET AND ILLINOIS STREET
INSTERSECTION IMPROVEMENTS PROJECT
JOHN EGOFSKE, Village President
CHARLENE M. SMOLLEN, Clerk
SAMUEL J. FORZLEY
JANELLE KITTRIDGE
KEN MCCLAFFERTY
KEVIN SHA UGHNESSY
RICK SNIEGOWSKI
RON STAPLETON
Trustees
Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on V-102026
RESOLUTION NO. R- I -26
A RESOLUTION AUTHORIZING STATE STREET AND ILLINOIS STREET
INSTERSECTION IMPROVEMENTS PROJECT
WHEREAS the Village of Lemont requires that the Illinois and State Street Intersection
Improvements project including State Street from Illinois Street to Cass Street be completed; and
WHEREAS, the Village seeks to utilize the services of K-Five Construction Corporation
Company for such work; and
WHEREAS, K-Five Construction, 999 Oakmont Plaza Drive, Suite 200, Westmont, IL
60559 submitted proposals as outlined in Exhibits A and B totaling $90,339.43 for such work.
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of
the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows:
SECTION 1:
The agreements attached hereto as Exhibit A and Exhibit B are hereby approved.
SECTION 2:
The Village Administrator and/or designee are hereby authorized to execute the
agreements and to make minor changes to the document prior to execution that do not materially
alter the Village's obligations, to execute any other agreements and documentation as well as to
take any other steps necessary to carry out this resolution.
SECTION 3:
This Resolution shall be in full force and effect from and after its passage and approval as
provided by law.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COUNTI OF COOK, WILL, AND DUPAGE, ILLINOIS,
ON THIS d DAY OF S 2026.
Samuel J. Forzley
Janelle Kittridge
Ken McClafferty
Kevin Shaughnessy
PRESIDENT AND VILLAGE BOARD MEMBERS:
AYES: NAYES
V
✓/
V
Rick Sniegowski /
Ron Stapleton
ATTEST:
CHARLENE"Nf. SMOLLEN
Village Cler
0
;A
Y U A
//lind%9
ABSENT: ABSTAIN:
JOHN EGOFSKE
President
Exhibit A
K-Five Proposal Mill and Pave State Street from Illinois Street to Cass Street
FIVE
999 Oakmont Plaza Drive • Suite 200 • Westmont, IL 60559
(630) 257-5600 Fax (630) 257-6788
To:
Address:
Village Of Lemont
Lemont, IL
Contact: Ralph Pukula
Phone: 708-646-1830
Fax:
Project Name:
Project Location:
Milling & Paving Of State ST - From Illinois St To Cass St
State St From Illinois St To Cass St, Lemont, IL
Bid Number:
Bid Date: 7/27/2026
Item # Item Description
005
Pave 2" SMA N80 Surface 9.5 At Night - State St From Illinois St To Cass St
010
2" HMA Surface Removal Of State St From Illinois St To Cass St
020
Short -Term Pavement Marking Between Milling & Paving Ops
030
Additional Low Boy Move / Mobilization For Milling & Prep Crew
040
Logitudinal Joint Sealant
050
Bituminous Materials (Tack)
060
Thermoplastic Pavement Markings / Raised Reflective Pavement Markers
Total Bid Price: $75,855.57
Notes:
• This Proposal was generated by the Request of the Village of Lemont to Mill & Pave State St from Illinois St (IDOT Contract 8OB30
Limits) to Cass St (Village Of Lemont State St Resurfacing Limits).
• All Activities related to this additional work are listed above. This price excludes any Curb & Gutter Replacement or Any
Structure / Sewer Adjustments
• Milling Prep begins today 7/27/26 in the evening, with HMA Surface Removal beginning at 3am on 7/28/26. Tack Coat & LIS to
be installed 7/30/27 @10pm. All Activities Weather Permitting.
Payment Terms:
NET DUE IN 30 DAYS UPON COMPLETION.
ACCEPTED:
The above prices, specifications and conditions are satisfactory and
are hereby accepted.
Buyer:
Signature:
Date of Acceptance:
7/27/2026 1:33:07 PM
CONFIRMED:
K-Five Construction
Authorized Signature:
Estimator: Will Jennings
willj@k-five.net
Page 1 of 1
Exhibit B
K-Five Proposal Night -Time Additional Cost to Mill and Pave Illinois Street from New
Avenue to State Street
FIVE
999 Oakmont Plaza Drive • Suite 200 • Westmont, IL 60559
(630) 257-5600 Fax (630) 257-6788
To: Village Of Lemont Contact: Bruce Hill
Address: Lemont, IL Phone: 708-646-1830
Fax:
Project Name: IDOT 80B30 - ILLINOIS STREET - NIGHT-TIME ADDITIONAL COST Bid Number:
Project Location: Illinois Street From New Ave To State St, Lemont, IL Bid Date: 7/14/2026
Item # Item Description Estimated Quantity Unit
001 Premium Time / Additional Cost - Mill & Pave Illinois Street At Night Per Village Of Lemont Request 1.00 LS
Total Bid Price: $14,483.86
Notes:
• This Proposal Includes The Following Activites To Be Performed At Night:
HMA Surface Removal 2" on Illinois Street from New Ave to State St (Per IDOT Contract 80B30)
Opening of K-Five's HMA Plant
Paving HMA on Illinois Street from New Ave to State St (Per IDOT Contract 80B30)
• All Other Activities On Illinois Street Will Be Performed During The Day including but not limited to: Curb & Gutter Replacement,
Structure Adjustments, Detector Loop Replacement, Longitudinal Joint Sealant, Thermoplastic Pavement Markings, Bituminous Materials
(Tack/Prime)
Payment Terms:
NET DUE IN 30 DAYS UPON COMPLETION.
ACCEPTED:
The above prices, specifications and conditions are satisfactory and
are hereby accepted.
Buyer:
Signature:
Date of Acceptance:
7/14/2026 1:42:25 PM
CONFIRMED:
K-Five Construction
Authorized Signature:
Estimator: Will Jennings