R-59-26 Authorizing Police Department Roof Replacement74d 418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Authorizing Police Department Roof Replacement DATE: July 13, 2026 SUMMARY/BACKGROUND Village staff receive three (3) quotes for a roof replacement at the Police Department. The roof is 20 years old and has had multiple leak repairs in the last few years. Alder Roofing and Sheet Metal Inc. provided the low quote amount of $223,035.00. ANALYSIS This project was identified in the 5-year Capital Improvement Program and $250,000.00 is included in the FY27 Property Maintenance and Capital Equipment Fund. Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass A Resolution Authorizing Police Department Roof Replacement BOARD ACTION REQUESTED Pass A Resolution Authorizing Police Department Roof Replacement ATTACHMENTS A Resolution Approving Police Department Roof Replacement.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R-5'1 -26 A RESOLUTION APPROVING POLICE DEPARTMENT ROOF REPLACEMENT JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk SAMUEL J. FORZLEY JANELLE KITTRIDGE KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on , ~2026 RESOLUTION NO. R-�-26 A RESOLUTION APPROVING POLICE DEPARTMENT ROOF REPLACEMENT WHEREAS it has become necessary for the Police Department roof to be replaced; and WHEREAS, in connection with the work to be conducted on the replacement of roofing areas on the Police Department, the Village has researched and evaluated available options and contractors; and WHEREAS, upon review by Village staff, Adler Roofing and Sheet Metal, Inc, 779 Joyce Road, Joliet, IL 60436, provided the lowest proposal price. Adler Roofing proposed an alternative roofing solution that staff recommends the Village accept. The amount not to exceed is $223,035.00.; and WHEREAS, Section 5/8-9-1 of the Illinois Municipal Code (65 ILCS 5/8-9-1) allows the Board of Trustees of the Village ("Village Board"), upon a vote of two-thirds of the trustees then holding office, to waive the requirements for competitive bidding; and WHEREAS, The Village Board has determined that it is advisable, necessary, and in the best interest of the Village to waive competitive bidding and authorize the Police Department roof replacement for $223,035.00. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: Incorporation Recitals. The foregoing findings and recitals are hereby adopted as Section One of this Resolution and are incorporated by reference as if set forth verbatim herein. SECTION 2: Waiver of Public Bid Requirements and Authority to Purchase. The Village Board hereby waives the competitive bidding requirements otherwise applicable to the Police Department roof replacement by Adler Roofing and Sheet Metal, Inc. at a price not to exceed $223,035.00 as Exhibit A. SECTION 3: The Village Administrator or his designee is hereby authorized to execute any documents and take any other steps necessary to complete the Police Department roof replacement by Adler Roofing and Sheet Metal, Inc.at a price not to exceed $223,035.00 and to otherwise carry out this Resolution. SECTION 4: This Resolution shall be in full force and effect from and after its passage and approval as provided by law. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONTY UNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS --1 ?7 DAY OF � 2026. PRESIDENT AND VILLAGE BOARD MEMBERS: AYESNAYES Samuel J. Forzley Janelle Kittridge Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: �4m kft �VYVI/ I 1�em CHARLENE M. SMOLLEN V�illiage Clerk 01 eyv— ABSENT: ABSTAIN: 01 JOHN EGOFSKE President It L I WZ�* Exhibit A Adler Roofing and Sheet Metal, Inc. Proposal Exhibit B Waukegan Roofing Co., Inc. Exhibit C Anthony Roofing Tecta America Proposal Exhibit D Solaris Roofing Solutions Inc. Proposal ROOFING AND SHEBT METAL INC. 779.1ovee Road Phone 815/773-1200 Juliet, Illinois 60436 Fax 815/773-1207 Lemont Police Station 14600 E. 12711 Street Lemont IL We propose to complete the following scope of work on the main flat, mechanical room and shingle roof: BASE BID 1: TPO Recover • Provide all safety equipment necessary to complete all work following OSHA guidelines and regulations • All work completed by Union Employees • Peel existing membrane from the entire roof surface, boxes, and walls • Mechanically fasten a new'/z' HD Recovery Board • Install a 60 — Mil white TPO roof system, induction -welded • Remove and replace all perimeter counterflashing — collection boxes and downspouts to remain • All penetrations and accessories to follow the manufacturer's specifications • Remove the existing asphalt shingle system down to the wood deck • Install GAF Timberline HDZ total system • GAF Weatherwatch ice and water shield and felt buster to be installed on the deck • All flashing, boots, and drip edge metal to be replaced • All hoisting of debris and materials are included • 20—Year Manufacturer NDL Warranty — Elevate Flat Roof • 40 — Year Manufacturer Commercial Warranty — GAF Sloped Roof • 2—Year J. L. Adler Roofing Workmanship Warranty Price for this Work: $ 223,035.00 BASE BID 2: 90 Mil EPDM Full Tear Off • Provide all safety equipment necessary to complete all work following OSHA guidelines and regulations • All work completed by Union Employees • Peel existing membrane from the entire roof surface, boxes, and walls and remove existing insulation • Install two layers of 2.6 insulation • Install saddles to achieve water drainage at exterior walls • Mechanically fasten a new'/Z" HD Recovery Board • Install a 90 Mil fully adhered EPDM • Remove and replace all perimeter counterflashing— collection boxes and downspouts to remain • All penetrations and accessories to follow the manufacturer's specifications • Remove the existing asphalt shingle system down to the wood deck • Install GAF Timberline HDZ total system GAF Weatherwatch ice and water shield and felt buster to be installed on the deck All flashing, boots, and drip edge metal to be replaced • All hoisting of debris and materials are included • 30—Year Manufacturer NDL Warranty — Elevate Flat Roof 40 — Year Manufacturer Commercial Warranty — GAF Sloped Roof 2—Year J. L. Adler Roofing Workmanship Warranty Price for this work: $ 394,180.00 BASE BID 3: 90 Mil EPDM Recover • Provide all safety equipment necessary to complete all work following OSHA guidelines and regulations All work completed by Union Employees Peel existing membrane from the entire roof surface, boxes, and walls • Install saddles to achieve water drainage at exterior walls Mechanically fasten a new'/2" HD Recovery Board Install a 90 Mil fully adhered EPDM • Remove and replace all perimeter counterflashing— collection boxes and downspouts to remain All penetrations and accessories to follow the manufacturer's specifications Remove the existing asphalt shingle system down to the wood deck Install GAF Timberline HDZ total system • GAF Weatherwatch ice and water shield and felt buster to be installed on the deck All flashing, boots, and drip edge metal to be replaced • All hoisting of debris and materials are included • 30—Year Manufacturer NDL Warranty — Elevate Flat Roof • 40 — Year Manufacturer Commercial Warranty — GAF Sloped Roof 2—Year J. L. Adler Roofing Workmanship Warranty Price for this work: $ 317,910.00 Exclusions: Permit, fees, deck replacement, wood replacement watthew AdCer Adler Roofing Vice President 815-773-1200 Office 815-773-1207 Fax Matt.adler@adlerroofing.com 0GW — d Gr ndy Clallonoulon ofN RCA WAI and Grundy Counties c„•a waa EST i 9 1 4 EAU ELAN ROOFINGIN . Date: June 3, 2026 Bill To: Village Of Lemont Police Station 418 Main St Lemont, II Attention: Randy Earnest Phone: 630-816-2571 Email: rearnest@lemont.il.us Project Name: Shingle roof replacement and low slope roof recover@ 418 Main St Lemont, II 956 Campus Drive . Mundelein, Illinois 60060 Phone: 847-623-1625 • Fax: 847-623-4847 IL License #104-000761 Our Proposal is based on the information shown below and on the following pages all inclusive: • This Proposal if accepted is to be signed and attached as a Rider to Your firms Contract Documentation • The Proposal Price shown is good for 30 days from the date shown at the top of the page. o After that date we retain the right to ad iust our prices based on current market conditions at the time. • This Proposal is based on the information obtained from plans, specifications and addenda as noted above. This proposal price is based on our standard insurance coverage which is described herein. This proposal is based on one (1) mobilization to start the project and continue through until completion. o Multiple trips and / or mobilizations will result in additional charges. If additional work is requested or required, said work shall be charged as an extra in addition to the Proposal Price shown below. Low Slope Roofing Installation Scope of Work: Waukegan Roofing Co., Inc. (referred to herein as contractor) propose to supply Roofers' Union Local 11 labor, the necessary tools, equipment, and materials to install over the existing roof a new roofing system complete and new sheet metal flashings as described below for the existing Commercial Building with an approximate Roof Area of (17,800) • Supply and install the following .060 TPO roofing system with a 20-year Roofing System Warranty per the most current printed instructions, details and recommendations of the roofing materials manufacturer and the National Roofing Contractors Association. Roof Hatch o Supply new TPO flashings at one existing roof hatch. • One (1) walk pad at roof hatch is included %:" Cover board o Install 1(1) layer of %2" thick high density coated cover board over the entire roof surface mechanically fastened in place using heavy duty insulation plates and heavy-duty fasteners. o Supply and install new flashings at all existing scuppers o Supply and install a new .060 TPO membrane mechanically fastened in place at all seams and end laps. o All of the existing exhaust fans, pipes, RTU's and roof penetrations will receive new .060 TPO flashings. o Remove the broken siding, and replace with new Fiber cement board, approximately three pcs. Roofing System Warranty / Roof Maintenance o Manufacturer's 20- year Roofing System Warranty for roofing labor and material is included. o Waukegan Roofing Co., Inc. 2-year Workmanship Warranty, which is the exclusive remedy is included. o Waukegan Roofing Co., Inc. 2-year Annual Scheduled Roof Maintenance Program included. Sheet Metal o Supply and install 24-gauge prefinished steel roof related sheet metal flashings with a Kynar 500 20-year paint finish in any one of manufacturer's standard colors. Installing roofs, you can rely on since 1914! E S T 1 9 1 4 WAUKEGAH ROOFING N{- 956 Campus Drive • Mundelein, Illinois 60060 Phone: 847-623-1625 • Fax: 847-623-4847 IL License 4104-000761 Supply and install new Prefinished steel slip flashing counter flashing along all the existing inside parapet walls. • Premium Colors, Metallic Colors, Clear Coat Acrylic Finish Products are available at an additional charge to the Base Proposal Price shown below. • Wood blocking, backing, leveling devices or hat channels are specifically not included Base Proposal Price for the work described above is $ 226,000.00 Initials Asphalt shingle Steep Slope Roof replacement: Waukegan Roofing Co., Inc. proposes to supply the: • Labor, insurance, materials, tools, and equipment required to remove the existing layer of roofing shingles, underlayment felts and vents down to the roof deck. • We will remove the roofing related debris from the jobsite and properly dispose of it in a State registered landfill. • Asphalt Saturated Felt Underlayment will be installed on the remaining roof deck not previously covered with ice and water shield • Ice & water shield to be install in two courses for a total of six feet at the gutter edges. • Ice & water shield to be install in one course at the valleys areas for a total of three feet. • CertainTeed Swift Start Self Sealing starter strip shingles will be installed where required. • CertainTeed Landmark" Shingles with a Limited Lifetime material warranty will be installed along with matching CertainTeed Shadow Ridge— hip and ridge shingles • The following products will also be installed in conjunction with the products listed above: o Supply and install new roof to wall flashings where required. o Supply and install new Air vent Ridge vent Shingle vent II in all the same locations. o New 4x4x8 flashing tins at all the roof to wall intersections. • CertainTeed 3-Star SureStart— Warranty is included in this proposal. • Waukegan Roofing Co., Inc. 2-year Workmanship Warranty is included in this proposal Base Proposal Price for the work described above is $121,132.00 This Proposal Price is based on the following: • This proposal, if accepted, is the Contract Document • The prices set forth in this proposal are good for 30 days from the date shown at the top of this page. • Prior to finalizing any proposal documents after that date may be cause for these proposed prices to be increased to reflect the additional material and transportation costs extended to the contractor. Duties and Rights of Contractor: • Waukegan Roofing Co., Inc. (herein known as contractor) duties and rights in connection with the specific project address as described on page one herein is as follows: o Responsibility for and supervision of work: o The contractor shall be solely responsible for all roofing and related work described above in this contract document including the techniques, sequences, procedures and gives it all the attention necessary for such proper supervision and direction. c Furnishing of the tools, equipment, labor, and materials: o The contractor shall provide and pay for all tools, equipment, labor, material and all other facilities and services necessary for the proper completion of all work specified and described above in this contract document. c Clean up: Installing roofs, you can rely on since 1914! E S T 1 9 1 4 WAUKECxAr4 �t00FiNGNC. 956 Campus Drive • Mundelein, Ittinois 60060 Phone: 847-623-1625 . Fax: 847-623-4847 IL License 9104-000761 o The contractor agrees to keep the work area and adjoining areas free of waste material and rubbish caused by their work. o All cleanup of roofing related debris will be contained onsite daily and properly disposed of as needed and upon completion of all work as described herein in a State Registered Landfill. o Contractor further agrees to remove upon completion of the project all tools, equipment, and surplus materials. o To the fullest extent permitted by law, the Owner agrees to indemnify and hold harmless Contractor, its employees, and agents from and against all claims, damages, losses, and expenses, including but not limited to attorney fees, arising out of or resulting from the Owner's failure to perform obligations under this Contract. Insurance: • Our standard Insurance Coverage is included as stated below: • $2,000,000.00 General Liability Coverage • $1,000,000.00 Automobile Liability • $10,000,000.00 Excess / Umbrella Liability • $ 500,000.00 Workers Compensation and Employers' Liability • Contractors Liability Insurance: o The contractor agrees to keep in force at its own expense during the entire period of time required to complete the roofing project described herein such liability insurance as described above to protect them from claims under workers compensation and other employee benefit laws, for bodily injury and death, and such property damage that may arise out of work under this contract, such insurance shall include contractual liability insurance applicable to contractors obligations under this contract. All claims of property damage must be reported to contractor within 5 days of completion of the work described in this contract. Owners Liability Insurance: o The owner agrees to maintain in force their own liability insurance during the entire course of this roofing project and reserves the right to purchase such additional insurance as in their opinion is necessary to protect them against claims arising out of the contractor's operation. • Property Damage Insurance on the work site: o The owner agrees to maintain at their own expense during the entire course of this roofing project property damage insurance on the work site to its full insurable value including interests of the owner, contractor and subcontractors against fire, vandalism and other perils ordinarily included in extended coverage, losses under such insurance will be adjusted with and made payable to the owner as trustee for the parties insured as their interests appear. • Waiver of work site property damage claims to extent of insurance coverage: o The owner and contractor hereby waive all claims against each other for fire damages from other perils covered by insurance provided in subdivision (D) of this paragraph. Disclaimer • Contractor is not responsible for its inability to perform, or delays caused by acts of God, labor disputes or strikes, war, riots, weather conditions, material availability shortages, public authorities, or other cause and casualties beyond its reasonable control and delays due to owner's conduct. Guarantee • All work completed by Waukegan Roofing Co., Inc.'s own employees in conjunction with this contract shall be covered for a period of 2 years from the date of completion as explained and described in the Waukegan Roofing Co., Inc. Workmanship Warranty. • The Roofing System Manufacturer (the manufacturer of the roofing materials used in conjunction with this contract) shall issue their own Warranty to the owner as described above in the Contract document. Conditions: • In the event of any conflict between this Proposal/Contract and any plans, specifications, or other documents, the terms of this Proposal/Contract shall control. • Proper, safe, and adequate jobsite access shall be provided by the Authorized Signee / Owner at no cost or expense to Waukegan Roofing Co., Inc. for the duration of time required to complete this roofing project. • All roofing related materials will be delivered to and stored on the jobsite. Installing roofs, you can rely on since 1914! E S T 1 9 1 4 WAUIA(EC;AN ROOFINGIN. 956 Campus Drive . Mundelein, Illinois 60060 Phone: 847-623-1625 9 Fax: 847-623-4847 IL License #104-000761 • Pricing for this roofing project is based on regular working hours 6:30 am through 3:00 pm Monday through Friday • This roofing project is to be completed once started in one continuous operation weather permitting. • All existing and / or new roof penetrations, roof curbs, equipment rails and parapet walls shall be in place and 100% ready for the commencement of roofing related work prior to the start of this roofing project. • No extra work will be completed without receiving either prior written and/or verbal approval from the Authorized Signee /Owner or Owner(s) Authorized Agents agreeing to pay for the extra work in addition to the amount(s) shown on this contract proposal. • No oral statements or agreements shall modify this Contract. All changes must be authorized in writing by both parties prior to execution • Contractor shall provide and maintain all OSHA -mandated exterior safety measures, including but not limited to fall protection, warning systems, and safety supervision, as applicable to the work. Exclusions: • All details relating to this project in any way that are shown or detailed on any plans or sketches not provided to this contractor for the preparation of this proposal. • All specifications relating to this project in any way are explained, detailed, or specified on any plans or sketches not provided to this contractor for the preparation of this proposal. • All requirements of the roofing system design and the requirements of the roofing system to meet the any specific Building, Construction, Energy, Green, Electrical, Plumbing and/or the new 2012 ICC Energy Code requirements are the responsibility of the Authorized Signee / Owner, or a Design Professional employed by the Authorized Signee /Owner and is specifically not the responsibility of Waukegan Roofing Co., Inc. • All requirements of FM-1-52 wind uplift testing using the "bubble test" are specifically excluded and are by others at no cost or expense to Waukegan Roofing Co., Inc. and are specifically not included in this proposal price. • All plumbing, carpentry, roofing, sheet metal, roof deck, masonry, or brick, electrical and HAVC work not referenced above. • All additional insurance requirements not described herein. • Furnishing of any additional sheet metal flashings for skylights, roof hatches, mechanical roof mounted equipment curbs or equipment rails, portals or plumbing vent flashings not mentioned above. • Disconnection and / or reconnection of electrical, gas, HVAC condensate lines, unit heater flue pipes, flue pipes of any kind, television, telecommunication, satellite receiver or antennas of any kind not mentioned above. • Furnishing of all overflow drains, scuppers or conductors or downspouts of any kind not mentioned above. • Interior cleanup of any kind for any reason • Determination of the structural slopes or the structural integrity to accept the roofing system described above. • All OSHA safety requirements for safety protection of the interior because of rooftop openings and opened roof deck above the interior workspace • All demolition work not referenced above. • Testing, removal, and disposal of all asbestos containing materials. • Building Permits, Street or Sidewalk Permits, Crane or Lifting Permits, Payment, or Performance Bonds • Snow or Ice removal Time and Material Rates/Unit Pricing for Extra Work Requested or Required and Not Specified Above • Waukegan Roofing Co., Inc. Employee Labor including taxes, fringe benefits, insurance, overhead and profit at $185.00 per hour per man. • Materials at cost plus 15% markup • Subcontractors (if any are required) at cost plus 15% markup. Payment Terms and Conditions: • Upon acceptance of this Proposal / Contract as written and agreed to: • We need to receive back in our office: o One complete signed and initial copy of all the pages of this Proposal along with a Deposit equal to 1/3 d of the Proposal amount which will be due within 10 days of the date of the invoice. o Upon receipt of the signed documents and deposit our office will contact you with a proposed schedule date o It is important to understand that schedule dates are subject to change without notice due to weather conditions and previously scheduled production schedules. Installing roofs, you can rely on since 1914! E S T 1 9 1 4 WAU KC;AH RQVFFING.INC 956 Campus Drive + Mundelein, Illinois 60060 Phone: 847-623-1625 + Fax: 847-623-4847 IL License 4104-000761 + It is further understood, agreed, and accepted that the balance due shown in all pay applications presented according to the terms defined in the contract documents including all agreed to extra charges will be due in full within 30 days of the date of the invoice. • For projects that are ongoing month -over -month, progress invoices will be issued on a monthly basis for work completed to date. For projects of shorter duration or those completed within a single phase, the full invoice amount will be issued and due in full upon completion of the work. • Payments terms are "Net 30 Day from Invoice Date." If there is a failure to make payment with these agreed terms, Buyer is subject to finance charges of 1.5% per month, (18% per annum on any past due amounts. • The acceptance by Contractor of any payment after the specified due date shall not constitute a waiver of the Buyer's obligation to make further payments on the specified due dates. • If the Authorized Signee /Owner fails to pay pursuant to the Terms of this agreement and Waukegan Roofing Co., Inc., or its authorized legal representative elects to take legal action to collect all amounts owing, it is agreed and understood that: • The Authorized Signee / Owner shall be responsible for all interest accrued on the unpaid balance, collection costs and fees, including reasonable attorney fees, court costs, depositions and transcript costs, sheriff's fees, special process server fees and bond costs. • This transaction shall be governed by the: • Laws of the State of Illinois • Jurisdiction and venue for the hearing for any matter in dispute shall be with the Lake County Circuit Court of Illinois • The Authorized Signee / Owner by making final payment waives all claims except those arising out of • Faulty work appears after substantial completion. • Work that does not comply with these contract documents. • Outstanding claims of lien • Failure of Waukegan Roofing Co., Inc. to comply with any guarantees or warrantees. • All guarantees and warrantees are canceled if all payments are not made within the contract terms and conditions as stated herein. This Proposal, once signed by the Owner or Owner's authorized representative, shall constitute a binding Contract between the parties and may not be amended except in writing signed by both parties. We want you to know that all of us at Waukegan Roofing Co., Inc. are dedicated to your total satisfaction and that we know and understand what our role is in the process of maintaining and improving your building. Respectfully submitted, Waukegan Roofing Co., Inc. Project Manager Accepted Authorized Signee 2026 Authorized Signee's Printed Name & Title Installing roofs, you can rely on since 1914! ANTHONY ROOFING TECTA AMERICA June 17, 2026 Mr. Ted Friedley Procurement / Budget Coordinator Village Of Lemont Public Work Department 16680 New Avenue Lemont, IL. 60439 RE: Village of Lemont Police Department 14600 127t" Lemont. IL. 60439 Re -roofing Applications Dear Ted, Thank you for the opportunity to present this proposal for your upcoming roofing project. We understand that this represents a significant investment for your organization, and we have included information we believe will help support a well-informed and confident roofing decision. Anthony Roofing, a Tecta America company, is well known throughout the industry and is recognized as one of the leading commercial roofing contractors in this market. Our reputation has been built on quality workmanship, decades of experience, innovative roofing solutions, and a consistent commitment to customer satisfaction. Beyond roofing systems themselves, one of the most critical aspects of today's construction environment is safety. As part of Tecta America, we are proud to maintain an EMR rating of 0.59, a reflection of our strong safety culture and our commitment to protecting both our workforce and our clients. Equally important is our focus on quality. We are pleased to offer on -site visits to view work in progress, as well as project references, upon request. We sincerely appreciate this opportunity and look forward to providing you with the highest level of safety, quality roofing systems, service, and ongoing support. Sincerely, ANTHONY ROOFING TECTA AMERICA LLC. Scott R. Slagle Vice President of Sales ssiagie@tectaamerica.gom C: (630) 514-5550 Anthony Roofing Tecta America LLC 1 2555 White Oak Circle, Aurora, IL 60502 1 630 898 4444 fas 630.898.4597 1 www tectaamerica corn ANTHONY ROOFING TECTA AMFRICA SCOPE OF WORK Date: June 17, 2026 To: Mr. Ted Friedley Procurement / Budget Coordinator Village Of Lemont Public Work Department 16680 New Avenue Lemont, IL. 60439 From: Mr. Scott R. Slagle ANTHONY ROOFING TECTA AMERICA LLC 2555 White Oak Circle Aurora, IL 60502 Project: Village of Lemont Police Department 14600 1271h Lemont. IL. 60439 Re -roofing Applications GENERAL: Anthony Roofing Tecta America LLC (from here on known as "Company") will: • Schedule a preliminary job conference. This meeting will be scheduled within a week of the anticipated start of the roofing application. The project's anticipated schedule of progress and any last-minute details will be addressed. The actual equipment set up, and storage areas will be pinpointed. • Have a full-time Company foreman continuously monitor all the roofing work and report daily to a Company project manager. • Provide a safe working environment in accordance with all applicable requirements and recommendations of the Occupational Safety and Health Act (OSHA). • Place portables toilets / dumpsters / bomber in areas approved by the facilities manager. • Place dumpsters / lifts / cranes, in area provided by facilities manager. • Provide our own or licensed crane or lift with the operator for lifting and removing various roofing related items to and from roof areas. • Supply a COI — Certificate of Insurance with additional insured per clients' request. • Have the manufacturer send an authorized representative to inspect the installation and issue a standard, 30-year labor and material warranty upon completion of this roof. • Deliver the Company's standard, 2-year, workmanship warranty upon completion and payment in full. • Daily cleanup to be performed as to where to large amounts of roofing debris or trash is not left on roof at the end of each workday. Anthony Roofing Tecta America LLC 1 2555 White Oak Circle, Aurora, IL 60502 1 630 898,4444 1 fax 630 898 4597 www.tectaamerica.com Page 1 of 8 -0 ANTHoNY ROOFING TECTA AMERICA ROOFING — FLAT ROOF AREAS: • Plan and coordinate tear -off operation down to existing roof deck with the installation of the new roof system to ensure the roof system will be watertight at the end of each day. The existing roof deck and insulation will not be exposed to the weather at the end of each workday. • Remove all deteriorated and loose composition base flashings from all the walls and curbs, remove all debris from the site, and legally dispose of the debris using a licensed waste hauler. • Inspect all wood nailers and insulation stops for deterioration. Any deteriorated wood nailers and/or insulation stops will be replaced with new pressure -treated wood. Wood replacement will be performed on a unit price basis. • Install two (2) layers of 2.6" polyisocyan u rate roofing insulation with standard facrer. The new insulation board will be mechanically fastened and installed according to the manufacturers 20-year warranted roofing specification. • Cover all the insulation laid each day with the roofing membrane. • Furnish and install a new EPDM "Single -Ply Roofing System," The EPDM membrane will be manufactured and supplied by one of the Top Teir manufacturers based on availability. Johns Manville, Firestone (Elevate), Carlisle, GAF. The membrane is a "Black," 90-mils, which will be adhered in a solvent base contact adhesive to the new insulation package. The membrane will be secured with 6" seam tape at laps and will meet 30-year warranty specifications. • Flash all roofing penetrations according to manufacturer's 30-year details. • Install new 90-mil EPDM at wall and curbs. • Install accessory items provided by major manufacturers according to specifications and details. All manufactured accessories supplied by the manufacturer are included in the manufacturer's 20-year, labor, and material warranty. SHEET METAL: • Remove and install new scupper box, collector head, and downspouts in 24-gauge prefinished. • Existing siding and counterflashing to remain, install new 24-gauge 4"-6" pre -finished metal slip flashing at walls. • All other finished metals to remain in place. • Provide all prefinished sheet metal in a color to be selected from the manufacturer's standard color chart and prefinished in Kynar baked on factory finish with 20-year warranty. ACCESSORIES: • Install EPDM walk pads at service side of RTU units, roof hatch location and at each downspout location off shingle roof. • Install EPDM walk pads in same patch area as existing. Anthony Roofing Tecta .America LLC i 1555 White Oak Cirde, Aurora; IL 60502 1 630,998 4444 ( fax 630 898,4597 ; www,tectaamerica corn Page 2 of 8 00000 ANTHONY ROOFING TE.CTA AMERICA SAFETY: • Set up and approved ladder for outside roof access. • When working on site Anthony Roofing will use a safety flag system installed around building work zone area and or perimeter per OSHA guidelines. • Install Ladder Up post at existing access ladder at roof hatch access. HVAC — MECHANICALS: • Provide labor and materials from licensed union trade mechanical contractor for the following as needed to isolate and locate electrical circuit to provide a safe working environment following OSHA standards for this scope of work. • Reclaim refrigerant from ACCU-1 and ACCU-2, save refrigerant for recharging each unit. • Disconnect and raise refrigerant piping to allow for new roof insulation height, and re -install piping. • Disconnect line and low voltage wiring for ACCU-1, ACCU-2, RTU-1, and RTU-2, install hard pipe in -lieu of flex whip to allow for roofing to be installed. • Demo and remove failed roof duct insulation. • Remove Roof duct from RTU-1 and RTU-2 to allow for new roof install, supply new custom sheet metal transitions and duct supports to accommodate new roof height, re -install saved duct work. • Roof Duct to be externally wrapped with 2" thick fiberglass board and Venture Clad. • Isolate natural gas piping, raise all piping on roof for new roof insulation thickness. • AC work to be performed in phases so department is not completely without ventilation, if needed we can quote temporary cooling, but not included. There might be a need to bring in temporary cooling for IT equipment if it is conditioned by RTU's. ELECTRICAL: • As needed for mechanical work. PLUMBING: • All or any existing drain ring, clamping bolts will be re -use. During the removal of the drain rings the bolts can break off. These will be replaced at no charge, If the drain ring itself is old, broken and brittle, they will be replaced on a unit price basis, see attached sheet. Anthony Roofing Zecta America LLC i 2555 White Oak Circle, Aurora, IL 60502 1 630 898 4444 i fax 630,898,4597 waA .Y.tectaamerica corn Page 3 of 8 100 ... �_00� ANTHONYROOFING TECTA AMERICA SHINGLE ROOF AREA: • Remove and Haul away all existing asphalt shingles and felt paper down to existing wood deck. • Replace deteriorated plywood deck at a unit price of $5.25 per sqft. in addition to contract price, if required. Provide & Install the following design building shingle application: • GAF Weatherwatch ice and water shield at 6' at eaves, 3' in valleys, 1 B" at all walls & penetrations. • GAF Feltbuster Synthetic felt over remainder of roof area. • GAF Timberline UHDZ architectural shingle system with all components. • Replace ridge vent with new ridge venting system. • Lead flashings for all plumbing vents. • 24-gauge prefnished metal w-valleys. • Re -use all existing sheet metal perimeter edge metal • All hoisting of material • GAF's 40-year standard commercial warranty. • Deliver the Company's standard, 2-year, workmanship warranty upon completion and payment. • All work will be completed per OSHA safety regulations on sloped roof areas. • Exclude all existing gutters, downspouts, on shingle roof slopes. GENERAL CONSTRUCTION: • The proposal is based on the existing decking meeting satisfactory fastener pull -out -test. • This proposal Does NOT Include permits. The application will be filed as required with the City or Village as required. • This proposal Does NOT include sales tax. • Operations, Project Managers and Foreman will address staging areas at pre -conference. • Provide dumpsters, hoisting, lift as needed to complete all scopes of work. 410 All work completed under Illinois prevailing wage act. Anthony Roofing lecta America LLC 2555 White Oak Circle, Aurora, 1L 60502 , 630.898.4444 fax 630 898,4597 1 www.tectaamerica com Page 4 of 8 ANTHONYROOFING TFCTA AMERICA UNIT PRICING: This is our general cost guide if additional items are requested by owners or not seen visible during time of roofing review, not all items listed may pertain to this project. Unit pricing includes removal, disposal, supplied and install. 2x Wood Nailers (rotten / damaged) Standard Wood Plank Decking Type "B" Galvanized Metal Decking Wet / Damaged Existing Polyisocyanu rate Insulation Drain Dome Replacement Only — Metal -- $ 12.75 per lineal foot -- $ 16.75 per lineal foot -- $ 14.75 per square foot. -- $ 6.75 per square foot -- $295.00 each. Drain Clamping Ring Only — Metal w/ new bolts -- $250.00 each. Roofing Labor -- $145.00 per hour Sheet Metal Labor EXCLUSIONS: -- $161.00 per hour These are general exclusions that may apply unless they are noted and specified in the scope of work above. All Tuckpointing and masonry are to be performed "by a party other than Company." Roof drains and their installation is "by a party other than Company." Disconnection and relocation of all existing heating, air conditioning, refrigeration units/piping, and gas piping are "by a party other than Company" prior to our mobilization on site. Reinstallation and reconnection of all existing heating, air conditioning, and/or refrigeration units are "by a party other than Company" after our demobilization from the site. All HVAC work is to be performed "bya partyotherthan Company" in complete accordance with current EPA regulations regarding chlorofluorocarbons. The company is not responsible for any HVAC unit operation, disconnection, relocation, installation, or reconnection, unless noted in scope of work, per section, per unit. • This proposal does not include walkways, saddles, curbs, wood nailers or blocking, skylights, roof hatches or smoke vents, gutters or downspouts, through -wall flashing, or any sheet metal not part of the roof, unless noted in scope of work, per section, per unit. • No interior protection or clean up included. The company shall not be responsible for damage incurred (a) due to nails or screws penetrating the roof deck, (b) anything secured or attached to the roof deck, joists, or (c) any other roofing structure member, which becomes loose, unsecured, or falls because of the roofing operations to the extend not caused or exacerbated by the actions or negligence of the Company, unless noted in scope of work, per section, per unit. • The following items are not included in this proposal unless otherwise specifically stated in writing: repairs to the roof deck, installation of wood or cant strips, furnishing or installation of sheet metal or roof drains, repairs, or alteration to the building other than the roof, identification, abatement and/or removal of asbestos containing or toxic material, or work preparatory or incidental to these items, unless noted in scope of work, per section, per unit. Anthony Roofing Tecta America LLC 1 2555 White Oak Circle, Aurora, IL 60502 1630 898.4444 1 fax 630. 898.-1597 ! wN�v.tectaamertca com Page 5 of 8 ANTHONY ROOFING TECTA AMERICA PRICING AND INVESTMENT ANALYSIS Date: June 17, 2026 To: Mr. Ted Friedley Procurement / Budget Coordinator Village Of Lemont Public Work Department 16680 New Avenue Lemont, IL. 60439 Project: Village of Lemont Police Department 14600 1271h Lemont. 1L. 60439 Re -roofing Applications Bid 1: - ROOFING — FLAT ROOF AREAS: $349,500.00 30-year system. Or Bid 1A OPTION: $325,200.00 20-yearsystem Bid 2: - HVAC — MECHANICALS: $154,400.00 Bid 3: - SHINGLE ROOF AREA: $ 86,800.00 GENERAL SITE ROOF AREA: A lower Mechanical Pit has no roofing inside "4" Anthony Roofing Tecta America LLC 12555 White Oak Circle, Aurora, IL 60502 i 630.898.4444 i fax 630.898.4597 i www.tectaamerica.com Page 6 of 8 �-�- ANTHONY ROOFING TFCT,A A,.MFRICA NOTES: All prices quoted are subject to requote if not accepted within 90 days of this proposal. Due to the instability of asphalt, oil, and other raw material prices, the Company can only protect prices for materials shipped within 30 days of this proposal. This proposal is subject to requite due to any material price increases after that time elapses. Customer warrants he/she has personally read and understands the terms and conditions on the following page of this proposal and that any contract between the parties is subject to these terms and conditions. ANTHONY ROOFING TECTA AMERICA LLC t By: Scott R. Slagle Date: June 17 2026 State License #104.015059 ACCEPTANCE: The Pricing, Scope of Work, Specifications, and Terms and Conditions included in this proposal are satisfactory and the Base Bid and/or Alternate Bid is/are hereby accepted. Customer authorizes the Company to perform the work as specified. Payment will be made as outlined herein. Mr. Ted Friedley Procurement / Budget Coordinator Village Of Lemont By: Authorized Signature Date: This proposal has been prepared by Anthony Roofing Tecta America LLC as a design -build recommendation based upon our site visit, observations, and review of the existing roofing systems, assemblies and conditions.. The information, scope of work, recommendations, details, methodologies, and pricing contained herein are proprietary and confidential. This proposal is provided solely for the purpose of evaluating the recommended roofing improvements for this specific project. No portion of this proposal may be copied, reproduced, distributed, disclosed, duplicated, or utilized in whole or in part for any other bidding opportunity, competitive procurement process, scope development orconstruction project without the express written consent of Anthony Roofing Tecta America LLC. This proposal and its contents are protected by applicable copyright laws and intellectual property rights. Unauthorized use, replication, dissemination, Al generation is strictly prohibited. Anthony Roofing Tecia America LLC ; 2555 White Oak Circle, Aurora, (L 60502 1 630.898.4444 1 fax 630 898A597 1 www.wctaamerica corn Page 7 of 8 TERMS AND CONDITIONS 1. Nature of Work. Anthony Roofing Tecta America LLC ("Contractor') shall furnish the labor and material to perform the work described herein or in the referenced contract documents. The contractor does not provide engineering, consulting, or architectural services. It is the Owner's responsibility to retain a licensed architect or engineer to determine proper design and code compliance. The contractor is not responsible for structural integrity and design. including compliance with codes. if plans. specifications, or other design documents have been furnished to the Contractor. the Customer warrants that they are sufficient and conform to all applicable laws and building codes. The contractor is not responsible for loss, damage, or expense due to defects in plans or specifications or building code violations unless such damage results from a deviation by the contract documents. Customer warrants an structures to be in sound condition capable of withstanding normal roofing construction equipment and operations. Contractor is not responsible for location of roof drains, adequacy of drainage or ponding on the roof. 2. Work Not Included. Unless specifically stated on the face of this proposal, no repairs to the roof deck, installation of wood strips or cam strips. furnishing and application of sheet metal work or roof drains, repairs. or alterations to the building, or other items not stated on the face of this proposal are included in this contract. 3. Asbestos and Toxic Materials. This proposal and contract is based upon the work to be performed by Contractor not involving asbestos -containing or toxic materials and that such materials will not be encountered or disturbed during the course of performing the roofing work. The contractor is not responsible for expenses, claims or damages arising out of the presence, disturbance, or removal of asbestos -containing or toxic material, In the event that such materials are encountered. Contractor shall be entitled to reasonable compensation for all additional expenses incurred as a result of the presence of asbestos -containing or toxic materials at the work site. 4. Insurance. The contractor shall carry the worker's compensation, automobile liability, commercial general liability, and such other insurance as required by law. The contradorwill furnish a Certificate of Insurance, evidence the types and amounts of its coverages, upon request. The customer shall purchase and maintain builders risk and property insurance, uponthe full value of the entire Project including the labor, material and equipment furnished by the Contractor, covering fire, extended coverage, windstorm, vandalism and theft on the premises to protect against loss or damage to material and equipment and partially completed work until the job is completed and accepted and Contractors equipment is removed from the premises. 5. Additional Insured. If Customer requires and Contractor agrees to name Customer or others as an additional insured on the Contractor's liability insurance policy, Customer and Contractor agree that the naming of the Customer or other parties as an additional insured is intended to apply to claims made against the additional insured to She extentthe claim is due to the negligence of Contractor and is not intended to make the Contractor's insurer liable for claims that are due to the fault of the additional insured. 6. Changes in the Work and Extra Work. The customer shall be entitled to order changes in the Work and the total contract price adjusted accordingly. Any penetrations through the roofing to be installed by Contractor not shown on the plans provided to the Contractor prior to submittal of this proposal shall be considered an order for extra work. Any carpentry work required to replace rotten or missing wood or deteriorated decking shall be done on a labor and material basis at an extra unless specifically included in the Scope of Work section. 7. Availability of Site. The contractor shall be provided with direct access to the work site for the passage of trucks and materials and direct access to the roof. Contractor shall not be required to begin work until underlying areas are ready and acceptable to receive Contractor's work and sufficient areas of roof deck are available and free from dirt, snow, ice, water, or debris to allow continuous full operation until job completion, The expense of snow, ice, water or debris removal and any extra trips by Contractor to thejob as a result of thejob not being ready for roof application after Contractor has been notified to proceed will be charged as an extra. 8. Stte Conditions. Contractor shall not be responsible for additional costs due to the existence of utilities. wet insulation, deteriorated deck or other subsurface or latent conditions that are not disclosed in writing to Contractor. The raising. disconnection, or re -connection of any mechanical equipment on the roof that may be necessary for Contractor to perform the roofing work shall be performed by others or treated as an extra. 9. Price Volatility. Asphalt, steel products, isocyanurate, and other roofing products are sometimes subject to unusual price volatility due to conditions that are beyond the control or anticipation of Contractor. If there is a substantial increase in these or other products between the date of this proposal and the time when the work is to be performed, the amount of this proposal/contract may be increased to reflect the additional cost to the contractor, upon submittal of written documentation and advance notice to Customer. 10. Fumes and Emissions. Owner and Contractor acknowledge that asphalt may be heated by Contractor, odors and emissions from roofing products will be released and noise will be generated as part of the roofing operations to be performed by Contractor. Customer shall be responsible for interior air quality, including controlling mechanical equipment, HVAC units, intake vents, wall vents, windows. doors. and other openings to prevent fumes and odors from entering the building. Customer is aware that roofing products emit fumes, vapors, and odors during the application process. Customer shall hold Contractor harmless from claims from third parties relating to fumes and odors that are emitted during the normal roofing process. 11. Back Charges. No back charges or claims for payment of services rendered or materials and equipment furnished by Customer to Contractor shall be valid unless previously authorized in writing by Contractor and unless written notice is given to Contractor within ten (10) days of the event, act or omission which is the basis of the back charge. 12. Damages and Delays. Contractor will not be responsible for damage done to Contractor's work by others. Any repairing of the same by Contractor will be charged at regular scheduled rates over and above the amount of this proposal. Contractor shall not be responsible for loss, damage or delay caused by circumstances beyond its reasonable control, including but not limited to acts of God, weather, accidents. fire, vandalism, strikes, jurisdictional disputes, failure or delay oftransportation, shortage of or inability to obtain materials, equipment, or labor; changes in the work and delays caused by others. In the event of these occurrences. Contractors time for performance under this proposal shall be extended for a time sufficient to permit completion of the Work. 13, Electrical Conduit. Contractor's price is based upon there not being electrical conduit or other materials embedded within the roof assembly unless expressly identified on the face of this proposal. Customer will Indemnity Contractor from any personal injury, damage, claim, loss, or expense resulting from the presence of electrical conduit, shall render the conduit harmless so as to avoid injury to Contractor's personnel, and shall compensate Contractor for additional time, labor and expense resulting from the presence of such materials. 14. Right to Stop Work. The failure of Customer to make proper payment to Contractor when due shall entitle Contractor. at its discretion, to suspend all work and shipments, including furnishing warranty, until full payment is made or terminate this contract. The contract sum to be paid Contractor shall be increased by the amount of Contractors reasonable costs of shut -down. delay and start-up. 16, Interior Protection. Customer acknowledges that re -roofing of an existing building may cause disturbance, dust, or debris to fall into the interior and, if hot asphalt or pitch is used, drippage may occur depending upon deck conditions. Customer agrees to remove or protect property directly below the roof in order to minimize potential interior damage. Contractor shall not be responsible for disturbance, damage, clean-up, orloss to interior property that Customerdid not remove or protect prior to commencement of roofing operations. Customer should notify tenants of re -roofing and the need to provide protection underneath areas being re -rooted. Customer agree to hold Contractor harmless from claims of tenants who were not so notified and did not provide protection. 16. Working Hours. This proposal is based upon the performance of all work during Contractor's regular working hours. Extra charges will be made for overtime and all work performed other than during Contractors regular working hours, if required by Customer. 17. Warranty. Contractors work will be warranted by Contractor in accordance with its standard warranty, which is made a part of this proposal and contract and incorporated by reference. A copy of Contractors standard warranty is attached or, if not, will be furnished upon request. Contractor SHALL NOT BE LIABLE FOR SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES. The acceptance of this proposal by the Customer signifies his agreement that this warranty shall be and is the exclusive remedy against Contractor for all defects in workmanship furnished by Contractor. A manufacturer's warranty shall be furnished to Customer if a manufacturers warranty is called for on the face of this proposal, It is expressly agreed that in the event of any defects in the materials furnished pursuant to this contract, Customer shall have recourse only against the manufacturer of such material. 18. Tolerances. All materials and work shall be furnished in accordance with normal Industry tolerances for color, variation. thickness. and size, weight, amount, finish, and texture and performance standards. Specified quantities are intended to represent an average over the entire roof area. 19, Mold. Contractor and Customer are committed to acting promptly so that roof leaks are not a source of potential interior mold growth. Customerwill make periodic inspections forsigns of water intrusion and ad promptly, including notice to Contractor if Customer believes there are roof leaks, to correct the condition. Upon receiving notice. Contractor will make repairs promptly so that water entry through the roofing installed by Contractor is not a source of moisture. Contractor is not responsible for indoor air quality, mold, mildew, or any alleged Injury resulting from therefrom, Owner shall hold harmless and indemnify Contractor from claims due to poor indoor air quality and resulting from a failure by Owner to maintain the interior of the building in a manner 10 avoid growth of mold. 20. Material References. The contractor is not responsible for the actual verification of technical specifications of product manufacturers: i.e.. R value or ASTM or UL compliance, but the materials used are represented as such by the material manufacturer. 21. Arbitration. If a dispute shall arise between Contractor and Customer with rasped to any matters or questions arising out of or relating to this Agreement or the breach thereof, such dispute shall be decided by arbitration administered by and in accordance wilh the Construction Industry Arbitration Rules of the American Arbitration Association. This Agreement to arbitrate shall be specifically enforceable under the prevailing arbitration law. The award rendered by the arbitrators shall be final, and judgment may be entered upon it in any Court having jurisdiction thereof. Any legal claim against Contractor, including a claim alleging any breach of this contract or negligence by Contractor must be initiated no later than two (2) years after Contractor completed roof installation. Collection matters may be processed through litigation or arbitration at the discretion of the Contractor. Anthony Roofing Tecta America LLC , 2555 White Oak Circle, Aurora, IL 60502 1 630.898.4-144 , fax 630-89&4597 � www tectaamerica.com Page 8 of 8