Loading...
R-41-26 Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for PW Annex Site Construction Engineering418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for PW Annex Site Construction Engineering DATE: April 27, 2026 SUMMARY/BACKGROUND HR Green is assisting the Village with construction engineering for the final phase of the construction work at the Public Works Annex Site (12421 Archer Avenue). Work shall include but is not limited to site grading, curb & gutter installation, hot -mix asphalt paving, site lighting, water and sewer connections for pole barn structure, and construction of concrete walls for material storage. The time and material, not to exceed, fees for the project are $69,750.00. ANALYSIS Funds are included in the FY27 Water and Sewer CIP Budget for this project Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for PW Annex Site Construction Engineering BOARD ACTION REQUESTED Pass A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for PW Annex Site Construction Engineering ATTACHMENTS A Resolution Approving Professional services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for PW Annex Site Construction Engineering.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R-q 1 -26 A RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR PW ANNEX SITE CONSTRUCTION ENGINEERING JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk SAMUEL J. FORZLEY JANELLE KITTRIDGE KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont onq -71026 RESOLUTION NO. R-_�L-26 A RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR PW ANNEX SITE CONSTRUCTION ENGINEERING WHEREAS the Village of Lemont, Counties of Cook, Will, and DuPage, Illinois, ("the Village") is a municipality in the State of Illinois with full powers to enact Ordinances and adopt Resolutions for the benefits of the residents of the Village; and WHEREAS, the Village and HR Green, Inc. wish to enter a professional services agreement PW Site Annex Construction Engineering as further outlined in the professional services agreement attached hereto as Exhibit A ("Agreement"); and WHEREAS, the Mayor and Board of Trustees find that it is in the best interests of the Village to authorize the Agreement attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety. SECTION 2: The Mayor and Board of Trustees of the Village of Lemont hereby approve the Agreement with HR Green, Inc. in substantially the same form as attached hereto as Exhibit A, subject to attorney review. SECTION 3: The Mayor and Clerk are hereby authorized, respectively, to execute the Agreement with HR Green, Inc. SECTION 4: This Resolution, and its parts, are declared to be severable and any section, subsection, sentence, clause, provision, or portion of this Resolution that is declared invalid such decision shall not affect the validity of any other portion of this Resolution, which shall remain in full force and effect. SECTION 5: All Resolutions and Ordinances in conflict herewith are hereby repealed to the extent of such conflict. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS Zvi DAY OF j 2026. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES: Samuel J. Forzley Janelle Kittridge Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: 00 pal CHARLENE M. SMOLLEN Village Clerk O (VA j "lin0IS ABSENT: ABSTAIN: JOHN EGOFSKE President Exhibit A Professional Services Agreement for PW Site Annex Construction Engineering HRGreen. PROFESSIONAL SERVICES AGREEMENT For Lemont, IL - Public Works Annex Site Construction Engineering Village of Lemont Mr. George Schafer Village Administrator 418 Main Street Lemont, IL 60439 Ph: 630.257.1550 Bruce A. Hill, PE Municipal Executive — Municipal Services Engineering HR Green, Inc. 323 Alana Drive New Lenox, IL 60451 Ph: 815.462.9324 Project No. 2303726.01 April 23, 2026 Version 2.3 02052021 TABLE OF CONTENTS 1.0 SCOPE OF SERVICES 2.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT 3.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES 4.0 SERVICES BY OTHERS 5.0 CLIENT RESPONSIBILITIES 6.0 PROFESSIONAL SERVICES FEE 7.0 TERMS AND CONDITIONS Version2.3 02052021 Professional Services Agreement Lemont, IL Public Works Annex Site — Construction Engineering HR Green Project No.: 2303726.01 H RG Teen . April pPage 1 of 6 THIS AGREEMENT is between the Village of Lemont (hereafter "CLIENT") and HR Green, Inc. (hereafter "COMPANY"). 1.0 Project Understanding 1.1 General Understanding The CLIENT has identified this site as a great location for additional Public Works amenities such as a 1.75-million-gallon water tower, a salt dome, a pole barn, and other Public Works associated needs. This project is the completion of this multi -year site development and will complete the remaining site needs. 1.2 Design Criteria/Assumptions • IDOT Standard Specifications for Road & Bridge Construction • Village of Lemont Code 2.0 Scope of Services The CLIENT agrees to employ COMPANY to perform the following services: COMPANY will provide Construction Layout and Construction Observation Services on a time and material, not -to -exceed contract amount basis. The hours provided are based on 50 working days. Any additional work due to an extended schedule dictated by the contractor's performance or unanticipated work due to site conditions could warrant a contract addendum. The following is a breakdown of the various tasks associated with the construction observation which will be completed by COMPANY. A. Startup COMPANY will ensure that the project details, construction timelines, and any impacts that the project may create will be coordinated with the CLIENT prior to the start of construction. COMPANY will mark, measure, and document contract removal pay items prior to the contractor starting work. COMPANY anticipates a Construction Engineer will be onsite for approximately twenty (20) hours to complete the above noted coordination and construction preparation. A total of twenty (20) hours have been allotted to complete the project start up. Version2.3 02052021 Professional Services Agreement Lemont, IL Public Works Annex Site — Construction Engineering HR Green Project No.: 2303726.01 23,2026 H RGreen . AprHPage 2 of 6 B. Construction Layout COMPANY will be on -site to observe and verify that items being constructed and materials being utilized are in general conformance with the approved plans and specifications and the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction 1. Silt Fence — COMPANY shall stake the limits of the site perimeter silt fence at bend or end points. 2. Curb and Pavement — COMPANY shall stake the proposed back of curb or edge of pavement at bend or end points. 3. Concrete Pad — COMPANY shall stake the four (4) corners of the proposed concrete pad for the pole barn. 4. Light pole — COMPANY shall stake the center of each proposed light pole. 5. Detention Basin — COMPANY shall stake the limits of the proposed basin expansion. 6. Berm Grading — COMPANY shall stake the top and bottom grades of the proposed berm. COMPANY will utilize the For Construction plans prepared by COMPANY. Offset distances shall be coordinated with the contractor. It is assumed staking will take place in four (4) trips to the site with 48-hour notice required by the contractor. Any additional trips and/or re -staking will be billed on an additional T&M basis (see hourly rates). COMPANY anticipates a Surveyor will be onsite for approximately forty (40) hours to complete the above noted construction layout. A total of forty (40) hours have been allotted to complete the project start up. C. Construction Observation COMPANY will be on -site to observe and verify that items being constructed and materials being utilized are in general conformance with the approved plans and specifications and the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction. COMPANY will complete a daily diary, measure and document contract quantities, complete payment estimates, change orders, and weekly reports. COMPANY will verify that all materials incorporated into this project are IDOT approved and evidence of material inspection is in compliance with Special Provisions of this contract. COMPANY shall keep the CLIENT informed as to the progress of construction. COMPANY anticipates that a Construction Engineer will be onsite approximately fifteen (15) hours per week for approximately fifteen (15) weeks. An additional fifteen (15) hours total have been allocated to a Senior Project manager to provide support Version2.3 02052021 Professional Services Agreement Lemont, IL Public Works Annex Site — Construction Engineering HR Green Project No.: 2303726.01 April 23, 2026 HRGreen® Page 3 of 6 to the Construction Engineer during construction observation operations. A total of two -hundred forty (240) hours have been allotted for daily field construction observation for this project. D. Meetings COMPANY will attend the preconstruction meeting at the CLIENT with the contractor and subcontractors. A total of four (4) hours have been allotted for the Senior Project Manager to attend the preconstruction meeting and prepare the agenda and complete the meeting minutes for one (1) additional construction progress meetings. E. Administration/Coordination This task will involve the oversight of the project by management, which will include the on -going review of the project execution, documentation, schedule and budget, contract file management, and general correspondence between COMPANY, CLIENT, the contractor, and subcontractors. COMPANY has allotted eight (8) hours for the Senior Project Manager and administrative support for the project. F. Record Drawings COMPANY will prepare a Grading Plan Record Drawing Survey which will include contours of the modified detention basin. These features will be shown in red on the For Construction Grading Plan. COMPANY will also prepare a shapefile and enter it into the Village GIS with all of the utility information. COMPANY has allotted twenty (20) hours for the Surveyor to compile the record drawings and shapefile. G. Project Close Out COMPANY anticipates approximately forty (40) hours to complete the project closeout and final documentation for this project. This task includes the preparation of final job records, completion of punch list, final payment estimate, and final change order. H. Material Testing Seeco Consultants, Inc. will provide the Quality Assurance Material Testing Services for this project. Quality Assurance testing for asphalt and concrete shall be completed in accordance with IDOT QC/QA requirement. Disclaimer COMPANY shall not supervise, direct or have any control over the contractor's work. COMPANY shall not have any responsibility for the construction means, methods, techniques, sequences or procedures selected by the contractor. Also, COMPANY is not Version2.3 02052021 Professional Services Agreement Lemont, IL Public Works Annex Site — Construction Engineering HR Green Project No.: 2303726.01 April 23, 2026 H RC reen . Page 4 of 6 responsible for the contractor's safety precautions or programs in connection with this work. These rights and responsibilities are solely those of the contractor. COMPANY shall not be responsible for any acts or omissions of the contractor, subcontractor or any entity performing any portion or the work, or any agents or employees of any of them. COMPANY does not guarantee the performance of the contractor and shall not be responsible for the contractor's failure to perform its work in accordance with the contract drawings and documents. 3.0 Deliverables and Schedules Included in this Agreement 1. Notice to Proceed — NTP....................................................................................... May 2026 2. Contractor Start (Anticipated — T.B.D.)...................................................................May 2026 3. Project Completion Date........................................................................ November 30, 2026 This schedule shall be equitably adjusted as the project progresses, allowing for changes in the scope of the project requested by the CLIENT or for delays or other causes beyond the control of COMPANY. 4.0 Items not included in Agreement/Supplemental Services The following items are not included as part of this AGREEMENT (an additional agreement will be proposed for construction engineering once the low bidder has established their project schedule): • N/A Supplemental services not included in the AGREEMENT can be provided by COMPANY under separate agreement, if desired. 5.0 Services by Others Seeco Consultants, Inc. will perform the following services: Provide QA Testing Services 6.0 Client Responsibilities N/A 7.0 Professional Services Fee 7.1 Fees The fee for services will be based on COMPANY standard hourly rates current at the time the AGREEMENT is signed. These standard hourly rates are subject to change upon 30 days' written notice. Non -salary expenses directly attributable to the project such as: (1) living and traveling expenses of employees when away from the home office on business connected with the project; (2) identifiable communication expenses; (3) identifiable Version2.3 02052021 Professional Services Agreement Lemont, IL Public Works Annex Site — Construction Engineering HR Green Project No.: 2303726.01 April 23, 2026 H RG Teen ® Page 5 of 6 reproduction costs applicable to the work; and (4) outside services will be charged in accordance with the rates current at the time the service is done. 7.2 Invoices Invoices for COMPANY's services will be submitted, on a monthly basis. Invoices will be due and payable upon receipt in accordance with the Illinois Prompt Payment Act 50ILCS 505. If any invoice is not paid within these timelines, COMPANY may, without waiving any claim or right against the CLIENT, and without liability whatsoever to the CLIENT, suspend or terminate the performance of services. 7.3 Extra Services Any service required but not included as part of this AGREEMENT shall be considered extra services. Extra services will be billed on a Time and Material basis with prior approval of the CLIENT. 7.4 Exclusion This fee does not include attendance at any meetings or public hearings other than those specifically listed in the Scope of Services. These service items are considered extra and are billed separately on an hourly basis. 7.5 Payment The CLIENT AGREES to pay COMPANY on the following basis: Time and Material basis with a Not to Exceed fee: $69,750.00 8.0 Terms and Conditions This Agreement is an addendum to and is considered part of the Master Agreement between CLIENT and COMPANY. All terms and conditions contained in that agreement apply to this Agreement. Version2.3 02052021 Professional Services Agreement Lemont, IL Public Works Annex Site — Construction Engineering HR Green Project No.: 2303726.01 H RG reen ® ApPage 6 of 6 This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties signing and dating the AGREEMENT. Services will not begin until COMPANY receives a signed agreement. COMPANY's services shall be limited to those expressly set forth in this AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project except as agreed to in writing. The effective date of the AGREEMENT shall be the last date entered below. Sincerely, HR GREEN, EN, INC. Bruce A. Hill Municipal Executive — Municipal Services — Engineering Approved by: Printed/Typed Name: Timothy J. Hartnett Title: President — Municipal Services Date: 4/23/2026 VILLAGE OF LEMONT Accepted by: Printed/Typed Name: George Schafer Title: Village Administrator Date: t , J:\2023\2303726.01\Admin\Contract\Client\PSA 2303726.01 Lemont IL -Public Works Annex Site —Construction Engineering.docx Version2.3 02052021