Loading...
R-87-25 Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for CSO 003 Hydrodynamic Separator IEPA Project #3 Design Engineering:t rj-25' R; ry 418 Main Street Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for CSO 003 Hydrodynamic Separator IEPA Project #3 Design Engineering DATE: December 8, 2025 SUMMARY/BACKGROUND HR Green is assisting the Village with design engineering services for IEPA mandated project #3 Hydrodynamic Separator at the outfall designated as CSO 003. It is the combined sewer overflow route that runs to the Sanitary & Ship Canal. The time & material, not to exceed, fees for the project are $60,000.00. This project is already part of the FY26 budget and will come out of the Water Sewer Fund. ANALYSIS The CSO 003 Hydrodynamic Separator is consistent with the Village's 5-Year Capital Plan. $109,000.00 has been budgeted in FY26 for Design engineering for this project. This figure was a carryover amount given to the Village by Crawford, Murphy, & Tilly Engineering when they were the engineers managing the Village -wide IEPA permits. Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for CSO 003 Hydrodynamic Separator IEPA Project #3 Design Engineering BOARD ACTION REQUESTED Pass A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for CSO 003 Hydrodynamic Separator IEPA Project #3 Design Engineering ATTACHMENTS A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for CSO 003 Hydrodynamic Separator IEPA Project 3 Design Engineering.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R-]q-25 A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR CSO 003 HYDRODYNAMIC SEPARATOR IEPA PROJECT #3 DESIGN ENGINEERING JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk SAMUEL J. FORZLEY JANELLE KITTRIDGE KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on _-_-2025 RESOLUTION NO. R--25 A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR CSO 003 HYDRODYNAMIC SEPARATOR IEPA PROJECT #3 DESIGN ENGINEERING WHEREAS the Village of Lemont, Counties of Cook, Will, and DuPage, Illinois, ("the Village") is a municipality in the State of Illinois with frill powers to enact Ordinances and adopt Resolutions for the benefits of the residents of the Village; and WHEREAS, the Village and HR Green, Inc. wish to enter a professional services agreement for CSO 003 Hydrodynamic Separator IEPA Project #3 Design Engineering as further outlined in the professional services agreement attached hereto as Exhibit A ("Agreement"); and WHEREAS, the Mayor and Board of Trustees find that it is in the best interests of the Village to authorize the Agreement attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION I: That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety. SECTION 2: The Mayor and Board of Trustees of the Village of Lemont hereby approve the Agreement with HR Green, Inc. in substantially the same form as attached hereto as Exhibit A, subject to attorney review. SECTION 3: The Mayor and Clerk are hereby authorized, respectively, to execute the Agreement with HR Green, Inc. SECTION 4: This Resolution, and its parts, are declared to be severable and any section, subsection, sentence, clause, provision, or portion of this Resolution that is declared invalid such decision shall not affect the validity of any other portion of this Resolution, which shall remain in full force and effect. SECTION 5: All Resolutions and Ordinances in conflict herewith are hereby repealed to the extent of such conflict. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES �OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS DAY OF �,' 2025. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES Samuel J. Forzley Janelle Kittridge Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: CHARLENE M. S OLLEN Village Clerk ,r. �;► op aQs A z ���117015 ABSENT: ABSTAIN: V JOHN EGOFSKE President Exhibit A CSO 003 Hydrodynamic Separator IEPA Project #3 Design Engineering Agreement HRGreen. PROFESSIONAL SERVICES AGREEMENT For Village of Lemont CSO Outfall 003 Hydrodynamic Separator— Design Engineering Mr. George Schafer / Village Administrator Village of Lemont 418 Main Street Lemont, Illinois 60439 630-257-1550 Mr. Bruce Hill / Municipal Executive I HR Green, Inc. 323 Alana Drive New Lenox, Illinois 60451 HR Green Project No.: 2502258 December 3, 2025 Version 2.3 02052021 TABLE OF CONTENTS 1.0 PROJECT UNDERSTANDING 2.0 SCOPE OF SERVICES 3.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT 4.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES 5.0 SERVICES BY OTHERS 6.0 CLIENT RESPONSIBILITIES 7.0 PROFESSIONAL SERVICES FEE 8.0 TERMS AND CONDITIONS Version2.3 02052021 ® Professional Services Agreement Lemont, IL — CSO Outfall 003 Hydrodynamic Separator HR Green Project No.: 2502258 F i RG reefs December 3, 2025 Page 1 of 5 THIS AGREEMENT is between Village of Lemont (hereafter "CLIENT") and HR Green, Inc. (hereafter "COMPANY"). 1.0 Project Understanding 1.1 General Understanding As part of the CLIENT's IEPA NPDES Combined Sewer Overflow Long Term Control Plan, IEPA added a special permit condition that the CLIENT needs to "Investigate, size, design, procure, and construct 11 CFS capacity hydrodynamic separator devices" for CSO Outfall 003 by December 31, 2026. 1.2 Design Criteria/Assumptions • CLIENT specifications and Illinois Environmental Protection Agency (IEPA) regulations, and IDOT Standard Specifications for Road & Bridge Construction, will define the Standards to be used in the design of the hydrodynamic separator, sewer, and appurtenances. • All work will be completed within CLIENT's owned right-of-way or property. No easements are anticipated for the project. • Replacement of other utilities not identified above, or the entire roadway, is not anticipated. 2.0 Scope of Services The CLIENT agrees to employ COMPANY to perform the following services: Preliminary and General Work 2.1 Survey - COMPANY will provide topographic survey services that will include the following: a. Topographic Survey - Topographic Survey will be from approximately 25 Stephen Street to Outfall 003 into the Sanitary Drainage and Ship Canal within the limits specified above and extend 5 feet beyond the existing ROW lines. The topographic survey will include cross -sections at 50-foot intervals. The survey will include visible existing features and improvements. Existing utilities will be surveyed from visible flags or markings. Storm sewer, sanitary sewer and water main structures will be surveyed, including rim elevation, invert pipe size, direction and elevation as observed at unlocked manholes. Trees lying within the limits described above and having a diameter of four (4) inches or greater will be located, but the species not identified. b. Survey Base Map - COMPANY will generate a base map including one -foot contours in AutoCAD Civil 3D release 2023 for use by COMPANY for internal design. The survey will reference existing NGS control stations, Illinois State Plane Coordinate System East Zone NAD83 (2011) and NAVD88 (US Survey Feet). Version2.3 02052021 ® Professional Services Agreement Lemont, IL — CSO Outfall 003 Hydrodynamic Separator HR Green Project No.: 2502258 t iRGreen:; DecemP t, ,� age 2 of 5 Design Phase Services 2.2 Coordinate with utility companies to resolve possible conflicts with their existing facilities within the project limits and any specific construction requirements (e.g., crossing, separation, etc.). 2.3 Coordinate with vendors to provide the most appropriate hydrodynamic separator solution for the project, including required size, details, specifications, quotes, and other pertinent information for the design. 2.4 Prepare construction drawings anticipated as the following 16 Sheets (for 50% and 100% design stages): General 1. Cover Sheet with Location Map and Sheet Index 2. Legend and Abbreviations 3. General Construction Notes and Specifications Civil Plans 4. Removal and Erosion Control Sheet (at 1"=20' Hor./1"=2' Vert.) 5. Utility Plan Sheet (at 1"=20' Hor./1"=2' Vert.) 6. Restoration Plan Sheet (at 1"=20' Hor./1"=2' Vert.) 7. Hydrodynamic Separator Plan, Section, and Details Sheet 8. Structural Details Sheet Erosion Control 9. Erosion & Sediment Control Specifications and Standard Details (3 Sheets) Construction Details 10. Storm/Sanitary Sewer Standard Details (1 Sheet) 11. Class C and D Patches (Standard 442201-03) (1 Sheet) 12. Traffic Control — Illinois DOT Highway Standards (3 Sheets) 2.5 Prepare construction specifications and contract documents using CLIENT and Illinois DOT Standard Specifications (for 50% and 100% design stages). 2.6 Prepare an Opinion of Probable Cost for the project at the 50% complete milestone. Provide a final Opinion of Probable Cost for the project to file with the completed documents. 2.7 Submit digital copies of the drawings, specifications, contract documents, and Opinion of Probable Cost at the 50% complete milestone to CLIENT for review. 2.8 Provide an internal quality assurance and quality control review of final documents. 2.9 Develop a final project schedule for advertisement, bidding, and construction completion. 2.10 Submit digital copies of final drawings, specifications, contract documents, and Opinion of Probable Cost for permitting by the CLIENT (please note, while this can be considered the 90% design stage, the plans will be closer to 100% complete.): a. (MWRD Permit � a full WMO permit will not be necessary, but MWRD may Commented [SKIT: Iiii.,<- r! require a qualified sewer permit. A letter of determination will be sent to MWRD to confirm. 2.11 Bid Phase Services Version2.3 02052021 ® Professional Services Agreement Lemont, IL — CSO Outfall 003 Hydrodynamic Separator FIR Green Project No.: 2502258 December 3, 2025 I RG reen) , Page 3 of 5 3.0 Deliverables and Schedules Included in this Agreement The Project shall be initiated upon authorization bb CLIENT.1 1. Notice to Proceed — NTP.............................................................................. December 2025 2. Site Survey...................................................................................................... February 2026 3. 50% complete documents to Village.......................................................................April 2026 4. 50% complete review meeting............................................................................... April 2026 5. Submit documents for permitting.......................................................................May 2026 6. 100% complete documents to Village......................................................... June 2026 7. Permit review comments and Final Documents ............................................... June 2026 8. Bid opening.............................................................................................................July 2026 9. CLIENT Council award contract............................................................................. July 2026 10. Contractor Start (Anticipated — T.B.D.)...............................................................August 2026 11. Project Completion Date................................................................................November 2026 This schedule was prepared to include reasonable allowances for review and approval times required by the CLIENT and public authorities having jurisdiction over the project. This schedule shall be equitably adjusted as the project progresses, allowing for changes in the scope of the project requested by the CLIENT or for delays or other causes beyond the control of COMPANY. 4.0 Items not included in Agreement/Supplemental Services 1. A Construction Engineering services agreement will be assembled when the Contractor provides a schedule for construction. 2. Additional GIS data collection or surveying other than the design data collection and base mapping as outlined above. To be included in the Construction Engineering agreement. 3. Property boundary research, including subdivision maps, right-of-way widths, property lines, and property ownership information other than readily available property line information from the County. 4. Plat of Survey/Topography. 5. Plat of Dedication/Easement. 6. Hydraulic water modeling. 7. Storm sewer modeling. 8. Any evaluation or modification to the CLIENT's sanitary or storm sewer systems. 9. Any significant roadway replacement and/or modifications other than patching associated with the installation of the hydrodynamic separator as required. 10. Preparation or administration of additional maps, plats, deeds or easement documents not specifically referenced in the scope of services. 11. Construction Staking. 12. Record Drawings. Supplemental services not included in the AGREEMENT can be provided by COMPANY under separate agreement, if desired. 5.0 Services by Others Seeco Consultants, Inc. • Soil Boring and Geotechnical Report • LPC 662/663 Forms Version2.3 02052021 Commented [SK2] t+ ... ;: Commented (i$ OR21: t - nd' ® Professional Services Agreement Lemont, IL — CSO Outfall 003 Hydrodynamic Separator HR Green Project No.: 2502258 FI RG reen Decem Page4 of 5 6.0 Client Responsibilities N/A 7.0 Professional Services Fee 7.1 Fees The fee for services will be based on COMPANY standard hourly rates current at the time the AGREEMENT is signed. These standard hourly rates are subject to change upon 30 days' written notice. Non -salary expenses directly attributable to the project such as: (1) living and traveling expenses of employees when away from the home office on business connected with the project; (2) identifiable communication expenses; (3) identifiable reproduction costs applicable to the work; and (4) outside services will be charged in accordance with the rates current at the time the service is done. 7.2 Invoices Invoices for COMPANY's services will be submitted, on a monthly basis. Invoices will be due and payable upon receipt in accordance with the Illinois Prompt Payment Act 50ILCS 505. If any invoice is not paid within these timelines, COMPANY may, without waiving any claim or right against the CLIENT, and without liability whatsoever to the CLIENT, suspend or terminate the performance of services. 7.3 Extra Services Any service required but not included as part of this AGREEMENT shall be considered extra services. Extra services will be billed on a Time and Material basis with prior approval of the CLIENT. 7.4 Exclusion This fee does not include attendance at any meetings or public hearings other than those specifically listed in the Scope of Services. These service items are considered extra and are billed separately on an hourly basis. 7.5 Payment The CLIENT AGREES to pay COMPANY on the following basis: Time and Materials, Not to Exceed fee of $60,000.00. Version2.3 02052021 ® Professional Services Agreement Lemont, IL — CSO Outfall 003 Hydrodynamic Separator FIR Green Project No.: 2502258 December 3, 2025 H RG reen . Page 5 of 5 8.0 Terms and Conditions This Agreement is an addendum to and is considered part of the Master Agreement between CLIENT and COMPANY. All terms and conditions contained in that agreement apply to this Agreement. This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties signing and dating the AGREEMENT. Services will not begin until COMPANY receives a signed agreement. COMPANY's services shall be limited to those expressly set forth in this AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project except as agreed to in writing. The effective date of the AGREEMENT shall be the last date entered below. Sincerely, HR GREEN, INC. Z_ Bruce A. Hill Municipal Executive — Municipal Services Engineering Approved by: t• �'D IF Printed/Typed Name: Timothy J. Hartnett Title: President — Municipal Services Date: December 3, 2025 VILLAGE OF LEMONT Accepted by: Printed/Typed Name: George Schafer Title: Village Administrator Date: J:\2025\2502258\Admin\Contract\Client\PSA_2502258_Lemont_ Hydrodynamic Separator Downstream of CSO Outfall 003 -Design Engineering.docx Version2.3 02052021