Loading...
R-86-25 Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for FY27 Water Main Improvements CN Railroad Crossings Design Engineering418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for FY27 Water Main Improvements CN Railroad Crossings Design Engineering DATE: December 8, 2025 SUMMARY/BACKGROUND HR Green is assisting the Village with design engineering services for a couple of additional locations on top of the yearly water main improvements project. The existing 8-inch water main on Ed Bossert Drive that runs underneath the Canadian National (CN) Railroad has experienced multiple leaks during the recent year, so it needs to be replaced. Currently, the 8- inch water main underneath Ed Bossert Drive is one of two water mains that cross the CN RR and feeds the downtown area of Lemont. Adding another water main that crosses the CN RR would be a good idea for proper redundancy. Funding will come from the Water Sewer Fund. The time & material, not to exceed, fees for the project are $59,500.00. with these costs being solely based on how difficult the CN Permit application process is. As outlined in the Agreement, the streets included in this year's water main improvements project will be: • Ed Bossert Drive • Talcott Avenue - North of Turnabout Pizza ANALYSIS The FY2027 Water Main Improvements -CN Railroad Crossings is consistent with the Village's 5-Year capital Plan. Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for FY27 Water Main Improvements CN Railroad Crossings Design Engineering BOARD ACTION REQUESTED Pass Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for FY27 Water Main Improvements CN Railroad Crossings Design Engineering ATTACHMENTS A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for FY27 Water Main Improvements CN Railroad Crossings Design Engineering.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R- -25 A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR FY27 WATER MAIN IMPROVEMENTS CN RAILROAD CROSSINGS DESIGN ENGINEERING JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk SAMUEL J. FORZLEY JANELLE KITTRIDGE KEN MCCLAFFERTY KE VIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemontld i"= = 2025 RESOLUTION NO. R--25 A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR FY27 WATER MAIN IMPROVEMENTS CN RAILROAD CROSSINGS DESIGN ENGINEERING WHEREAS the Village of Lemont, Counties of Cook, Will, and DuPage, Illinois, ("the Village") is a municipality in the State of Illinois with full powers to enact Ordinances and adopt Resolutions for the benefits of the residents of the Village; and WHEREAS, the Village and HR Green, Inc. wish to enter a professional services agreement for FY27 Water Main Improvements CN Railroad Crossings Design Engineering as further outlined in the professional services agreement attached hereto as Exhibit A ("Agreement"); and WHEREAS, the Mayor and Board of Trustees find that it is in the best interests of the Village to authorize the Agreement attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety. SECTION 2: The Mayor and Board of Trustees of the Village of Lemont hereby approve the Agreement with HR Green, Inc. in substantially the same form as attached hereto as Exhibit A, subject to attorney review. SECTION 3: The Mayor and Cleric are hereby authorized, respectively, to execute the Agreement with HR Green, Inc. SECTION 4: This Resolution, and its parts, are declared to be severable and any section, subsection, sentence, clause, provision, or portion of this Resolution that is declared invalid such decision shall not affect the validity of any other portion of this Resolution, which shall remain in full force and effect. SECTION 5: All Resolutions and Ordinances in conflict herewith are hereby repealed to the extent of such conflict. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMO,NT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS DAY OF - I --- 2025. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES: ABSENT: ABSTAIN: Samuel J. Forzley Janelle Kittridge Ken McClafferty V- Kevin Shaughnessy l� Rick Sniegowski Ron Stapleton ATTEST: JOHN EGOFSKE President CHARLEN M. SMOLLEN Village Clerk �E. O F �4�t 02 EAL 1®/in di s Exhibit A FY27 Water Main Improvements CN Railroad Crossings Design Engineering Agreement HRGreen. PROFESSIONAL SERVICES AGREEMENT For Village of Lemont FY2027 Water Main Improvements — CN Railroad Crossings — Design Engineering Mr. George Schafer / Village Administrator Village of Lemont 418 Main Street Lemont, Illinois 60439 Ph: 630-257-1550 Mr. Bruce Hill / Municipal Executive I HR Green, Inc. 323 Alana Drive New Lenox, Illinois 60451 Ph: 815-462-9324 HR Green Project No.:2503820 December 3, 2025 Version 2.3 02052021 TABLE OF CONTENTS 1.0 PROJECT UNDERSTANDING 2.0 SCOPE OF SERVICES 3.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT 4.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES 5.0 SERVICES BY OTHERS 6.0 CLIENT RESPONSIBILITIES 7.0 PROFESSIONAL SERVICES FEE 8.0 TERMS AND CONDITIONS Version2.1 11212025 Professional Services Agreement Lemont, IL — FY27 Water Main Improvements- CN RR Crossings HR Green Project No.: 2503820 December 3, 2025 H RG reen . Page 1 of 6 THIS AGREEMENT is between Village of Lemont (hereafter "CLIENT") and HR Green, Inc. (hereafter "COMPANY"). 1.0 Project Understanding 1.1 General Understanding The CLIENT has identified a need for water main improvements at the following locations: Main Street to Canal Street with CN Railroad Crossing at the Lemont Metra Station. o Replacement of failing water main. Talcott Avenue from Main Street to Pruxne Street with CN Railroad Crossing just north of Main Street. o Installation of new water main. The project is anticipated to consist of installing approximately 200 Lin Ft. of a new 8-inch, ductile iron main, and 200 Lin Ft. of a new 10-inch ductile iron main by the directional boring method. The project will also include abandonment of leaking water main and patching associated with the water main work under existing pavement. 1.2 Design Criteria/Assumptions The engineering and contract documents will be developed according to current AWWA Standards, the Village of Lemont Code Ordinances, and all applicable local and federal requirements. These include the following: a. Standard Specifications for Water and Sewer Main Construction in Illinois b. Metropolitan Water Reclamation District's (MWRD) Watershed Management Ordnance c. Illinois Environmental Protection Agency (IEPA) Regulations d. Canadian National Railroad crossing requirements • All water main replacement will be completed within CLIENT's owned right-of-way. No easements are anticipated for the project. 2.0 Scope of Services The CLIENT agrees to employ COMPANY to perform the following services: Preliminary and General Work 2.1 Survey - COMPANY will provide topographic survey services that will include the following: a. Right of Way and Topographic Survey - COMPANY will recover existing right-of- way (ROW) lines and conduct a topographic survey for approximately 400 feet at Location No. 1 and 300 feet at Location No. 2 specified above. COMPANY will calculate the existing ROW as shown on the existing ROW documents (provided by CLIENT) and/or adjacent recorded plats of subdivision to include on the base map. The survey will include visible existing features and improvements at ground level within the existing right of way plus five (5) feet on each side. Existing utilities will be surveyed from visible flags or markings. Storm sewer, sanitary sewer, and Version2.3 02052021 Professional Services Agreement Lemont, IL — FY27 Water Main Improvements- CN RR Crossings HR Green Project No.: 2503820 December 3, 2025 HRGreen Page 2 of 6 water main structures will be surveyed including rim elevation, invert pipe size, direction and elevation as observed at unlocked manholes. Survey will reference existing NGS control stations on the Illinois State Plane Coordinate System East Zone NAD83 (2011) and NAVD88 (US Survey Feet). A base map will be completed in AutoCAD Civi13D release 2023 for use by COMPANY for internal design. 2.2 Subsurface geotechnical investigation — COMPANY will hire a sub -consultant as part of this contract to perform geotechnical investigation as required by the railroad crossing permit. This work will include the following: a. Boreholes at each end of the crossing drilled to a depth 20 feet below the proposed crossing depth. b. Soil samples collected at 3-foot intervals to a depth of 15 feet. c. Soil classification testing. d. Monitoring of groundwater elevation via piezometer/monitoring well. e. Laboratory testing to provide IEPA LPC-663 certification documents. f. Geotechnical report with recommendations for trenchless construction methods. Design Phase Services 2.3 Coordinate with utility companies to resolve possible conflicts with their existing facilities within the project limits and any specific construction requirements (e.g., crossing, separation, etc.). 2.4 Provide Engineering Plans with proposed line and grade of the proposed water main, recommended locations for valves, fire hydrants, reconnections to existing services, and reconnections to the existing water main. 2.5 Prepare construction drawings anticipated as the following 18 Sheets (for 50% and 100% design stages): General 1. Cover Sheet with Location Map and Sheet Index 2. General Construction Notes, Standard Symbols, and Summary of Quantities 3. Water Main Construction Notes, Special Project Notes, and Requirements for Separation of Sewers and Water Mains Civil Plans 4. Main St to Canal St P&P Sheet (at 1 "=20' Hor./1 "=2' Vert.) 5. Main St to Canal St P&P Sheet (at 1 "=20' Hor./1 "=2' Vert.) 6. Talcott Ave P&P Sheet (at 1 "=20' Hor./1 "=2' Vert.) 7. Talcott Ave P&P Sheet (at 1 "=20' Hor./1 "=2' Vert.) Construction Details 8. Separation Requirements, Notes, Payment Detail, and Installation Detail 9. Water Main Standard Details 10. Water Main Standard Details 11. ADA Sidewalk (Standard 424001-11) 12. Conc. Curb & Gutter Standards Version2.3 02052021 Professional Services Agreement Lemont, IL — FY27 Water Main Improvements- CN RR Crossings HR Green Project No.: 2503820 December 3, 2025 H RGreen . Page 3 of 6 13. Conc. Curb & Gutter Standards 14. Class C and D Patches (Standard 442201-03) SWPPP 15. Erosion & Sediment Control Specifications Traffic Control 16. Illinois DOT Highway Standards 701301-04, 701501-06, & 701801-06 17. Illinois DOT Highway Standards 701901-08 18. Illinois DOT Highway Standards TC-13 & TC-10 2.6 Prepare construction specifications and contract documents using CLIENT and Illinois DOT Standard Specifications (for 50% and 100% design stages). 2.7 Prepare an Opinion of Probable Cost for the project at the 50% complete milestone. Provide a final Opinion of Probable Cost for the project to file with the completed documents. 2.8 Submit three (3) copies of the drawings, specifications, contract documents, and Opinion of Probable Cost at the 50% complete milestone to CLIENT for review. 2.9 Provide an internal quality assurance and quality control review of final documents. 2.10 Develop a final project schedule for advertisement, bidding, and construction completion. 2.11 Provide completed IEPA Construction permits for the CLIENT's signature. COMPANY will submit applications to the Illinois Environmental Protection Agency (IEPA) for review and approval. 2.12 Provide a Stormwater Permit Application in accordance with the CLIENT's local Stormwater Management Ordinance. Due to the size of the project, it is anticipated that this project will qualify as no permit needed. 2.13 Provide a submittal as required to the Canadian National Railway for permit required to cross under the tracks at the proposed locations. 2.14 Bid Phase Services 3.0 Deliverables and Schedules Included in this Agreement The Project shall be initiated upon authorization by CLIENT. 1. Notice to Proceed — NTP.............................................................................. December 2025 2. Site Survey..................................................................................................... January 2026 3. 50% complete documents to Village .........................................Week of February 16'h, 2026 4. 50% complete review meeting .................................................. Week of February 23,d, 2026 5. Submit documents for permitting .............................................. Week of March 91h, 2026 6. 100% complete documents to Village ......................................... Week of May 41h, 2026 7. Permit review comments and Final Documents ............................. Week of June 8'h, 2026 8. Bid opening (Pending the CN Permit Approval) ............................................. June 15th, 2026 9. CLIENT Council award contract................................................................. July 2026 10. Contractor Start (Anticipated — T.B.D.)................................................................ July 2026 11. Project Completion Date.......................................................................... August 2026 Version2.3 02052021 Professional Services Agreement Lemont, IL — FY27 Water Main Improvements- CN RR Crossings HR Green Project No.: 2503820 H RGreen ® DecemPage 4 of 6 This schedule was prepared to include reasonable allowances for review and approval times required by the CLIENT and public authorities having jurisdiction over the project. This schedule was prepared to include reasonable allowances for review and approval times required by the CLIENT and public authorities having jurisdiction over the project. This schedule shall be equitably adjusted as the project progresses, allowing for changes in the scope of the project requested by the CLIENT or for delays or other causes beyond the control of COMPANY. 4.0 Items not included in Agreement/Supplemental Services 1. A Construction Engineering services agreement will be assembled when the Contractor provides a schedule for construction. 2. Additional GIS data collection or surveying other than the design data collection and base mapping as outlined above. To be included in the Construction Engineering agreement. 3. Property boundary research, including subdivision maps, right-of-way widths, property lines, and property ownership information other than readily available property line information from the County. 4. Tree Survey/Inventory 5. Plat of Survey/Topography 6. Plat of Dedication/Easement 7. Hydraulic water modeling 8. Storm sewer modeling 9. Any evaluation or modification to the CLIENT's sanitary or storm sewer systems. 10. Any significant roadway replacement and/or modifications other than patching associated with the installation of the water main and curb/gutter, driveway approach, and sidewalk replacement as required. 11. Preparation or administration of additional maps, plats, deeds or easement documents not specifically referenced in the scope of services. 12. Construction Layout/Staking Supplemental services not included in the AGREEMENT can be provided by COMPANY under separate agreement, if desired. 5.0 Services by Others Midland Standard Engineering & Testing • Soil Boring and Geotechnical Report • LPC 662/663 Forms 6.0 Client Responsibilities Site Access Version2.3 02052021 Professional Services Agreement Lemont, IL — FY27 Water Main Improvements- CN RR Crossings FIR Green Project No.: 2503820 December 3, 2025 H RGreen m Page 5 of 6 7.0 Professional Services Fee 7.1 Fees The fee for services will be based on COMPANY standard hourly rates current at the time the AGREEMENT is signed. These standard hourly rates are subject to change upon 30 days' written notice. Non -salary expenses directly attributable to the project such as: (1) living and traveling expenses of employees when away from the home office on business connected with the project; (2) identifiable communication expenses; (3) identifiable reproduction costs applicable to the work; and (4) outside services will be charged in accordance with the rates current at the time the service is done. 7.2 Invoices Invoices for COMPANY's services will be submitted, on a monthly basis. Invoices will be due and payable upon receipt in accordance with the Illinois Prompt Payment Act 50ILCS 505. If any invoice is not paid within these timelines, COMPANY may, without waiving any claim or right against the CLIENT, and without liability whatsoever to the CLIENT, suspend or terminate the performance of services. 7.3 Extra Services Any service required but not included as part of this AGREEMENT shall be considered extra services. Extra services will be billed on a Time and Material basis with prior approval of the CLIENT. 7.4 Exclusion This fee does not include attendance at any meetings or public hearings other than those specifically listed in the Scope of Services. These service items are considered extra and are billed separately on an hourly basis. 7.5 Payment The CLIENT AGREES to pay COMPANY on the following basis: Time and material (T&M) basis with a Not to Exceed fee of $59,500. The breakdown of fee is as follows: Task Fee (T&M basis) Project Management, Meetings, Data Collection $ 14,000.00 Sub -Consultant (Geotechnical Investigation) $ 23,500.00 Design Phase Services (Preliminary) $ 6,000.00 Permitting Through Jurisdictional Agencies $ 7,500.00 Design Phase Services (Final) $ 4,500.00 Bid Phase Services $ 4,000.00 Total $59,500.00 Version2.3 02052021 Professional Services Agreement Lemont, IL — FY27 Water Main Improvements- CN RR Crossings HR Green Project No.: 2503820 December 3, 2025 H RG reen ® Page 6 of 6 8.0 Terms and Conditions This Agreement is an addendum to and is considered part of the Master Agreement between CLIENT and COMPANY. All terms and conditions contained in that agreement apply to this Agreement. This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties signing and dating the AGREEMENT. Services will not begin until COMPANY receives a signed agreement. COMPANY's services shall be limited to those expressly set forth in this AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project except as agreed to in writing. The effective date of the AGREEMENT shall be the last date entered below. Sincerely, HR G EN, INC. _ Bruce A. Hill Municipal Executive — Municipal Services Engineering Approved by: r"IY7 J Printed/Typed Name: Timothy J. Hartnett Title: President — Municipal Services Date: December 3, 2025 VILLAGE OF LEMONT Accepted by: Printed/Typed Name: George Schafer Title: Villaae Administrator Date: 127 j -2." J:\2025\2503820Wdmin\Contract\Client\PSA_2503820_FY27 Water Main Impr.-CN RR Crossing-Design.dou Version2.3 02052021