Loading...
R-53-25 Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Heritage Quarries I & M Canal Trail Amenity Improvements Phase I Design Engineering4- 8 i l z IL TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Heritage Quarries I & M Canal Trail Amenity Improvements Phase I Design Engineering DATE: July 28, 2025 SUMMARY/BACKGROUND HR Green is assisting the Village with design engineering services for Phase I of the proposed amenity improvements to take place in Heritage Quarries / I&M Canal Trail. Funding will be 50% from an OSLAD grant that was secured in the FY25 round of funding and the remaining 50% will come from the Infrastructure Fund. The total lump sum, not to exceed fees for the project is $120,000.00. $60,000.00 will be reimbursed by the OSLAD grant, leaving $60,000.00 to come from the Infrastructure Fund. As outlined in the Agreement the amenity improvements for this project will include: • Installation of a new fishing pier • Installation of a new shelter for paddle sports • Installation of a new Overlook • Asphalt paving the existing stone/grindings roadway w/ water quality improvements • Cape sealing the existing stone/grindings parking lots • Installation of Bench Notes at multiple locations (3 locations along the trail loop) ANALYSIS The Heritage Quarries / I & M Canal Trail Amenity Improvements Phase I project is consistent with the Village's 5-year Capital Plan. $90,000.00 has been budgeted in the Infrastructure Fund in FY26 for design engineering for this project and the Village's portion will only be $60,000.00. Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Heritage Quarries I & M Canal Trail Amenity Improvements Phase I Design Engineering BOARD ACTION REQUESTED Pass A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Heritage Quarries I & M Canal Trail Amenity Improvements Phase I Design Engineering A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Heritage Quarries I & M Canal Trail Amenity Improvements Phase I Design Engineering.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R--25 A RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR HERITAGE QUARRIES I & M CANAL TRAIL AMENITY IMPROVEMENTS PHASE I DESIGN ENGINEERING JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk SAMUEL J. FORZLEY JANELLE KITTRIDGE KEN MCCLAFFER TY KEVIN SHA UGHNESSY RICK SNIEGO WSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on 1 A025 RESOLUTION NO. R- -25 A RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR HERITAGE QUARRIES I & M CANAL TRAIL AMENITY IMPROVEMENTS PHASE I DESIGN ENGINEERING WHEREAS the Village of Lemont, Counties of Cook, Will, and DuPage, Illinois, ("the Village") is a municipality in the State of Illinois with frill powers to enact Ordinances and adopt Resolutions for the benefits of the residents of the Village; and WHEREAS, the Village and HR Green, Inc. wish to enter a professional services agreement for Heritage Quarries I & M Canal Trail Amenity Improvements Phase I Design Engineering as further outlined in the professional services agreement attached hereto as Exhibit A ("Agreement"); and WHEREAS, the Mayor and Board of Trustees find that it is in the best interests of the Village to authorize the Agreement attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety. SECTION 2: The Mayor and Board of Trustees of the Village of Lemont hereby approve the Agreement with HR Green, Inc. in substantially the same form as attached hereto as Exhibit A, subject to attorney review. SECTION 3: The Mayor and Clerk are hereby authorized, respectively, to execute the Agreement with HR Green, Inc. SECTION 4: This Resolution, and its parts, are declared to be severable and any section, subsection, sentence, clause, provision, or portion of this Resolution that is declared invalid such decision shall not affect the validity of any other portion of this Resolution, which shall remain in full force and effect. SECTION 5: All Resolutions and Ordinances in conflict herewith are hereby repealed to the extent of such conflict. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS DAY OF2025. Samuel J. Forzley Janelle Kittridge Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES V CHARLENE M. SMOLLEN Village Clerk F � F� Q' JO v /ILINoS ABSENT: ABSTAIN: JO'HN EGOFSKE President Exhibit A Professional Services Agreement for Heritage Quarries I & M Canal Trail Amenity Improvements Phase I Design Engineering t-1 lit 5I i,5 PROFESSIONAL SERVICES AGREEMENT For Lemont, IL — Heritage Quarries/I&M Canal Trail Amenity Improvements — Phase I Design Engineering Village of Lemont Mr. George Schafer Village Administrator 418 Main Street Lemont, IL 60439 Ph: 630.257.1550 Bruce A. Hill, PE Municipal Executive — Governmental Services Engineering HR Green, Inc. 323 Alana Drive New Lenox, IL 60451 Ph: 815.462.9324 Project No. 2403543.01 July 21, 2025 Version 2.3 02052021 TABLE OF CONTENTS 1.0 PROJECT UNDERSTANDING 2.0 SCOPE OF SERVICES 3.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT 4.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES 5.0 SERVICES BY OTHERS 6.0 CLIENT RESPONSIBILITIES 7.0 PROFESSIONAL SERVICES FEE 8.0 TERMS AND CONDITIONS Version2.3 02052021 u, Professional Services Agreement Lemont, IL — Heritage Trail/I&M Canal Trail Amenity Improvements — Phase I a HR Green Project No.: 2403543.01 July 21, 2025 Page 1 of 7 THIS AGREEMENT is between the Village of Lemont (hereafter "CLIENT") and HR Green, Inc. (hereafter "COMPANY"). 1.0 Project Understanding 1.1 General Understanding The CLIENT has received grant approval and intends to proceed with Phase 1 of the Heritage Quarries/I&M Canal Trail Amenity Improvements. These improvements include, but are not limited to the following: • Installation of a new Fishing Pier • Installation of a new Shelter for Paddle Sports • Installation of a new Overlook • Asphalt paving the existing stone/grindings roadway • Cape sealing the existing stone/grindings parking lots • Installation of Bench Notes at multiple locations (3 locations along the trail loop) The project is anticipated to include roadway paving on both sides of the I&M Canal, extending from the recreation area entry to the main parking areas on both sides of the canal. For this proposal we have estimated 1,100 Lineal Feet on the south side of the canal, and 4,200 Lineal Feet on the north side of the canal. Roadside parking is to be included within each of these corridors. The west parking lot is approximately 1.85 Acres, the middle parking lot is 0.50 Acres, and the north parking lot is 0.25 Acres. 1.2 Design Criteria/Assumptions • Stormwater from the proposed improvements is to be infiltrated into the ground, which complies with DuPage County requirements for both volume and pollution control. • CLIENT specifications and Illinois Environmental Protection Agency (IEPA) regulations will define the Standards to be used in the design the proposed improvements. • No utility improvements are included within the Phase 1 scope of work. • All improvements will be completed within CLIENT's owned right-of-way or property. No easements are anticipated for the project. • A topographic survey and subsurface geotechnical investigation for the site will be provided as a part of this scope of work. • No reprofiling of the existing access roads is proposed. Existing road profiles are to be bladed smooth, compacted, and paved. • Limited grading of existing parking areas is proposed to provide proper drainage prior to cape sealing. Version2.3 02052021 Professional Services Agreement Lemont, IL —Heritage Trail/I&M Canal Trail Amenity Improvements — Phase I HR Green Project No.: 2403543.01 July 21, 2025 Page 2 of 7 • Amenity areas are to be graded, as needed to accommodate the proposed improvements. • Project amenities (floating piers, shelters, benches, etc.) are to be catalog items and will not require structural design for installation. 2.0 Scope of Services The CLIENT agrees to employ COMPANY to perform the following services: Preliminary and General Work 2.1 Topographic Survey: a. COMPANY will perform a Topographic Survey on part of the subject parcel known as Lemont Heritage Quarries Recreation Area in Lemont, IL. Topographic survey will locate visible existing surface improvements and site topography within the area outlined in red on Figure A, being approximately 140 acres, using an unmanned aerial vehicle (UAV). Survey will reference Illinois State Plane Coordinates — East Zone (NAD83-2011) and NAVD 88 (US Survey Feet). A topographic base map will be completed in AutoCAD Civil3D release 2023 for internal use by COMPANY. Figure A Client Responsibilities: a. The unmanned aerial vehicle (UAV) mission may include some overlap onto adjoining owners' property. The COMPANY's FAA certified Remote Pilot will monitor the flight path and adhere to FAA rules and regulations relating to unmanned aerial system flights. COMPANY is not responsible for contacting adjoining owners that may fall within this flight path. Notification of owners is at the discretion of the CLIENT. b. Provide access to site during normal business hours. Exclusions: a. Bathymetric Survey b. Boundary Survey c. Tree Survey d. Utility Survey e. Plat of Survey Version2.3 02052021 l M Professional Services Agreement Lemont, IL — Heritage Trail/I&M Canal Trail Amenity Improvements — Phase I 0 HR Green Project No.: 2403543.01 July 21, 2025 Page 3of7 2.2 Subsurface geotechnical investigation (SEECO) a. The geotechnical investigation will define the appropriate pavement cross - sections and confirm soil percolation properties are suitable for stormwater infiltration. Design Phase Services 2.3 Coordinate with utility companies to resolve possible conflicts with their existing facilities within the project limits and any specific construction requirements (e.g., crossing, separation, etc.). 2.4 Prepare construction drawings anticipated as the following 25 Sheets (for 50% and 100% design stages): General 1. Cover Sheet with Location Map and Sheet Index 2. General Construction Notes, Standard Symbols, and Summary of Quantities 3. Grading, Erosion & Sediment Control (GESC), Paving Construction Notes, Special Project Notes, and notes related to installation of site amenities. Civil Plans Aside from the plan and profile sheets, site plan sheets will be consolidated to the extent feasible to maintain design clarity. Key maps will be included to assist with plan set navigation. 1. Overall Site Plan Sheet (at 1"=300') 2. Fishing Pier Site Plan Sheet (at 1 "=20') 3. Paddle Sports Site Plan Sheet (at 1 "=20') 4. Overlook Site Plan Sheet (at 1"=20') 5. Bench Node Site Plan Sheet (at 1 "=20') 6. N. Side Access Paving Plans — 2 Sheets (at 1"=50' Hor.) 7. S. Side Access Paving Plan — 1 Sheet (at 1"=50' Hor.) 8. Parking Lot 1 Cape Seal Plan (at 1 "=40') 9. Parking Lot 2 & 3 Cape Seal Plan (at 1"=40') Construction Details 1. Erosion and Sediment Control Details 2. Signage and Striping Details 3. Roadway and Parking Details 4. Amenity Details and Specifications SWPPP Erosion & Sediment Control Plans Erosion & Sediment Control Specifications Version2.3 02052021 gv Professional Services Agreement ' Lemont, IL — Heritage Trail/I&M Canal Trail Amenity Improvements — Phase I r= HR Green Project No.: 2403543.01 July 21, 2025 i ii-_" L,1 1 - Page 4 of 7 Traffic Control 1. Illinois DOT Highway Standards 701301-04, 701501-06, & 701801-06 1. Illinois DOT Highway Standards 701901-08 2. Illinois DOT Highway Standards TC-13 & TC-10 2.5 Prepare construction specifications and contract documents using CLIENT and Illinois DOT Standard Specifications (for 50% and 100% design stages). 2.6 Prepare an Opinion of Probable Cost for the project at the 50% complete milestone. Provide a final Opinion of Probable Cost for the project to file with the completed documents. 2.7 Submit three (3) copies of the drawings, specifications, contract documents, and Opinion of Probable Cost at the 50% complete milestone to CLIENT for review. 2.8 Provide an internal quality assurance and quality control review of final documents. 2.9 Develop a final project schedule for advertisement, bidding, and construction completion. 2.10 Submit three (3) copies of final drawings, specifications, contract documents, and Opinion of Probable Cost for permitting by the CLIENT (please note, while this can be considered the 90% design stage, the plans will be closer to 100% complete.): a. NPDES Phase 2 NOI b. MWRD WMO Permit (if necessary) 2.11 Bid Phase Services 3.0 Deliverables and Schedules Included in this Agreement The Project shall be initiated upon authorization by CLIENT. 1. Notice to Proceed — NTP.................................................................................. August 2025 2. Site Survey............................................................................. Week of September 15, 2025 3. 50% complete documents to Village ....................................... Week of November 10, 2025 4. 50% complete review meeting ................................................ Week of November 17, 2025 5. Submit documents for permitting ............................................. Week of November 24, 2025 6. 100% complete documents to Village ................................ Week of December, 15 2025 7. Permit review comments and Final Documents ......................................... January 2, 2026 8. Bid opening............................................................................................... January 16, 2026 9. CLIENT Council award contract................................................................ January 26, 2026 10. Contractor Start (Anticipated — T.B.D.).......................................................... February 2026 11. Project Completion Date............................................................................ September 2026 This schedule was prepared to include reasonable allowances for review and approval times required by the CLIENT and public authorities having jurisdiction over the project. This schedule shall be equitably adjusted as the project progresses, allowing for changes in the scope of the project requested by the CLIENT or for delays or other causes beyond the control of COMPANY. Version2.3 02052021 Professional Services Agreement Lemont, IL — Heritage Trail/I&M Canal Trail Amenity Improvements — Phase I HR Green Project No.: 2403543.01 I - July 21, 2025 Page 5 of 7 4.0 Items not included in Agreement/Supplemental Services 1. A Construction Engineering services agreement will be assembled when the Contractor provides a schedule for construction. 2. Additional GIS data collection or surveying other than the design data collection and base mapping as outlined above. To be included in the Construction Engineering agreement. 3. Property boundary research, including subdivision maps, right-of-way widths, property lines, and property ownership information other than readily available property line information from the County. 4. Plat of Survey/Topography. 5. Plat of Dedication/Easement. 6. Hydraulic water modeling. 7. Storm sewer modeling. 8. Any evaluation or modification to the CLIENT's sanitary or storm sewer systems. 9. Any significant roadway replacement and/or modifications other than patching associated with the installation of the water main and curb/gutter, driveway approach, and sidewalk replacement as required. 10. Preparation or administration of additional maps, plats, deeds, or easement documents not specifically referenced in the scope of services. 11. Construction Staking. 12. Record Drawings. Supplemental services not included in the AGREEMENT can be provided by COMPANY under separate agreement, if desired. 5.0 Services by Others Seeco Consultants, Inc. • Soil Boring and Geotechnical Report • LPC 662/663 Forms 6.0 Client Responsibilities N/A 7.0 Professional Services Fee 7.1 Fees The fee for services will be based on COMPANY standard hourly rates current at the time the AGREEMENT is signed. These standard hourly rates are subject to change upon 30 days' written notice. Non -salary expenses directly attributable to the project such as: (1) living and traveling expenses of employees when away from the home office on business connected with the project; (2) identifiable communication expenses; (3) identifiable reproduction costs applicable to the work; and (4) outside services will be charged in accordance with the rates current at the time the service is done. Version2.3 02052021 Professional Services Agreement Lemont, IL — Heritage Trail/I&M Canal Trail Amenity Improvements — Phase I HR Green Project No.: 2403543.01 July 21, 2025 Page 6of7 7.2 Invoices Invoices for COMPANY's services will be submitted, on a monthly basis. Invoices will be due and payable upon receipt in accordance with the Illinois Prompt Payment Act 50ILCS 505. If any invoice is not paid within these timelines, COMPANY may, without waiving any claim or right against the CLIENT, and without liability whatsoever to the CLIENT, suspend or terminate the performance of services. 7.3 Extra Services Any service required but not included as part of this AGREEMENT shall be considered extra services. Extra services will be billed on a Time and Material basis with prior approval of the CLIENT. 7.4 Exclusion This fee does not include attendance at any meetings or public hearings other than those specifically listed in the Scope of Services. These service items are considered extra and are billed separately on an hourly basis. 7.5 Payment The CLIENT AGREES to pay COMPANY on the following basis: Lump Sum fee of $120,000.00. 8.0 Terms and Conditions This Agreement is an addendum to and is considered part of the Master Agreement between CLIENT and COMPANY. All terms and conditions contained in that agreement apply to this Agreement. Version2.3 02052021 Professional Services Agreement Lemont, IL — Heritage Trail/I&M Canal Trail Amenity Improvements — Phase I HR Green Project No.: 2403543.01 July 21, 2025 HR ' reen & Page 7 of 7 This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties signing and dating the AGREEMENT. Services will not begin until COMPANY receives a signed agreement. COMPANY's services shall be limited to those expressly set forth in this AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project except as agreed to in writing. The effective date of the AGREEMENT shall be the last date entered below. Sincerely, HR GREEN, INC. Bruce A. Hill Municipal Executive — Municipal Services Engineering Approved by: Printed/Typed Name: Timothy J. Hartnett Title: President — Municipal Services Date: July 21, 2025 VILLAGE OF LEMONT Accepted by: Printed/Typed Name: Geo'rcu-Schafer / Title: Village Administrator Date: %20� ZJ J:\2024\2403543.01\Admin\Contract\Client\PSA_2403543.01_Lemont-2025_HQ-I&M Canal Trail_7.18.2025-bh.docx Version2.3 02052021