Loading...
R-23-25 Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Archer and Derby PW Annex Landscaping, Material Storage Bins, Paving, and Miscellaneous Site Work Design and Construction Engineering�, -- Z 3 -- Z 5 418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Archer and Derby PW Annex Landscaping, Material Storage Bins, Paving, and Miscellaneous Site Work Design and Construction Engineering DATE: April 14, 2025 SUMMARY/BACKGROUND Staff have been working with HR Green, Inc. to develop and implement a site plan for the PW Annex Archer Avenue Derby Road Tower property. This agreement focuses on design and construction engineering for the site landscaping, material storage bins, paving, and miscellaneous site work. The proposed agreement authorizes HR Green, Inc. and the Village to move forward with this project. The total not to exceed fees for the project are $40,000.00. ANALYSIS This project was included in the 5-year Capital Plan and is included in the FY2026 Budget. Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Archer and Derby PW Annex Landscaping, Material Storage Bins, Paving, and Miscellaneous Site Work Design and Construction Engineering BOARD ACTION REQUESTED Pass A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Archer and Derby PW Annex Landscaping, Material Storage Bins, Paving, and Miscellaneous Site Work Design and Construction Engineering ATTACHMENTS A Resolution Approving Professional Services Agreement Between HR Green, Inc. and Village of Lemont, Illinois for Archer and Derby PW Annex Landscaping, Material Storage Bins, Paving, and Misc Site Work Design and Construction Eng.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R-,� -25 A RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR ARCHER AND DERBY PW ANNEX LANDSCAPING, MATERIAL STORAGE BINS, PAVING, AND MISCELLANEOUS SITE WORK DESIGN AND CONSTRUCTION ENGINEERING JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DA VE MAHER KEN MCCLAFFERTY KEVINSHAUGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on _q-_H2025 RESOLUTION NO. R- -25 A RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR ARCHER AND DERBY PW ANNEX LANDSCAPING, MATERIAL STORAGE BINS, PAVING, AND MISCELLANEOUS SITE WORK DESIGN AND CONSTRUCTION ENGINEERING WHEREAS the Village of Lemont, Counties of Cook, Will, and DuPage, Illinois, ("the Village") is a municipality in the State of Illinois with full powers to enact Ordinances and adopt Resolutions for the benefits of the residents of the Village; and WHEREAS, the Village and HR Green, Inc. wish to enter a professional services agreement for Archer and Derby PW Annex Landscaping, Material Storage Bins, Paving, and Miscellaneous Site Work Design and Construction Engineering as further outlined in the professional services agreement attached hereto as Exhibit A ("Agreement"); and WHEREAS, the Mayor and Board of Trustees find that it is in the best interests of the Village to authorize the Agreement attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety. SECTION 2: The Mayor and Board of Trustees of the Village of Lemont hereby approve the Agreement with HR Green, Inc. in substantially the same form as attached hereto as Exhibit A, subject to attorney review. SECTION 3: The Mayor and Clerk are hereby authorized, respectively, to execute the Agreement with HR Green, Inc. SECTION 4: This Resolution, and its parts, are declared to be severable and any section, subsection, sentence, clause, provision, or portion of this Resolution that is declared invalid such decision shall not affect the validity of any other portion of this Resolution, which shall remain in full force and effect. SECTION 5: All Resolutions and Ordinances in conflict herewith are hereby repealed to the extent of such conflict. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS 14 -6) DAY OF 7 2025. Janelle Kittridge Dave Maher Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES t/ CHARLENE M. SMOLLEN Village Clerk It L I t4 00 ABSENT: ABSTAIN: JOHN EGOFSKE President Exhibit A Professional Services Agreement for Archer and Derby PW Annex Landscaping, Material Storage Bins, Paving, and Miscellaneous Site Work Design and Construction Engineering HRGreen. PROFESSIONAL SERVICES AGREEMENT For Landscaping, Material Storage Bins, Paving, and Misc Site Work Design & Construction Engineering Village of Lemont Mr. George Schafer Village Administrator 418 Main Street Lemont, IL 60439 Ph: 630.257.1550 Bruce A. Hill, PE Municipal Executive — Municipal Services Engineering HR Green, Inc. 323 Alana Drive New Lenox, IL 60451 Ph: 815.462.9324 Project No. 2303726 April 6, 2025 Version 2.3 02052021 TABLE OF CONTENTS 1.0 SCOPE OF SERVICES 2.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT 3.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES 4.0 SERVICES BY OTHERS 5.0 CLIENT RESPONSIBILITIES 6.0 PROFESSIONAL SERVICES FEE 7.0 TERMS AND CONDITIONS Version2.3 02052021 Professional Services Agreement Landscaping, Material Storage Bins, Paving, and Misc Site Work HR Green Project No.: 2303726 April H RGreen ® Page 1 of 5 THIS AGREEMENT is between the Village of Lemont (hereafter "CLIENT") and HR Green, Inc. (hereafter "COMPANY"). 1.0 Scope of Services The CLIENT agrees to employ COMPANY to perform the following services: Preliminary and General Work 1.1 Conduct an onsite kick-off meeting with Village reps to review the project scope and to discuss key elements. 1.2 Design Criteria/Assumptions. 1. Concrete Pad to be designed based on specifications from Bulk Storage Salt Domes 2. This project is the last phase of a larger project taking place at the Lemont Water Tower/Annex Site location at the SWC of Archer Avenue and Derby Road. Design Phase Services 1.3 Prepare construction drawings anticipated as the following sheets (for 50% and 100% design stages): General 1. Cover Sheet with Location Map and Sheet Index 2. General Construction Notes, Standard Symbols, and Summary of Quantities Civil Plans 3. Site Layout Sheet 4. Paving Sheet 5. Site Landscaping Plan Sheet Construction Details 6. Typical Sections 7. Material Storage Bins Structural Specifications SWPPP 8. Erosion & Sediment Control Specifications Traffic Control 9. Illinois DOT Highway Standards 701301-04, 701501-06, & 701801-06 10. Illinois DOT Highway Standards TC-13 & TC-10 1.4 Prepare construction specifications and contract documents using CLIENT and Illinois DOT Standard Specifications (for 50% and 100% design stages). Version2.3 02052021 Professional Services Agreement Landscaping, Material Storage Bins, Paving, and Misc Site Work HR Green Project No.: 2303726 H RG reen . AprilPage2 of 5 1.5 Prepare an Opinion of Probable Cost for the project at the 50% complete milestone. Provide a final Opinion of Probable Cost for the project to file with the completed documents. 1.6 Submit three (3) copies of the drawings, specifications, contract documents, and Opinion of Probable Cost at the 50% complete milestone to CLIENT for review. 1.7 Provide an internal quality assurance and quality control review of final documents. 1.8 Develop a final project schedule for advertisement, bidding, and construction completion. 1.9 Submit three (3) copies of final drawings, specifications, contract documents, and Opinion of Probable Cost for permitting by the CLIENT (please note, while this can be considered the 90% design stage, the plans will be closer to 100% complete.): 1.10 Bid Phase Services. Construction Phase Services 1.11 Coordinate and attend preconstruction meeting 1.12 Construction layout 1.13 Project coordination with any other site projects that are still ongoing 1.14 Construction Observation 1.15 Material Testing (by others) 1.16 Contract Closeout 1.17 MWRD Permit Closeout The total construction fee was based on an average of 2-4 hours per working day to accomplish the HR Green related tasks above. Disclaimer COMPANY shall not supervise, direct or have any control over the contractor's work. COMPANY shall not have any responsibility for the construction means, methods, techniques, sequences or procedures selected by the contractor. Also, COMPANY is not responsible for the contractor's safety precautions or programs in connection with this work. These rights and responsibilities are solely those of the contractor. COMPANY shall not be responsible for any acts or omissions of the contractor, subcontractor or any entity performing any portion or the work, or any agents or employees of any of them. COMPANY does not guarantee the performance of the contractor and shall not be responsible for the contractor's failure to perform its work in accordance with the contract drawings and documents. Version2.3 02052021 Professional Services Agreement Landscaping, Material Storage Bins, Paving, and Misc Site Work HR Green Project No.: 2303726 6, 2025 H RG Teen ® AprilPage3 of 5 2.0 Deliverables and Schedules Included in this Agreement The Project shall be initiated upon authorization by CLIENT. 1. Notice to Proceed — NTP.................................................................................... April, 2025 2. 50% complete documents to Village .............................................. Week of June 16th, 2025 3. 50% complete review meeting ..................................................... Week of June 23,d, 2025 4. 100% complete documents to Village ......................................... Week of July 7th, 2025 5. Permit review comments and Final Documents ............................... Week of July 14th, 2025 6. Bid opening..................................................................................................August 1st , 2025 7. Award....................................................................................... August 11th, 2025 8. Construction Begin ...................................................... Week of September 1st, 2025 9. Construction Substantial Complete .................................. Week of November 17th, 2025 This schedule was prepared to include reasonable allowances for review and approval times required by the CLIENT and public authorities having jurisdiction over the project. This schedule shall be equitably adjusted as the project progresses, allowing for changes in the scope of the project requested by the CLIENT or for delays or other causes beyond the control of COMPANY. 3.0 Items not included in Agreement/Supplemental Services The following items are not included as part of this AGREEMENT: N/A Supplemental services not included in the AGREEMENT can be provided by COMPANY under separate agreement, if desired. 4.0 Services by Others Seeco Consultants, Inc. will perform the following services: Asphalt Testing 5.0 Client Responsibilities N/A 6.0 Professional Services Fee 6.1 Fees The fee for services will be based on COMPANY standard hourly rates current at the time the AGREEMENT is signed. These standard hourly rates are subject to change upon 30 days' written notice. Non -salary expenses directly attributable to the project such as: (1) living and traveling expenses of employees when away from the home office on business connected with the project; (2) identifiable communication expenses; (3) identifiable Version2.3 02052021 Professional Services Agreement Landscaping, Material Storage Bins, Paving, and Misc Site Work HR Green Project No.: 2303726 H RG reen ® AprilPage4 of 5 reproduction costs applicable to the work; and (4) outside services will be charged in accordance with the rates current at the time the service is done. 6.2 Invoices Invoices for COMPANY's services will be submitted, on a monthly basis. Invoices will be due and payable upon receipt in accordance with the Illinois Prompt Payment Act 50ILCS 505. If any invoice is not paid within these timelines, COMPANY may, without waiving any claim or right against the CLIENT, and without liability whatsoever to the CLIENT, suspend or terminate the performance of services. 6.3 Extra Services Any service required but not included as part of this AGREEMENT shall be considered extra services. Extra services will be billed on a Time and Material basis with prior approval of the CLIENT. 6.4 Exclusion This fee does not include attendance at any meetings or public hearings other than those specifically listed in the Scope of Services. These service items are considered extra and are billed separately on an hourly basis. 6.5 Payment The CLIENT AGREES to pay COMPANY on the following basis: Time and material basis with a Not to Exceed fee of $40,000.00. 7.0 Terms and Conditions This Agreement is an addendum to and is considered part of the Master Agreement between CLIENT and COMPANY. All terms and conditions contained in that agreement apply to this Agreement. Version2.3 02052021 Professional Services Agreement Landscaping, Material Storage Bins, Paving, and Misc Site Work HR Green Project No.: 2303726 HRGreen. AprilPage5 of 5 This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties signing and dating the AGREEMENT. Services will not begin until COMPANY receives a signed agreement. COMPANY's services shall be limited to those expressly set forth in this AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project except as agreed to in writing. The effective date of the AGREEMENT shall be the last date entered below. Sincerely, HR GREEN, INC. 4 Bruce A. Hill Municipal Executive — Municipal Services — Engineering Approved by: Printed/Typed Name: Timothy J. Hartnett Title: President — Municipal Services Date: April 6, 2025 VILLAGE OF LEMONT Accepted by: Printed/Typed Name: George Schafer Title: Village Administrator Date: J:\2023\2303726\Admin\Contract\Client\PSA 2303726 Lemont IL-PUBWKS-Lands-MatStorBinsMiscSite-4.6.2025.docx Version2.3 02052021