R-09-25 Approving Award of Contract 127th Street Crossing at Rolling Meadows Drive Pedestrian CrosswalkTO:
FROM:
THROUGH:
SUBJECT:
418 Main Street I Lemont, IL 60439
Village Board Meeting
Ted Friedley
A Resolution Approving Award of Contract 127th Street Crossing at Rolling
Meadows Drive Pedestrian Crosswalk
DATE: February 10, 2025
SUMMARY/BACKGROUND
Seven (7) bids were received on January 31, 2025 for the 127th Street Crossing at Rolling
Meadows Drive Pedestrian Crosswalk project, which work includes earth excavation,
combination curb & gutter removal and replacement, cement sidewalks 5 and 8 inch,
detectable warnings, modified urethane pavement marking, sign panels, rectangular rapid
flashing beacon systems, raised reflective pavement markers, and all appurtenant
construction.
The low bid was submitted by Gallagher Asphalt Corporation, 18100 South Indiana Avenue,
Thornton, IL 60476 in the amount of $122,075.00, under the Engineer's estimate of
$183,220.00.
ANALYSIS
The 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk is consistent with
the Village's 5-year Capital Plan and $125,000.00 has been included in the FY25 Budget.
The Village has received ARPA grant funds in the amount of $125,000.00 through invest in
Cook for this project.
Consistency with Village Policy
5-Year Capital Improvement Plan (if applicable)
STAFF RECOMMENDATION
Pass Resolution Approving Award of Contract 127th Street Crossing at Rolling Meadows
Drive Pedestrian Crosswalk
BOARD ACTION REQUESTED
Pass Resolution Approving Award of Contract 127th Street Crossing at Rolling Meadows
Drive Pedestrian Crosswalk
ATTACHMENTS
A Resolution Approving Award of Contract 127th Street Crossing at Rolling Meadows Drive
Pedestrian Crosswalk.pdf
VILLAGE OF LEMONT
RESOLUTION
NUMBER R- V-f -25
A RESOLUTION APPROVING AWARD OF CONTRACT 127TH STREET CROSSING
AT ROLLING MEADOWS DRIVE PEDESTRIAN CROSSWALK
JOHN EGOFSKE, Village President
CHARLENE M. SMOLLEN, Clerk
JANELLE KITTRIDGE
DAVE MAHER
KEN MCCLAFFERTY
KEVIN SHA UGHNESSY
RICK SNIEGOWSKI
RON STAPLETON
Trustees
Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on!1= 2025
RESOLUTION NO. R- 01 -25
A RESOLUTION APPROVING AWARD OF CONTRACT 127TH STREET CROSSING
AT ROLLING MEADOWS DRIVE PEDESTRIAN CROSSWALK
WHEREAS the Village of Lemont requires that the 127th Street Crossing at Rolling
Meadows Drive Pedestrian Crosswalk Project be completed; and
WHEREAS, the Village seeks to utilize the services of Gallagher Asphalt for such work;
and
WHEREAS, Gallagher Asphalt, 18100 South Indiana Avenue, Thornton, IL 60476,
submitted a low bid for such work in the amount of $122,075.00.
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of
the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows:
SECTION 1:
The agreement attached hereto as Exhibit A is hereby approved.
SECTION 2:
The Village Administrator is hereby authorized to execute the agreement and to make
minor changes to the document prior to execution that do not materially alter the Village's
obligations, to execute any other agreements and documentation as well as to take any other steps
necessary to carry out this resolution.
SECTION 3:
This Resolution shall be in full force and effect from and after its passage and approval as
provided by law.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS,
ON THIS 0 DAY OF -+A(Lt6(q 2025.
PRESIDENT AND VILLAGE BOARD MEMBERS:
AYES: NAYES: ABSENT:
Janelle Kittridge
Dave Maher
Ken McClafferty
Kevin Shaughnessy
Rick Sniegowski
Ron Stapleton
AT
_gyp
�C j
CHARLENE M. SMOLLEN
Village Clerk
G� 0 F � F
Q �o
/ZLIN4\S
VA
JOHN EGOFSKE
President
ABSTAIN:
Exhibit A
127"' Street Pedestrian Crossing Project Contract Page
Contract for 127th Street Crossing at Rolling Meadows Drive Pedestrian
Crosswalk
1. THIS AGREEMENT, made and concluded the day of between the Village of
Lemont, acting by and through the Village Administrator as the party of the first part, and
Gallagher Asphalt Corporation 18100 S. Indiana Avenue, Thornton, IL 60476, his/their
executors, administrators, successors or assigns, known as the party of the second part.
2. WITNESSETH: That for and in consideration of the payments and agreements
mentioned in the Proposal hereto attached, to be made and performed by the party of the first
part and according to the terms expressed in the Bond referring to these presents, the party of
the second part agrees with said party of the first part at his/their own proper cost and expense
to do all the work, furnish all the materials and all labor necessary to complete the work in
accordance with the Plans and Specifications hereinafter described, and in full compliance with
all of the terms of this agreement and the requirements of the Engineer under it.
3. AND, it is also understood and agreed that the Notice to Contractors, Special Provisions,
Proposal and Contract Bond hereto attached, and the Plans as prepared by HR Green, Inc. and
designated as 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk all
essential documents of this Contract, and are a part hereto.
4. IN WITNESS WHEREOF, the said parties have executed these presents on the date
above mentioned.
T: O
Cha ne M. Smollen, C1dk
v y
(R A j
Secretary
(Corporate Seal),
Party of the First Part
The VILLAGE OF LE ONT
By
ge Schafer, Village
Adminis
Party of the Second Part
(If a Corporation)
Corporate Name:
Gallagher Asphalt Corporation
President
(If a Co -Partnership)
(SEAL)
(SEAL)
Partners doing Business under the name
of
(If an Individual)
(SEAL)
Exhibit B
Engineer's Letter, Bid Tabulation Listing
HRGreen.
January 31, 2025
Mr. George Schafer
Village Administrator
Village of Lemont
418 Main Street
Lemont, IL 60439
Re: 127th Street Pedestrian Crossing
HRG #2303243
Bid Tabulation
Dear George:
10, 323 Alana Drive
New Lenox, IL 60451
Main 815.462.9324 + Fax 713.965.0044
10- H RG R E E N. C 0 M
Listed below and on the attached Tabulation of Bids are the results of the January 31, 2025, bid opening for the
above -captioned project. Seven (7) bids were received and checked for accuracy, with computational errors found
for 3 of the 7 bids listed below. The results are as follows:
Gallagher Asphalt
Davis Concrete Construction
Miller Pipeline, LLC.
MYS Incorporated
Alliance Contractors, Inc.
J & J Newell Concrete
McGill Construction, LLC.
Engineer's Estimate
$122,075.00
$131,737.25
$139,644.06 (cost correction as read)
$140,713.99 (cost correction as read)
$144,126.30
$163,931.00
$175,404.70 (cost correction as read)
$183,220.00
The lowest bid was Gallagher Asphalt submitting a bid in the amount of $122,075.00 which was below the
Engineer's Estimate of $183,220.00.
Gallagher Asphalt is qualified to perform this work. Therefore, we recommend that the Contract be awarded to
Gallagher Asphalt, 18100 South Indiana Avenue, Thornton, IL 60476, in the amount of $122,075.00.
Please call if you have any questions regarding this matter.
Sincerely,
HR GREEN, INC.
Bruce Hill, P.E.
Municipal Services Executive
Attachments
J A2023\23032431Design\Bid\ tr_013125_Letter _of_ Recommendation _127th_St_Pedestrian_Crossing.dacx
3
I��
��
Wi"�
�gg$$880888$88888.88�8%8
s$88$88R�RN9p
Amx
s���S9a9SA�j
$88p888$
Y
@
J
e$R
em
°�
s�maam»g$sa»m�-gga
$s$sgas�$a.$eRSSEsoa$�R
z$
$
c.^
aaa»a�aaa
awn
$'"�,�'a,m„W„A�
°a
ES
5
a�
a
4�
•
ai
BvA�seS^w'.".m
$Ae$R$RRJ'g$°^R8R$
$�0�V����aax
a
rc
7
g
g
�Oa
Y
tti
L
8'
mY
�g
aCEd
s:`z__
�=t3
Exhibit C
Project Design and Photos of Similarly Designed Project
-------------
------------ - - ----------- ------------ -- -
-- - ------ - ------- -- ------ ----------- --- - ---- -
- - -- - --------
90
i 9
LD
LL
2
10
;Q0
INS
- ---------
----------------------------
ax
i
lblm_ . . ShiL--- a
Lamm mm
�II�I
I II v..
IIII
II
�I
k
77 7-
!i
is
H
wi,