Loading...
R-09-25 Approving Award of Contract 127th Street Crossing at Rolling Meadows Drive Pedestrian CrosswalkTO: FROM: THROUGH: SUBJECT: 418 Main Street I Lemont, IL 60439 Village Board Meeting Ted Friedley A Resolution Approving Award of Contract 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk DATE: February 10, 2025 SUMMARY/BACKGROUND Seven (7) bids were received on January 31, 2025 for the 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk project, which work includes earth excavation, combination curb & gutter removal and replacement, cement sidewalks 5 and 8 inch, detectable warnings, modified urethane pavement marking, sign panels, rectangular rapid flashing beacon systems, raised reflective pavement markers, and all appurtenant construction. The low bid was submitted by Gallagher Asphalt Corporation, 18100 South Indiana Avenue, Thornton, IL 60476 in the amount of $122,075.00, under the Engineer's estimate of $183,220.00. ANALYSIS The 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk is consistent with the Village's 5-year Capital Plan and $125,000.00 has been included in the FY25 Budget. The Village has received ARPA grant funds in the amount of $125,000.00 through invest in Cook for this project. Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass Resolution Approving Award of Contract 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk BOARD ACTION REQUESTED Pass Resolution Approving Award of Contract 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk ATTACHMENTS A Resolution Approving Award of Contract 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R- V-f -25 A RESOLUTION APPROVING AWARD OF CONTRACT 127TH STREET CROSSING AT ROLLING MEADOWS DRIVE PEDESTRIAN CROSSWALK JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DAVE MAHER KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on!1= 2025 RESOLUTION NO. R- 01 -25 A RESOLUTION APPROVING AWARD OF CONTRACT 127TH STREET CROSSING AT ROLLING MEADOWS DRIVE PEDESTRIAN CROSSWALK WHEREAS the Village of Lemont requires that the 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk Project be completed; and WHEREAS, the Village seeks to utilize the services of Gallagher Asphalt for such work; and WHEREAS, Gallagher Asphalt, 18100 South Indiana Avenue, Thornton, IL 60476, submitted a low bid for such work in the amount of $122,075.00. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: The agreement attached hereto as Exhibit A is hereby approved. SECTION 2: The Village Administrator is hereby authorized to execute the agreement and to make minor changes to the document prior to execution that do not materially alter the Village's obligations, to execute any other agreements and documentation as well as to take any other steps necessary to carry out this resolution. SECTION 3: This Resolution shall be in full force and effect from and after its passage and approval as provided by law. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS 0 DAY OF -+A(Lt6(q 2025. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES: ABSENT: Janelle Kittridge Dave Maher Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton AT _gyp �C j CHARLENE M. SMOLLEN Village Clerk G� 0 F � F Q �o /ZLIN4\S VA JOHN EGOFSKE President ABSTAIN: Exhibit A 127"' Street Pedestrian Crossing Project Contract Page Contract for 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk 1. THIS AGREEMENT, made and concluded the day of between the Village of Lemont, acting by and through the Village Administrator as the party of the first part, and Gallagher Asphalt Corporation 18100 S. Indiana Avenue, Thornton, IL 60476, his/their executors, administrators, successors or assigns, known as the party of the second part. 2. WITNESSETH: That for and in consideration of the payments and agreements mentioned in the Proposal hereto attached, to be made and performed by the party of the first part and according to the terms expressed in the Bond referring to these presents, the party of the second part agrees with said party of the first part at his/their own proper cost and expense to do all the work, furnish all the materials and all labor necessary to complete the work in accordance with the Plans and Specifications hereinafter described, and in full compliance with all of the terms of this agreement and the requirements of the Engineer under it. 3. AND, it is also understood and agreed that the Notice to Contractors, Special Provisions, Proposal and Contract Bond hereto attached, and the Plans as prepared by HR Green, Inc. and designated as 127th Street Crossing at Rolling Meadows Drive Pedestrian Crosswalk all essential documents of this Contract, and are a part hereto. 4. IN WITNESS WHEREOF, the said parties have executed these presents on the date above mentioned. T: O Cha ne M. Smollen, C1dk v y (R A j Secretary (Corporate Seal), Party of the First Part The VILLAGE OF LE ONT By ge Schafer, Village Adminis Party of the Second Part (If a Corporation) Corporate Name: Gallagher Asphalt Corporation President (If a Co -Partnership) (SEAL) (SEAL) Partners doing Business under the name of (If an Individual) (SEAL) Exhibit B Engineer's Letter, Bid Tabulation Listing HRGreen. January 31, 2025 Mr. George Schafer Village Administrator Village of Lemont 418 Main Street Lemont, IL 60439 Re: 127th Street Pedestrian Crossing HRG #2303243 Bid Tabulation Dear George: 10, 323 Alana Drive New Lenox, IL 60451 Main 815.462.9324 + Fax 713.965.0044 10- H RG R E E N. C 0 M Listed below and on the attached Tabulation of Bids are the results of the January 31, 2025, bid opening for the above -captioned project. Seven (7) bids were received and checked for accuracy, with computational errors found for 3 of the 7 bids listed below. The results are as follows: Gallagher Asphalt Davis Concrete Construction Miller Pipeline, LLC. MYS Incorporated Alliance Contractors, Inc. J & J Newell Concrete McGill Construction, LLC. Engineer's Estimate $122,075.00 $131,737.25 $139,644.06 (cost correction as read) $140,713.99 (cost correction as read) $144,126.30 $163,931.00 $175,404.70 (cost correction as read) $183,220.00 The lowest bid was Gallagher Asphalt submitting a bid in the amount of $122,075.00 which was below the Engineer's Estimate of $183,220.00. Gallagher Asphalt is qualified to perform this work. Therefore, we recommend that the Contract be awarded to Gallagher Asphalt, 18100 South Indiana Avenue, Thornton, IL 60476, in the amount of $122,075.00. Please call if you have any questions regarding this matter. Sincerely, HR GREEN, INC. Bruce Hill, P.E. Municipal Services Executive Attachments J A2023\23032431Design\Bid\ tr_013125_Letter _of_ Recommendation _127th_St_Pedestrian_Crossing.dacx 3 I�� �� Wi"� �gg$$880888$88888.88�8%8 s$88$88R�RN9p Amx s���S9a9SA�j $88p888$ Y @ J e$R em °� s�maam»g$sa»m�-gga $s$sgas�$a.$eRSSEsoa$�R z$ $ c.^ aaa»a�aaa awn $'"�,�'a,m„W„A� °a ES 5 a� a 4� • ai BvA�seS^w'.".m $Ae$R$RRJ'g$°^R8R$ $�0�V����aax a rc 7 g g �Oa Y tti L 8' mY �g aCEd s:`z__ �=t3 Exhibit C Project Design and Photos of Similarly Designed Project ------------- ------------ - - ----------- ------------ -- - -- - ------ - ------- -- ------ ----------- --- - ---- - - - -- - -------- 90 i 9 LD LL 2 10 ;Q0 INS - --------- ---------------------------- ax i lblm_ . . ShiL--- a Lamm mm �II�I I II v.. IIII II �I k 77 7- !i is H wi,