R-10-25 Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for 1,000 Ton Salt Dome Design and Construction EngineeringTILLAGE OF 4d.M0,]VT TO: Village Board Meeting FROM: Ted Friedley, Public Works P-Io-2.6� 418 Main Street I Lemont, IL 60439 THROUGH: SUBJECT: A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for 1,000 Ton Salt Dome Design and Construction Engineering DATE: February 10, 2025 SUMMARY/BACKGROUND HR Green is assisting the Village with design and construction engineering services for the proposed 1,000 ton salt dome at the Water Tower / Public Works Annex Site located at the Southwest corner of Archer Avenue and Derby Road. Funding will come from the Infrastructure Fund. The total time and material, not -to -exceed, cost for the project is $60,000.00. ANALYSIS This project is consistent with the Village's 5-year Capital Plan. $60,000.00 has been budgeted in FY25 for design and construction engineering for this project. Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for 1,000 Ton Salt Dome Design and Construction Engineering BOARD ACTION REQUESTED Pass Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for 1,000 Ton Salt Dome Design and Construction Engineering ATTACHMENTS A Resolution Approving Professional Services Agreement Between HR Green and the Village of Lemont, Illinois for 1,000 Ton Salt Dome Design and Construction Engineering.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R- I'D -25 A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR 1,000 TON SALT DOME DESIGN AND CONSTRUCTION ENGINEERING JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DA VE MAHER KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont oeri'" � 2025 RESOLUTION NO. R- � O -25 A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR 1,000 TON SALT DOME DESIGN AND CONSTRUCTION ENGINEERING WHEREAS the Village of Lemont, Counties of Cook, Will, and DuPage, Illinois, ("the Village") is a municipality in the State of Illinois with full powers to enact Ordinances and adopt Resolutions for the benefits of the residents of the Village; and WHEREAS, the Village and HR Green, Inc. wish to enter a professional services agreement for 1,000 Ton Salt Dome Design and Construction Engineering as further outlined in the professional services agreement attached hereto as Exhibit A ("Agreement"); and WHEREAS, the Mayor and Board of Trustees find that it is in the best interests of the Village to authorize the Agreement attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety. SECTION 2: The Mayor and Board of Trustees of the Village of Lemont hereby approve the Agreement with HR Green, Inc. in substantially the same form as attached hereto as Exhibit A, subject to attorney review. SECTION 3: The Mayor and Clerk are hereby authorized, respectively, to execute the Agreement with HR Green, Inc. SECTION 4: This Resolution, and its parts, are declared to be severable and any section, subsection, sentence, clause, provision, or portion of this Resolution that is declared invalid such decision shall not affect the validity of any other portion of this Resolution, which shall remain in full force and effect. SECTION 5: All Resolutions and Ordinances in conflict herewith are hereby repealed to the extent of such conflict. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, OUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS �0 DAY OF f 2025. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES: ABSENT: ABSTAIN: Janelle Kittridge Dave Maher Ken McClafferty Kevin Shaughnessy Rick Sniegowski f Ron Stapleton ATTEST: JOHN EGOFSKE President CHARLENE .SMOLLEN Village Clerk 0FtF v �O v y 7 4LIN0' Exhibit A 1,000 Ton Salt Dome Design and Construction Engineering Agreement HRGreen® PROFESSIONAL SERVICES AGREEMENT For Lemont, IL - PUBWKS - 1000 Ton Salt Dome Design & Construction Engineering Village of Lemont Mr. George Schafer Village Administrator 418 Main Street Lemont, IL 60439 Ph: 630.257.1550 Bruce A. Hill, PE Municipal Executive — Municipal Services Engineering HR Green, Inc. 323 Alana Drive New Lenox, IL 60451 Ph: 815.462.9324 Project No. 2303734 February 3, 2025 Version 2.3 02052021 TABLE OF CONTENTS 1.0 SCOPE OF SERVICES 2.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT 3.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES 4.0 SERVICES BY OTHERS 5.0 CLIENT RESPONSIBILITIES 6.0 PROFESSIONAL SERVICES FEE 7.0 TERMS AND CONDITIONS Version2.3 02052021 HRGreen. Professional Services Agreement Lemont, IL — PUBWKS - 1000 Ton Salt Dome HR Green Project No.: 2303734 February 3, 2025 Page 1 of 4 THIS AGREEMENT is between the Village of Lemont (hereafter "CLIENT') and HR Green, Inc. (hereafter "COMPANY'). 1.0 Scope of Services The CLIENT agrees to employ COMPANY to perform the following services: Preliminary and General Work 1.1 Conduct an onsite kick-off meeting with Village reps to review the project scope and to discuss key elements. 1.2 Design Criteria/Assumptions. - Concrete Pad to be designed based on specifications from Bulk Storage Salt Domes - The Salt Dome is part of larger project taking place at the Lemont Water Tower/Annex Site location at the SWC of Archer Avenue and Derby Road. Design Phase Services 1.3 Prepare construction drawings anticipated as the following 8 Sheets (for 50% and 100% design stages): General 1. Cover Sheet with Location Map and Sheet Index 2. General Construction Notes, Standard Symbols, and Summary of Quantities Civil Plans 3. Site Layout Sheet 4. Paving Sheet Construction Details 5. Typical Sections SWPPP 6. Erosion & Sediment Control Specifications Traffic Control 7. Illinois DOT Highway Standards 701301-04, 701501-06, & 701801-06 8. Illinois DOT Highway Standards TC-13 & TC-10 1.4 Prepare construction specifications and contract documents using CLIENT and Illinois DOT Standard Specifications (for 50% and 100% design stages). 1.5 Prepare an Opinion of Probable Cost for the project at the 50% complete milestone. Provide a final Opinion of Probable Cost for the project to file with the completed documents. 1.6 Submit three (3) copies of the drawings, specifications, contract documents, and Opinion of Probable Cost at the 50% complete milestone to CLIENT for review. Version2.3 02052021 Professional Services Agreement Lemont, IL — PUBWKS - 1000 Ton Salt Dome HR Green Project No.: 2303734 February 3, 2025 H RGreen . Page 2 of 4 1.7 Provide an internal quality assurance and quality control review of final documents 1.8 Develop a final project schedule for advertisement, bidding, and construction completion. 1.9 Submit three (3) copies of final drawings, specifications, contract documents, and Opinion of Probable Cost for permitting by the CLIENT (please note, while this can be considered the 90% design stage, the plans will be closer to 100% complete.): 1.10 Bid Phase Services. Construction Phase Services 1.11 Coordinate & attend preconstruction meeting. 1.12 Construction layout of concrete pad. 1.13 Project coordination with the selected contractor building the salt dome and concrete walls. 1.14 Construction Observation. 1.15 Material Testing (by others). 1.16 Contract Closeout. Disclaimer COMPANY shall not supervise, direct or have any control over the contractor's work. COMPANY shall not have any responsibility for the construction means, methods, techniques, sequences or procedures selected by the contractor. Also, COMPANY is not responsible for the contractor's safety precautions or programs in connection with this work. These rights and responsibilities are solely those of the contractor. COMPANY shall not be responsible for any acts or omissions of the contractor, subcontractor or any entity performing any portion or the work, or any agents or employees of any of them. COMPANY does not guarantee the performance of the contractor and shall not be responsible for the contractor's failure to perform its work in accordance with the contract drawings and documents. 2.0 Deliverables and Schedules Included in this Agreement The Project shall be initiated upon authorization by CLIENT. 1. Notice to Proceed — NTP....................................................................... February 111h, 2025 2. 50% complete documents to Village ........................................... Week of March 171h, 2025 3. 50% complete review meeting ..................................................... Week of March 171h, 2025 4. 100% complete documents to Village ......................................... Week of April 1 s', 2025 5. Permit review comments and Final Documents ................................ Week of April 1 s', 2025 6. Bid opening....................................................................................................April 18'h , 2025 7. Award........................................................................................... April 281h, 2025 Version2.3 02052021 HRGreen. Professional Services Agreement Lemont, IL — PUBWKS - 1000 Ton Salt Dome HR Green Project No.: 2303734 February 3, 2025 Page 3 of 4 Construction Begin...............................................................Week of June 2"d, 2025 Construction Substantial Complete....................................Week of September 81h, 2025 This schedule was prepared to include reasonable allowances for review and approval times required by the CLIENT and public authorities having jurisdiction over the project. This schedule shall be equitably adjusted as the project progresses, allowing for changes in the scope of the project requested by the CLIENT or for delays or other causes beyond the control of COMPANY. 3.0 Items not included in Agreement/Supplemental Services N/A Supplemental services not included in the AGREEMENT can be provided by COMPANY under separate agreement, if desired. 4.0 Services by Others Seeco Consultants, Inc. - Concrete Testing - LPC 662/663 Forms 5.0 Client Responsibilities N/A 6.0 Professional Services Fee 6.1 Fees The fee for services will be based on COMPANY standard hourly rates current at the time the AGREEMENT is signed. These standard hourly rates are subject to change upon 30 days' written notice. Non -salary expenses directly attributable to the project such as: (1) living and traveling expenses of employees when away from the home office on business connected with the project; (2) identifiable communication expenses; (3) identifiable reproduction costs applicable to the work; and (4) outside services will be charged in accordance with the rates current at the time the service is done. 6.2 Invoices Invoices for COMPANY's services will be submitted, on a monthly basis. Invoices will be due and payable upon receipt in accordance with the Illinois Prompt Payment Act 50ILCS 505. If any invoice is not paid within these timelines, COMPANY may, without waiving any claim or right against the CLIENT, and without liability whatsoever to the CLIENT, suspend or terminate the performance of services. 6.3 Extra Services Any service required but not included as part of this AGREEMENT shall be considered extra services. Extra services will be billed on a Time and Material basis with prior approval of the CLIENT. Version2.3 02052021 Professional Services Agreement Lemont, IL — PUBWKS - 1000 Ton Salt Dome HR Green Project No.: 2303734 February 3, 2025 Page 4 of 4 6.4 Exclusion This fee does not include attendance at any meetings or public hearings other than those specifically listed in the Scope of Services. These service items are considered extra and are billed separately on an hourly basis. 6.5 Payment The CLIENT AGREES to pay COMPANY on the following basis: Time and material basis with a Not to Exceed fee of $60,000.00. 7.0 Terms and Conditions This Agreement is an addendum to and is considered part of the Master Agreement between CLIENT and COMPANY. All terms and conditions contained in that agreement apply to this Agreement. This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties signing and dating the AGREEMENT. Services will not begin until COMPANY receives a signed agreement. COMPANY's services shall be limited to those expressly set forth in this AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project except as agreed to in writing. The effective date of the AGREEMENT shall be the last date entered below. Sincerely, HR GREEN, INC. Z 4 Bruce A. Hill Municipal Executive — Governmental Services ring Approved by: Printed/Typed Name: Timothy J. Hartnett President — Municipal Services / Title: Principal Date: February 3, 2025 VILLAGE OF LEMONT Accepted by: Printed/Typed Name: Title: Village Administrator Date: J:\2023\2303734\Admin\Contract\Client\PSA_2303734_Lemont-PUBWKS-1000 Ton Salt Dome_2.3.2025.docx Version2.3 02052021