Loading...
R-80-24 Authorizing 12421 Archer Avenue Building Demolition Agreement with Hoppy's Landscaping, IncVILLAGE OF flEMONT P-so-7,q 418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Authorizing 12421 Archer Avenue Building Demolition Agreement with Hoppy's Landscaping, Inc DATE: October 28, 2024 SUMMARY/BACKGROUND Public Works staff obtained three (3) quotes for the demolition of the home located on the new water tower property at 12421 Archer Avenue (Archer & Derby). One quote did not contain necessary pricing of all items. Hoppy's Landscaping provided the quote of $26,000 not including permit fees. The building needs to be removed to proceed with the rest of the plans on the tower site, including a salt storage dome and storage barn. Staff are requesting approval of Hoppy's Landscaping, Inc. proposal to proceed with the demolition. ANALYSIS Consistency with Village Policy STAFF RECOMMENDATION Pass Resolution Waiving Bid Requirements and Authorizing 12421 Archer Avenue Building Demolition Agreement with Hoppy's Landscaping, Inc BOARD ACTION REQUESTED Pass Resolution Waiving Bid Requirements and Authorizing 12421 Archer Avenue Building Demolition Agreement with Hoppy's Landscaping, Inc ATTACHMENTS A Resolution Authorizing 12421 Archer Avenue Building Demoliition Agreement With Hoppy's Landscaping, Inc..pdf VILLAGE OF LEMONT RESOLUTION NUMBER R-W-24 A RESOLUTION AUTHORIZING 12421 ARCHER AVENUE BUILDING DEMOLITION AGREEMENT WITH HOPPY'S LANDSCAPING, INC. JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DAVE MAHER KEN MCCLAFFERTY KEVIN SHAUGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees !0 -2- Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on = _- 24 RESOLUTION NO. R- U ld -24 A RESOLUTION AUTHORIZING 12421 ARCHER AVENUE BUILDING DEMOLITION AGREEMENT WITH HOPPY'S LANDSCAPING, INC. WHEREAS it has become necessary for the building located at 12421 Archer Avenue to be demolished; and WHEREAS, in connection with the work to be conducted on the building demolition at 12421 Archer Avenue, the Village has researched and evaluated available options and contractors; and WHEREAS, upon review by Village staff, it was concluded that the greatest benefit to the Village will be realized by waiving the bidding process and accepting the proposal for building demolition at 12421 Archer Avenue with Hoppy's Landscaping, Inc., 15041 New Avenue, Lockport, IL 60441, in an amount not to exceed $26,000.00; and WHEREAS, Section 5/8-9-1 of the Illinois Municipal Code (65 ILCS 5/8-9-1) allows the Board of Trustees of the Village ("Village Board"), upon a vote of two-thirds of the trustees then holding office, to waive the requirements for competitive bidding; and WHEREAS, The Village Board has determined that it is advisable, necessary, and in the best interest of the Village to waive competitive bidding and authorize the building demolition at 12421 Archer Avenue for $26,000.00. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: Incorporation Recitals. The foregoing findings and recitals are hereby adopted as Section One of this Resolution and are incorporated by reference as if set forth verbatim herein. SECTION 2: Waiver of Public Bid Requirements and Authority to Purchase. The Village Board hereby waives the competitive bidding requirements otherwise applicable to the building demolition at 12421 Archer Avenue by Hoppy's Landscaping, Inc. at a price not to exceed $26,000.00 as Exhibit A. SECTION 3: The Village Administrator or his designee is hereby authorized to execute any documents and take any other steps necessary to complete the building demolition at 12421 Archer Avenue by Hoppy's Landscaping, Inc. at a price not to exceed $26,000.00 and to otherwise carry out this Resolution. SECTION 4: This Resolution shall be in full force and effect from and after its passage and approval as provided by law. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT C TIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS �7 % DAY OF OC y 2024. Janelle Kittridge Dave Maher Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES V/ �1 CHARLENE M. SMOLLEN Village Clerk w /,fit I,% ABSENT: ABSTAIN: JOHN EGOFSKE President Exhibit A Hoppy's Landscaping, Inc. Demolition Proposal HLLM Inc. Phone 630-257-2431 r, 15041 New Ave. Fax 630-257-0771 Lockport, IL 60441 hoppylandscaping@gmai.com July 10, 2024 Ted Friedley Public Works Department 16680 New Avenue Lemont, IL 60439 PROPOSAL for 12521 Archer Avenue, Lemont, IL 60439 Demolition o Disconnect sewer o Cap well o Tear down house o Remove foundation o Fill in foundation to level o Asbestos Inspection $26,000.00 Prices do not include permit fees, final grade, landscaping, soil, air or pressure test, or any other testing or inspections required by municipalities. Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. Signature: Permit Description: Date: 1 I Permit number(s) obtained for our scope of work: Permit M Permit Description: Permit M Exhibit B Master Guys Demolition Proposal Service Address 12421 Archer Ave Lemont, IL 60439 Master Guys Demolition Inc. 7667 W. 95th Street, Suite LL 01 Hickory Hills, IL 60457 Phone: (708) 770-1935 Email: masterguysdemolition@gmail.com Web: Masterguysdemolition.com Description - Demolition of all structures on the property and foundation removal; - Backfill and level the ground to be ready for new construction; Cut water at main & disconnection and seal the sewer at main Notes: Permits and fees not included. Prepared For Village of Lemont 418 Main St Lemont, IL 60439 (630) 257-2532 Estimate # Date cap well cost not include, asbestos cost not included Subtotal Total All scrap and recycling materials will be property of Master Guys Demolition . All debris will e disposed & recycled. Estimate is valid for 60 days. 15722 05/31/2024 $21,500.00 $21,500.00 Page 1 of 4 By signing this document, the customer agrees to the services and conditions outlined in this document. General Conditions: I. The Demolition Contractor agrees to hold harmless the Owner, General Contractor, or their Agents, against damage to life or limb and property by reason of the negligence of the Demolition Contractor, in connection with this contract, and further agrees to carry Worker's Compensation, Employers' Liability Insurance, General Liability Insurance, within the limits of $2,000,000.00, and excess liability umbrella of $3,000,000.00. II. The Agreement is submitted under the assumption that the plans and specifications are complete, and no work is to be included that is not specifically mentioned. Any extra work which the Demolition contractor is requested to perform shall be paid for as extra work. Additional work shall not start unless mutually approved and in writing. III. Owner, Contractor or its Agent represent that it has authority to contract for the wrecking and removal of the buildings and structures as herein before provided and agrees to defend and hold harmless Master Guys Demolition Inc against all suits or actions brought against it and to indemnify it for any and all losses (including attorney's fees and expenses) it may suffer by virtue of any wrongful wrecking and removal of the structures described herein in violation of the property rights of any other person or party. IV. Master Guys Demolition Inc shall not be held liable or be required to pay any amount as damages for delay in completion of this work, and the Owner, Contractor or their *Agents, shall waive all claim for damages against said Master Guys Demolition Inc for its failure to complete the work in a given time, unless this contract states a definite per diem bonus and penalty. In such event, Master Guys Demolition Inc shall not be held liable or required to pay a penalty for time lost for delays beyond its control, including but not limited to Acts of nature, of any governmental body, of the Public Enemy, or Another Contractor, Fire, Flood, Epidemic, Weather, Strikes, Riots, Civil Disturbances, etc. An extension of time for such delays to be allowed in determining the applicability of bonus or penalty. V. Unless otherwise covered in the body of this contract, it is assumed that no party or common wall condition exists. This agreement is tendered on that basis. If such a condition is determined at a later date, any and all engineering or other work involved with the restoration of said party wall shall be considered over and above the contract price stated herein. VI. In the event any action is instituted to enforce any of the provisions of the contract or to collect money due hereunder, Master Guys Demolition, Inc. shall be entitled to reimbursement for any attorney and collection fees or any related expenses that it is obligated to pay. VII. If payment is not made within the time specified, a monthly interest charge of 9.7% will be added to the unpaid balance. Paying with a credit card 3% charge will be applied. VIII. Due to the weight of heavy machinery and trucks, we cannot be responsible for damage to Page 2 of 4 sidewalks and curbs. Due care will be taken to minimize any possible damage. IX. Should Owner cancel this contract, at any point, Owner shall pay Contractor for all costs incurred, thought date of demobilization, including but not limited to: labor, materials and overhead costs, plus profit. Three progress payments are to be made in the amount of 33.3% first payment is to be made upon start date, second upon 50% of completion of obtaining the demolition permit, final payment upon completion of work. SUB -CONTRACTOR ENGAGMENT TO ALL PARTIES YOU DESERVE INFORMATION ABOUT YOUR PROJECT THIS INFORMATION IS PROVIDED BY: Tomasz Gielazyn the President of Master Guys Demolition Inc. FOR THE PROJECT AT: as stated above YOU DESERVE INFORMATION ABOUT YOUR PROJECT, THE ABILITY TO TRACK PARTICIPANTS, WORK PERFORMED, AND VISIBILITY. INFORAMTION IS BEING PROVIDED BY MASTER GUYS DEMOLITION INC TO THE FOLLOWING: OWNER: as stated in the headed cap above CONTRACTOR: Master Guys Demolition Inc, 7667 W. 95th Street, Suite LL 01, Hickory Hills, IL. 60457 MEDIATOR COMPANY as stated in the headed cap above at as stated in the headed cap above WAS HIRED BY the owner of the project TO PROVIDE THE FOLLOWING SERVICES AND MATERIALS: The job which listed above. We are looking forward to a successful, smooth project. Note that if payment disputes do arise and the balance which stated above goes unpaid for work and/or materials provided, the balance which stated above we will be entitled to seek payment via the filing of a mechanic's lien. We are hopeful that the information provided above is helpful to you in managing this project. By making project participants visible, it is easier to promote communication and cooperation, and easier to avoid misunderstandings or disputes. While we try to keep owners fully informed, we cannot do that if any of our information is incorrect. If anything above is not correct, please contact us via e-mail at: masterguysdemolition@gmail.com or telephone at: (708)770-1935 or in writing at: Master Guys Demolition inc, 7667 W. 95TH Street, LL01, Hickory Hills, IL 60457 We greatly look forward to working with you and your team. Tomasz Gielazyn, President Master Guys Demolition Inc 7667 W. 95th Street,Suite LL 01, Page 3 of 4 Hickory Hills, IL. 60457 Village of Lemont Page 4 of 4 Exhibit C Donegal Services Demolition Proposal PROPOSAL Proposal No: 240529.8 Date:5/29/2024 Customer: Village of Lemont Job Address: 12421 Archer Ave, Lemont proposal is presented in accordance with the following plans: architectural dated n/a & engineering dated n/a "FINAL APPROVED PLANS REQUIRED BEFORE ANY WORK CAN BEGIN" "SIGNED AND DATED PROPOSAL REQUIRED BEFORE ANY WORK CAN BEGIN" SEWER AND WELL DISCONNECT.. .. $5,900.00 - Disconnect up to a 5" well up to 150' deep on the property - Disconnect sanitary at the main in the parkway across the street DEMOLITION ..... $20 150.00 Included to be demolished and removed from the site are the following: - Existing house, garage, foundation, drives, private walks, slabs - Public walk and curb are not included IF A RETURN TRIP IS REQUIRED TO REMOVE PUBLIC WALK AND CURB AN ADDITIONAL CHARGE OF $750.00 WILL BE APPLIED TOTAL PROJECT COST ... . $26,050.00 OPTIONS — PLEASE INITIAL BY THE OPTIONS YOU ARE SELECTING Cook County Demo permit - $450.00 Asbestos testing 1 050.00 Machine time to backfill hole 1 $2,000.00 Importing clay free of charge Recycled 3" stone for backfill - $450.00 per load Pulverized black dirt - $550.00 per load EXCLUSIONS Demolition — Removal of any trees, bushes, excessive household debris, draining and removal of Freon from AC units, site or tree protection, black dirt, seeding, permits, utility disconnects, or stone backfill unless specifically noted above. We assume no liability for damage to foundations, sidewalks, driveways, fences, trees or any underground construction damage by equipment or trucks making deliveries. Pools inside the house unless specifically noted on proposal. Excavation —Soil testing, stabilization, compaction, undercuts, additional costs due to contaminated soils or hard to handle material, additional cost due to discrepancies between the plans, or site conditions, unforeseen underground objects, shoring unless specifically noted above, haul off of other trades spoils, protection and repair of landscaping, sidewalks, driveways and curb and gutter from truck and machine traffic or construction activity in the performance of the above work. We assume no liability for damages to fences due to ground conditions and tight lots. Embankment collapses will be billed at time and materials. Sewer, Water & Storm — Protection and repair of landscaping, sidewalks, driveways and curb and gutter from truck and machine traffic or construction activity in the performance of the above work, damage to sidewalks and driveways from shallow directional bores, additional labor, and material due to utility conflicts. We assume no liability for damage to foundations, sidewalks, driveways, fences, trees or any underground construction damage by equipment or trucks making deliveries. Excludes all trench drains and installation unless specific noted above. 2" pvc for future street lighting will be installed if the builder provides the material otherwise it is not included. Replacing neighbors' aprons for disconnects that fall into them. Replacing brick streets. Sewer depth is assumed 9' deep unless specifically noted on plans. 13011 Grant Rd, Lemont, IL 60439 Phone: (630) 321-8200 Fax: (630) 321-8201 Email: estimating@donegalexcavating.com Page 1 of 2 PROPOSAL Proposal No: 240529.8 Date:5/29/2024 Customer: Village of Lemont Job Address: 12421 Archer Ave, Lemont TERMS Payments are due within 30 days of invoice. 1-1/4% (15% annually) finance charge will be applied to all balances still due after 30 days. Customer agrees to pay all collection cost and attorney fees if collection by lawsuit is needed. Any, and all changes from plans referenced above may result in change to contract price. Donegal reserves the right to require deposits/down payments before work is commenced. ACCEPTANCE OF PROPOSAL COVID-19/ War in Ukraine — Donegal Services reserves the right to add on necessary charges to material to supplement for the rise in the market prices due to COVID-19/ War in Ukraine. The additional price will be within supplier cost increase. Donegal Services reserves the right to charge a fuel surcharge due to the volatility of the fuel mark. The above prices, specifications and conditions are satisfactory and are hereby accepted. Donegal Services is authorized to do the work as specified. The above proposal is valid for 30 days. Work on the above project will not begin until a signed proposal is received. Customer Signature Donegal Signature Date Date 13011 Grant Rd, Lemont, IL 60439 Phone: (630) 321-8200 Fax: (630) 321-8201 Email: estimating@donegalexcavating.com Page 2 of 2