Loading...
R-55-24 Authorizing 132nd Street Storm Sewer Improvements�E1VIOIVT 418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Authorizing 132nd Street Storm Sewer Improvements DATE: July 22, 2024 SUMMARY/BACKGROUND Residents of 132nd Street were reporting continuous drainage and flooding issues on private property to both the Village Board and the Township Board. These residents are a mixture of Village of Lemont and Lemont Township. The Township Highway Commissioner and Public Works Director devised a concept plan to alleviate these issues which has been successful. Two contractors were invited on site to discuss the plan and go over final details and negotiate pricing. Riccio Construction has worked for the Village as well as the Township with an excellent track record. The invoice is to be split 50/50 between the Village and the Township. ANALYSIS The 132nd Street Storm Sewer Improvements project was not included in the FY25 Budget Consistency with Village Policy STAFF RECOMMENDATION Pass Resolution Authorizing 132nd Street Storm Sewer Improvements BOARD ACTION REQUESTED Pass Resolution Authorizing 132nd Street Storm Sewer Improvements ATTACHMENTS A Resolution Authorizing 132nd Street Storm Sewer Improvements.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R-5#'- 24 A RESOLUTION AUTHORIZING 132ad STREET STORM SEWER IMPROVEMENTS JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DA VE MAHER KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority ofthe Village President and Board of Trustees of the Village of Lemont on 2 024 RESOLUTION NO. R- 5� -24 A RESOLUTION AUTHORIZING 132"d STREET STORM SEWER IMPROVEMENTS WHEREAS, it was necessary for the Village of Lemont ("Village") to make repairs to the 132❑d Street Storm Sewer to alleviate drainage and flooding issues; and WHEREAS, the Village has used Riccio Construction Corporation, PO Box 672, Palos Park, IL 60464 in the past for the similar improvements; and WHEREAS, the relationship between the Village and Riccio Construction Corporation, Inc. is satisfactory; and WHEREAS, Section 5/8-9-1 of the Illinois Municipal Code (65 ILCS 5/8-9-1) allows the Board of Trustees of the Village of Lemont ("Village Board"), upon a vote of two-thirds of the trustees then holding office, to waive the requirements for competitive bidding; and WHEREAS, the President and Village Board have determined that it is advisable, necessary, and in the best interests of the Village to waive the formal necessities of competitive bidding and authorize the 132"d Street Storm Sewer Improvements from Riccio Construction Corporation, a copy of which is attached hereto as Exhibit A, at a price not to exceed $33,664.78. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: The Foregoing findings and recitals are hereby adopted as section One of this Resolution and are incorporated by reference as if set forth verbatim herein. SECTION 2: Waiver of Public Bid Requirements and Authority to Purchase. The Village Board hereby waives the competitive bidding requirements otherwise applicable for 132" d Street Storm Sewer Improvements per the Invoice from Riccio Construction Corporation at a priced not to exceed $33,664.78, attached hereto as Exhibit A. SECTION 3: The Village President, Village Administrator, or his Designee are authorized to execute any documents and take any other steps necessary for 132"d Street Storm Sewer Improvements by Riccio Construction Corporation at a price not to exceed $33,664.78, and to otherwise carry out this Resolution. SECTION 4: This Resolution shall be in full force and effect from and after its passage and approval as provided by law. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONNT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS 23— DAY OF 2024. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES Janelle Kittridge Dave Maher Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: U q - g CHAR46 �LEN M. SMOLLEN Village d1Fk 7 4LINVJ\S ABSENT: ABSTAIN: JOHN EGOFSKE President Exhibit A Riccio Construction Corporation Invoice 240127T Riccio Construction Corporation PO Box 672 Palos Park, Illinois 60464 BILL TO: Village of Lemont 418 Main Street Lemont. [L 60439 Invoice DATE INVOICE NO. 6/20/2024 240127T PROJECT DESCRIPTION/ LOCATION: 132nd street storm sewer West of State Street P.O. NO. RCC PROJECT Item No. DESCRIPTION UNIT QTY RATE AMOUNT 132nd street storm sewer improvements Split cost 509%between Village of Lemont & Lemont Township OTY 1 67,329.56 -33,664.78 67,329.56 -33,664.78 Total S33,664.78 Balance due $33,664.78