Loading...
R-44-24 Approving Professional Services Agreement Between HRi. 418 Main Street ( Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Approving Professional Services Agreement Between HR Green, Inc. and Village of Lemont, Illinois for Derby Road Bridge Repairs - Engineering DATE: June 10, 2024 SUMMARY/BACKGROUND HR Green is assisting the Village with Engineering Services for Derby Road Bridge Repairs. The most recent IDOT bridge inspection report recommends repairs and maintenance be performed as outlined in the Agreement. As outlined in the Agreement, the following tasks are included in this Agreement. • Contract executed and notice to proceed- June 2024 • Pre -final contract documents- July 2024 • Final contract documents- August 2024 • Target letting- August/September 2024 • Construction- Fall 2024 The proposed agreement authorizes HR Green, Inc., and the Village of Lemont to move forward with this project. The total not to exceed fees for the project are $35,000.00. ANALYSIS $35,000 has been budgeted in FY25 for Engineering services for this project. Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass Resolution Authorizing Professional Services Agreement Between HR Green, Inc., and Village of Lemont, Illinois for Derby Road Bridge Repairs -Engineering BOARD ACTION REQUESTED Pass Resolution Authorizing Professional Services Agreement Between HR Green, Inc., and Village of Lemont, Illinois for Derby Road Bridge Repairs -Engineering ATTACHMENTS A Resolution Approving Professional Services Agreement Between HR Green, Inc. and the Village of Lemont, Illinois for Derby Road Bridge Repairs-Engineering.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R--24 A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR DERBY ROAD BRIDGE REPAIRS -ENGINEERING JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DA VE MAHER KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on� JQ2024 RESOLUTION NO. R--24 A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR DERBY ROAD BRIDGE REPAIRS -ENGINEERING WHEREAS the Village of Lemont, Counties of Cook, Will, and DuPage, Illinois, ("the Village") is a municipality in the State of Illinois with full powers to enact Ordinances and adopt Resolutions for the benefits of the residents of the Village; and WHEREAS, the Village and HR Green, Inc. wish to enter a professional services agreement for Derby Road Bridge Repairs Engineering as further outlined in the professional services agreement attached hereto as Exhibit A ("Agreement"); and WHEREAS, the Mayor and Board of Trustees find that it is in the best interests of the Village to authorize the Agreement attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: cFCTlnN I That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if frilly set forth in their entirety. SECTION 2: The Mayor and Board of Trustees of the Village of Lemont hereby approve the Agreement with HR Green, Inc. in substantially the same form as attached hereto as Exhibit A, subject to attorney review. SECTION 3: The Mayor and Cleric are hereby authorized, respectively, to execute the Agreement with HR Green, Inc. SECTION 4: This Resolution, and its parts, are declared to be severable and any section, subsection, sentence, clause, provision, or portion of this Resolution that is declared invalid such decision shall not affect the validity of any other portion of this Resolution, which shall remain in full force and effect. SECTION 5: All Resolutions and Ordinances in conflict herewith are hereby repealed to the extent of such conflict. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS its DAY OF J VV) 2024. Janelle Kittridge Dave Maher Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton ATTEST: PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES: i� CHARLE E M. SMOLLEN Village Clerk ABSENT: ABSTAIN: JOHN EGOFSKE President Exhibit A Derby Road Bridge Repairs -Engineering Agreement HRGreen® PROFESSIONAL SERVICES AGREEMENT For Village of Lemont Derby Road Bridge Repairs - Engineering Village of Lemont Mr. George Schafer Village Administrator 418 Main Street Lemont, IL, 60439-3708 Ph: (815) 385-6023 / Fax: (815) 385-6054 Bruce A. Hill, PE Municipal Executive I — Governmental Services Engineering HR Green, Inc. 323 Alana Drive New Lenox, IL 60451 815.462.9324 2303235 June 5, 2024 Version 2.3 02052021 TABLE OF CONTENTS 1.0 PROJECT UNDERSTANDING 2.0 SCOPE OF SERVICES 3.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT 4.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES 5.0 SERVICES BY OTHERS 6.0 CLIENT RESPONSIBILITIES 7.0 PROFESSIONAL SERVICES FEE 8.0 TERMS AND CONDITIONS Version2.3 02052021 HRGreen® Professional Services Agreement Derby Road Bridge Repairs HR Green Project No.: 2304037 June 5, 2024 Page 1 of 6 THIS AGREEMENT is between Village of Lemont (hereafter "CLIENT') and HR GREEN, INC. (hereafter "COMPANY"). 1.0 Project Understanding 1.1 General Understanding CLIENT has initiated a project requiring professional engineering services to repair the bridge carrying Derby Road over Pine Needles Drive located in Lemont, Illinois. The scope of work includes the following items as outlined in the provided inspection report dated October 2022: • replace the deck expansion joint material; • clean and flush deck drains; • apply concrete bridge deck sealer to the top of the concrete deck, sidewalk, parapets, and approach slabs to preserve concrete that is exposed to deicing chemicals; • repair potholes at the approach roadway pavement near the abutments; • clean debris from the abutment seats; • perform PCC partial depth patching of the spalled concrete and seal cracks on the bridge approach slabs; • repair the bridge approach sidewalks to remediate surface discontinuities; • remove and reinstall guardrail and guardrail transitions to meet current IDOT standards; • install missing nut and washer for the anchor bolt on the third bearing (from west) on the south abutment; • install missing exterior side retainer at the north abutment: • and clean and remove loose paint and rust from the steel bearing plates and side retainers and re -paint. In general, this SCOPE OF SERVICES governs the engineering services required for the development of plans, specifications and estimates (PS&E). COMPANY will also provide bidding assistance and Phase III support. It is assumed the proposed improvement will not require additional right of way. Preparation of plat and legal descriptions and land acquisition services are not included in this SCOPE OF SERVICES. It is understood all engineering and construction for this project will be funded 100% locally by CLIENT. As such, coordination with the Illinois Department of Transportation (IDOT) will not be required. Coordination with the Illinois Department of Natural Resources (IDNR) and the United States Army Corps of Engineers (USACE) will not be required. CLIENT intends to bid the project locally. 1.2 Design Criteria/Assumptions COMPANY will apply the following guidelines in the design of the project, including the bridge and any other associated work and ancillary improvements: A. IDOT Bridge Manual; Version2.3 02052021 HRGreen. Professional Services Agreement Derby Road Bridge Repairs HR Green Project No.: 2304037 June 5, 2024 Page 2 of 6 B. AASHTO LRFD Bridge Design Manual; C. IDOT Standard Specifications for Road and Bridge Construction (latest edition); and D. Manual on Uniform Traffic Control Devices (MUTCD). 2.0 Scope of Services The CLIENT agrees to employ COMPANY to perform the following services: 2.1 Data Collection and Review A. COMPANY will review the most recent inspection report and existing plans. B. COMPANY will complete a site visit and confirm the scope of work items identified in the Bridge Inspection Report. 2.2 Utility Coordination A. Utility Outreach COMPANY will coordinate with any utility companies found to have facilities located within the vicinity of the project limits. An initial request will be made via a JULIE locate request (design -stage ticket). COMPANY will then request from all named companies via the results of the JULIE request that these utility companies provide any available maps and/or plans of existing facilities for placement into a computer -aided design and drafting (CADD) base map for the design. 2.3 Contract Documents COMPANY will prepare contract plans, specifications, and estimates for the proposed improvements as described above. The contract documents will be submitted to CLIENT for review and concurrence at the 90% (pre -final) and 100% (final) milestones. The contract documents will not be submitted to any other agency. The following will be provided as part of the contract documents for this project: A. Contract Plans Item No. of Sheets Cover Sheet / Index of Sheets 1 General Notes / Standards / Bill of Materials 1 Maintenance of Traffic Plans 2 General Plan and Elevation (GP&E) 1 Repair Details 2 Total 7 B. Specifications Version2.3 02052021 HRGreen. Professional Services Agreement Derby Road Bridge Repairs HR Green Project No.: 2304037 June 5, 2024 Page 3 of 6 COMPANY will prepare the following specifications (as applicable) for inclusion in the bid documents: 1. Supplemental Specifications and Recurring Special Provisions; 2. Project Specific Special Provisions; 3. Bureau of Local Roads Special Provisions; 4. Bureau of Design and Environment Special Provisions; and 5. Guide Bridge Special Provisions. C. Estimates COMPANY will prepare the following estimates for the project and submit to CLIENT for review and concurrence at the 90% and 100% milestones: 1. Engineer's Opinion of Probable Construction Cost; and 2. Estimate of Time. 2.4 Bidding Assistance Subsequent to the completion of the design and preparation of contract documents, COMPANY will perform or assist in the following activities: A. COMPANY will assemble the proposal booklet, advertise the project, attend the bid opening, compile the bid tab and letter of recommendation. B. COMPANY will provide any necessary bid assistance and respond to Contractor's bid questions. 2.5 Post Design Activities Subsequent to the completion of bidding activities, COMPANY will perform the following post design activities: A. COMPANY will assist with questions related to the design of the proposed improvements that may arise during construction (Phase III support). For the purposes of this SCOPE OF SERVICES, three (3) responses to contractor Requests for Information (RFIs) have been assumed, which is based on a three (3) month construction duration at a rate of one (1) RFI per month. 2.6 Quality Assurance and Quality Control COMPANY will provide Quality Assurance and Quality Control (QA/QC) in accordance with COMPANY's current Quality Manual (QM), which outlines processes for project planning, including design input, outputs, review and verification. The QM also outlines internal processes, such as standardization, internal project audits, selection and rating of subconsultants, and monitoring of deliverables. 2.7 Project Administration COMPANY will conduct general project administration throughout the duration of the project, including management and oversight of the project team; periodic review of the project execution; Version2.3 02052021 HRGreen® Professional Services Agreement Derby Road Bridge Repairs HR Green Project No.: 2304037 June 5, 2024 Page 4 of 6 document control; scope, schedule and budget monitoring; billing and invoicing; contract file management; and preparation of monthly progress reports. 2.8 Construction Observation COMPANY will conduct spot inspections during construction. 3.0 Deliverables and Schedules Included in this Agreement 3.1 Deliverables The following deliverables will be generated for this project and are included in this SCOPE OF SERVICES: A. Contract Plans; B. Specifications; C. Estimates; and D. Three (3) responses to contractor RFIs (Phase III support). 3.2 Schedule This SCOPE OF SERVICES is based upon an assumed project duration of 8 months, commencing with COMPANY's receipt of Notice to Proceed from CLIENT. This schedule was prepared to include reasonable allowances for review and approval times required by CLIENT and public authorities having jurisdiction over the project. This schedule shall be equitably adjusted as the project progresses, allowing for changes in the scope of the project requested by CLIENT or for delays or other causes beyond the control of COMPANY. An estimated timeline of milestones is as follows: A. Contract Executed & NTP — June 2024 B. Pre -final Contract Documents — July 2024 C. Final Contract Documents — August 2024 D. Target Letting — August/September 2024 E. Construction — Fall 2024 4.0 Items not included in Agreement/Supplemental Services The following items are not included as part of this AGREEMENT: A. Plat of Highways, Plat of Survey/Topography; B. Roadway Borings, Pavement Cores, Roadway Geotechnical Report (RGR); C. Environmental Survey Request (ESR); D. Socio-economic Analysis, Environmental Justice Evaluation; E. Air Quality Analysis, Traffic Noise Analysis; F. Species and Habitat Surveys; G. Existing Tree Species Identification; H. IDNR Historic Preservation Division Coordination (SHPO Coordination); I. Wetland Impact Evaluation (WIE) Form; J. Water Quality Analysis, Pollutant Loading Analysis, Antidegradation Analysis; K. PESA, PSI, Special Waste Sampling, Analysis, LPC Forms, Clearances; L. USACE Section 404 Individual Permit; Version2.3 02052021 HRGreen® Professional Services Agreement Derby Road Bridge Repairs HR Green Project No.: 2304037 June 5, 2024 Page 5 of 6 M. Project Development Report (PDR); N. Public Involvement, Public Information Meeting, Community Advisory Group; O. Design and Plans for Sidewalk, Multi -use Path, and ADA Ramps; P. Suggested Maintenance of Traffic Plans; Q. Pavement Design; R. Land Acquisition Services (Appraisals, Review Appraisals, Negotiations); S. Coordination with IDOT and FHWA; Supplemental services not included in the AGREEMENT can be provided by COMPANY under separate agreement, if desired. 5.0 Services by Others None 6.0 Client Responsibilities None 7.0 Professional Services Fee 7.1 Fees The fee for services will be based on COMPANY standard hourly rates current at the time the AGREEMENT is signed. These standard hourly rates are subject to change upon 30 days' written notice. Non -salary expenses directly attributable to the project such as: (1) living and traveling expenses of employees when away from the home office on business connected with the project; (2) identifiable communication expenses; (3) identifiable reproduction costs applicable to the work; and (4) outside services will be charged in accordance with the rates current at the time the service is done. 7.2 Invoices Invoices for COMPANY's services will be submitted, on a monthly basis. Invoices will be due and payable upon receipt in accordance with the Illinois Prompt Payment Act 50ILCS 505. If any invoice is not paid within these timelines, COMPANY may, without waiving any claim or right against the CLIENT, and without liability whatsoever to the CLIENT, suspend or terminate the performance of services. 7.3 Extra Services Any service required but not included as part of this AGREEMENT shall be considered extra services. Extra services will be billed on a Time and Material basis with prior approval of the CLIENT. 7.4 Exclusion This fee does not include attendance at any meetings or public hearings other than those specifically listed in the Scope of Services. These service items are considered extra and are billed separately on an hourly basis. 7.5 Payment The CLIENT AGREES to pay COMPANY on the following basis: Time and material basis with a Not to Exceed fee of $35,000.00. Version2.3 02052021 HRGreen® 8.0 Terms and Conditions Professional Services Agreement Derby Road Bridge Repairs HR Green Project No.: 2304037 June 5, 2024 Page 6 of 6 This Agreement is an addendum to and is considered part of the Master Agreement between CLIENT and COMPANY. All terms and conditions contained in that agreement apply to this Agreement. This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties signing and dating the AGREEMENT. Services will not begin until COMPANY receives a signed agreement. COMPANY's services shall be limited to those expressly set forth in this AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project except as agreed to in writing. The effective date of the AGREEMENT shall be the last date entered below. Sincerely, HR GREEN, INC. Bruce A. Hill Municipal Executive — Governmental Title: Services — Engineering Date: June 5, 2024 Approved by: r"' 7J' Printed/Typed Name: Timothy J. Hartnett President — Governmental Title: Services/Principal Date: June 5, 2024 VILLAGE OF LEMONT Accepted by: Printed/Typed Name: eorge Schafer Title: Villaqe Administrator Date: Version2.3 02052021