Loading...
R-45-24 Approving Public Works Annex Grading, Basin, Storm Sewer,418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Approving Public Works Annex Grading, Basin, Storm Sewer, Water Main Earth Excavation Overage DATE: June 10, 2024 SUMMARY/BACKGROUND Lemont Public Works Annex -Grading, Basin, Storm & Watermain — Earth Excavation Overage Explanation. The attached Engineer's letter explains the difference in final quantity compared to plan quantity for Item#1 Earth Excavation. This can be attributed to a number of areas where additional earth excavation was needed that was not accommodated for in the plan quantity. 1. Septic Tank — the existing septic tank at the existing house was damaged/leaking. The area was overdue in order to remove the waste. 2. Bore Pit/Receiving Pit (Archer) — a conflict with Nicor occurred where Bullseye planned on putting their pits in at. Extra excavation was needed to accommodate. 3. Bore Pit/Receiving Pit (Derby) — another conflict occurred along Derby Road. Similar to as noted above. 4. Derby Road Drainage Ditch — potholing by a contractor not affiliated with this project was happening on Derby Road. Spoils were left in the ditch and Winninger was asked to remove the spoils and re -grade the ditch to confirm proper flow. 5. Excavated & Re -graded swale between the detention basin and the existing pond to the west. 6. Overflow weir — when excavating for the overflow weir, a lot of fill material like brick and miscellaneous bad soils were removed and replaced with more suitable material from the site. 7. Old Footing — while installing the water main, an old large concrete footing was encountered. Entire footing was removed and paid as earth excavation. 8. Winninger noted multiple times that it appeared that there was a notable amount of additional material on site that was not shown in the plan elevations. The potential for additional material to have been "fly -dumped" onto the site is high. Winninger's as-builts & elevation checks have all been confirmed. There was additional material that the contractor was trying to get additional payment but was denied because it was found to be part of the detention basin pay item. ANALYSIS This project was included in the FY24 Budget as completed $848,780.60 The project was awarded as $742,088.40 and Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass Resolution Approving Public Works Annex Grading, Basin, Storm Sewer, Water Main Earth Excavation Overage BOARD ACTION REQUESTED Pass Resolution Approving Public Works Annex Grading, Basin, Storm Sewer, Water Main Earth Excavation Overage ATTACHMENTS A Resolution Approving Public Works Annex Grading, Basin, Storm Sewer, Water Main Earth Excavation Overage.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R-'1�-24 A RESOLUTION APPROVING PUBLIC WORKS ANNEX GRADING, BASIN, STORM SEWER, WATER MAIN EARTH EXCAVATION OVERAGE JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DA VE MAHER KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICK SNIEGOWSKI RON STAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on b _-zoza RESOLUTION NO. R--24 A RESOLUTION APPROVING PUBLIC WORKS ANNEX GRADING, BASIN, STORM SEWER, WATER MAIN EARTH EXCAVATION OVERAGE WHEREAS the Village of Lemont recommends that Public Works Annex Grading, Basin, Storm Sewer, Water Main Earth Excavation Overage be accepted; and WHEREAS, the Village awarded the contract to Winninger Excavating, Inc., 1211 Deer Street, Yorkville, Illinois 60560 with R-34-23 on 5/8/2023; and WHEREAS, Winninger Excavating, Inc. has completed the Public Works Annex Grading, Basin, Storm Sewer, Water Main Earth Excavation Overage in the amount of $106,692.20. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: Public Works Annex Grading, Basin, Stonn Sewer, Water Main Earth Excavation Overage was completed by Winninger Excavation, Inc., 1211 Deer Street, Yorkville, Illinois, 60560 in the amount of $106,692.20 is hereby approved. SECTION 2: The Village President, Administrator, or Designee is hereby authorized to execute the agreement and to make minor changes to the document prior to execution that do not materially alter the Village's obligations, to execute any other agreements and documentation as well as to take any other steps necessary to carry out this resolution. SECTION 3: This Resolution shall be in full force and effect from and after its passage and approval as provided by law. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS _'D DAY OF �tj cf, 2024. Janelle Kittridge Dave Maher Ken McClafferty Kevin Shaughnessy Rick Sniegowski Ron Stapleton PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAPES: V ATTEST: 4CRLENE .SMOLLEN Village Clerk ABSENT: ABSTAIN: o~' JOHN EGOFSKE ` President Exhibit A Public Works Annex Grading, Basin, Storm Sewer, Water Main Earth Excavation Overage Engineer's Letter HRGreen. May 29, 2024 Mr. George Schafer Administrator Village of Lemont 418 Main Street Lemont, Illinois 60439 ► 323 Alana Drive New Lenox, IL 60451 Main 815.462.9324 +- Fax 713.965.0044 10-HRGREEN.00M Re: Lemont Public Works Annex- Grading, Basin, Storm & Watermain- Engineer's Payment Estimate No. 2 — Earth Excavation Overage Explanation Dear George: This letter is to explain the difference in final quantity compared to plan quantity for Item #1 Earth Excavation. This can be attributed to a number of areas where additional earth excavation was needed that was not accommodated for in the plan quantity. 1. Septic Tank — the existing septic tank at the existing house was damaged/leaking. The area was overdug in order to remove the waste. 2. Bore Pit/Receiving Pit (Archer) — a conflict with Nicor occurred where Bullseye planned on putting their pits in at. Extra excavation was needed to accommodate. 3. Bore Pit/Receiving Pit (Derby) — another conflict occurred along Derby Road. Similar to as noted above. 4. Derby Road Drainage Ditch — potholing by a contractor not affiliated with this project was happening on Derby Road. Spoils were left in the ditch and Winninger was asked to remove the spoils and re - grade the ditch to confirm proper flow. 5. Excavated & Re -graded swale between the detention basin and the existing pond to the west. 6. Overflow weir — when excavating for the overflow weir, a lot of fill material like brick and miscellaneous bad soils were removed and replaced with more suitable material from the site. 7. Old Footing — while installing the water main, an old large concrete footing was encountered. Entire footing was removed and paid as earth excavation. 8. Winninger noted multiple times that it appeared that there was a notable amount of additional material on site that was not shown in the plan elevations. The potential for additional material to have been "fly - dumped" onto the site is high. Winninger's as-builts & elevation checks have all been confirmed. There was additional material that the contractor was trying to get additional payment but was denied because it was found to be part of the detention basin pay item. Should you have any questions concerning this matter, please do not hesitate to contact me. Sincerely, HR GREEN, INC. Bruce A. Hill, P.E. cc: Mr. Ralph Pukula, Director of Public Works