Loading...
R-14-24 Approving Award of Contract Stephen Street Structural Wall Repair Project418 Main Street Lemont, IL 60439 R Village Board Meeting FROM: Ted Friedley, Public Works THROUGH: SUBJECT: A Resolution Approving Award of Contract Stephen Street Structural Wall Repair Project DATE: February 26, 2024 SUMMARY/BACKGROUND Five (5) bids were received on February 2, 2024, for the Stephen Street Structural Wall Repair project which work includes earth excavation and backfill, the removal and installation of concrete structural wall brick veneer installation and all appurtenant construction. The low bid amount was submitted b E.P. Wheaton, IL 60187, in the amount of $858,060.50. After discus Y Doyel &Son, LLC, 1100 Wheaton Oaks Court, District and E.P. Doyle & Son, LLC the best pathway for pedestrians be determined. Some of the proposed sidewalk, and all lions with the Lemont Park project will be removed at a cost savings of nearly $15 0 cans e that corridor h still to Opportunities for cost savings with E.P. Doyle of the proposed striping for the Contractor for the nearby Athens Parkproject.&Son LLC a�Oth y aee alsore lthelGeso be additional General ANALYSIS Consistency with Village Policy 5-Year Capital Improvement Plan (if applicable) STAFF RECOMMENDATION Pass Resolution Accepting the Low Bid for Stephen Street St the Contract Structural Wall Repair and Award BOARD ACTION REQUESTED Pass Resolution Accepting the Low Bid for Stephen Street St the Contract Structural Wall Repair and Award ATTACHMENTS A Resolution Approving Award of Contract Stephen Street Struct ural Wall Repair Project.pdf VILLAGE OF LEMONT RESOLUTION NUMBER R-1 -24 A RESOLUTION APPROVING AWARD OF CONTRACT STEPHEN STREET STRUCTURAL WALL REPAIR PROJECT JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk JANELLE KITTRIDGE DA VE MAHER KEN MCCLAFFERTY KEVIN SHA UGHNESSY RICKSNIEGOWSKI RONSTAPLETON Trustees Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont ony — -��i024 RESOLUTION NO. R-A -2 A RESOLUTION APPROVING AWARD OF CONTRACT STEPHEN STREET STRUCTURAL WALL REPAIR PROJECT WHEREAS the Village of Lemont requires that the Stephen Street Structural Wall Repair project be completed; and WHEREAS, the Village seeks to utilize the services of E.P. Doyle & Son, LLC for such work; and WHEREAS, E.P. Doyle & Son, LLC, 1100 Wheaton Oaks Court, Wheaton, IL 60187 submitted a low bid for such work in the amount of $858,060.50. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows: SECTION 1: The agreement attached hereto as Exhibit A is hereby approved. SECTION 2: The Village Administrator is hereby authorized to execute the agreement and to make minor changes to the document prior to execution that do not materially alter the Village's obligations, to execute any other agreements and documentation as well as to take any other steps necessary to carry out this resolution. SECTION 3: This Resolution shall be in full force and effect from and after its passage and approval as provided by law. PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS - 2- DAY OF r $ Ir 2024. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYES: ABSENT: Janelle Kittridge ABSTAIN: Dave �— Maher —_ Ken McClafferty --- —_ Kevin Shaughnessy ------ -- Rick Sniegowski ----- Ron Stapleton — —_ JOHN EGOFSKE ATTEST: President CHARLENE M. S OLLEN Village Clerk Exhibit A Stephen Street Structural Wall Repair Project Contract Page Contract for Stephen Street Structural Wall Repair 1• THIS AGREEMENT, made and concluded the Leme Admiont, acting by and through the Villa day of between the Village of g nistrator as the party of the first part, and E.P. Doyle &Son LLC 1100 administrators, successors or assigns, Wheaton kn Oaks Court Wheaton IL 60187 his/their executors 2• WITNESSETH: °��'n as the party of the second part. mentioned in the Proposal hereto attached, to or and in consideration maof the part and according to the terms expressed in the Bond referringto payments and agreements e and performed by the party of the first the second part agrees with said party of expense to do all the work, furnish all the materials ass and these presents, the party of d work in accordance with the Plans and S he first part at his/their own proper cost and compliance with all of the terms of this a all labor necessary to complete the Specifications hereinafter described, and in full under it. agreement and the requirements of the En 3' �D, it is Engineer also understood and agreed that the Provisions, Proposal and Contract Bond Novotny Engineering, hereto attached Notice to Contractors, S Y En neering, and designated ,and the Plans as Special documents of this Contract, anare tad as Ste hen Street Structural Wall Re air all essential part hereto. IN 4• e WITNESS WHEREOF, the said parties have executed above mentioned. ed these presents on the date Part of the First Part ATTEST F G F The VILLA E OF L O NT Char ne M. Smollen, BY _ lerl► zw t AL � Admi ge Schafer, tra Village (SEAL) Part v of the Second Part I N � eS Corporate (If a Corporation) Name E.P. Do le &Son LLC. Secretary By (Corporate Seal) President (If a Co -Partnership) SEAL SEAL Partners doing Business under the name of (If an Individual) SEAL Exhibit B Engineer's Letter, Bid Tabulation Listing HRGreen. February 20, 2024 Mr. George Schafer Village Administrator Village of Lemont 418 Main Street Lemont, IL 60439 Re: Stephen Street Structural Wall Repair HR Green Proj. No.: 2303238 Dear George: 323 Alana Drive New Lenox, IL 60451 Main 815,462.9324 + Fax 713.965.0044 HRGREEN.00M Attached please find the tabulation sheet for the bid opened on February 2, 2024, for the subject project, Stephen Street Structural Wall Repair Project. HR Green, Inc. has verified that out of the five (5) bidder's, E.P. Doyle & Son, LLC. is the apparent qualified low bidder at $858,060.50 total for the complete project. The bids range from the noted low bid up to $1,485,865.00. Our engineer's opinion of probable construction cost for the full project was calculated as $764,120.00. Based on the results as summarized above and because E.P. Doyle & Son, LLC. is a qualified contractor, we recommend them to be awarded the contract at their bid prices that currently show a total amount of $858,060.50. After discussions with Lemont Park District and E.P. Doyle & Son, LLC, the best pathway for pedestrians in that corridor is still to be determined. Some of the proposed sidewalk and all of the proposed striping for this project will be removed at a cost savings of nearly $15,000.00. There could also be additional opportunities for cost savings with E.P. Doyle & Son, LLC also being the General Contractor for the nearby Athens Park project. If you have any questions or need additional information, please do not hesitate to contact me at 815-320-7130. Sincerely, HR GREEN, INC. Z Bruce A. Hill, P.E. Municipal Services Executive Enclosure BAH/ka J92023'2303238'Design\BidVta020524-Letter_o!_Recommendation_2024_Stephen_St_Structural_Wall Repaicdocx en" i Building Communities. Improving Lives.