R-10-24 Approving Professional Services Agreement Between HR Green, Inc. and Village of Lemont, Illinois for State Street LAFO Resurfacing Preliminary Phase I Engineering Servicesa- 10- 2,
418 Main Street I Lemont, IL 60439
TO: Village Board Meeting
FROM: Ted Friedley, Public Works
THROUGH:
SUBJECT: A Resolution Approving Professional Services Agreement Between HR
Green, Inc. and Village of Lemont, Illinois for State Street LAFO
Resurfacing Preliminary Phase I Engineering Services
DATE: February 12, 2024
SUMMARY/BACKGROUND
The Village of Lemont Public Works Department prepared an
RFQ for the State Street LAFO Resurfacing project and
received responses from four (4) Firms. HR Green was
selected following the IDOT Qualification Based Selection
(QBS) process for Preliminary Phase I, Design Phase II and
Construction Phase III Engineering Services.
This agreement is for Phase I preliminary engineering
services for an amount not to exceed $12,500.00.
As outlined in the Agreement, the following tasks Are
included in this Agreement:
Phase I Engineering
HR Green, Inc. will prepare a Phase I Study and Design
Report for the proposed improvements for resurfacing of
State Street. The Phase I Study and Report will be prepared
to FHWA Standards and it has been anticipated that this
project will be processed following Local Agency Functional
Overlay (LAFO) guidelines utilizing IDOT BLR Form 46300.
A. Early Coordination
1. Coordinate and schedule a kick-off meeting with
VILLAGE, IDOT Local Roads, and Southwest
Conference Planning Liaison.
2. Complete and submit Project Program Information
(PPI) form.
B. Data Collection and Review
1. Prepare aerial mosaics of the project limits to be
used for exhibits and meetings. The latest
County aerials will be utilized.
2. Coordinate with utility companies to obtain maps of
utilities within the project limits and place this
information on CADD base maps.
3. Request existing roadway and utility plans from the
VILLAGE (where available).
C. Preliminary Design Studies
1. Prepare location maps.
2. Prepare existing and proposed typical section
sheets.
3. Prepare the resurfacing plan sheets (1" = 50' base
maps).
D. Phase I Report
1. Prepare draft Phase I LAFO Submittal (BLR 46300)
and report exhibits.
2. Preliminary Opinions of Probable Costs will be
developed.
3. Provide IDOT two (2) draft reports for review and
comment by Village staff.
4. Address IDOT's preliminary report and prepare final
Phase I Report.
E. Meetings
1. This project will require the following meetings
during Phase 1:
a. Phase I Kick-off with IDOT (virtual Webex
meeting).
b. In -person meeting at Village.
c. Meeting Information:
• COMPANY will have two (2) representatives at
all meetings.
• COMPANY will prepare meeting minutes.
F. Pavement Cores and Soils Investigation
COMPANY will retain the services of a geotechnical sub -
consultant to perform the geotechnical investigation for the
project. The tasks to be performed as part of the project will
include pavement cores (at 1,000-ft intervals, up to 2' depth)
in accordance with IDOT geotechnical standards.
IDOT will require the necessary analysis and certifications
for Clean Construction
Demolition Debris (CCDD) as part of the project and the sub -
consultant will develop the required reports and IEPA
certification forms (LPC 662/663) to be included as part of
the Phase I Project Report.
ANALYSIS
Consistency with Village Policy
5-Year Capital Improvement Plan (if applicable)
STAFF RECOMMENDATION
Pass Resolution Authorizing Professional Services Agreement Between HR Green, Inc. and
Village of Lemont, Illinois for State Street LAFO Resurfacing Phase I Preliminary Engineering
Services.
BOARD ACTION REQUESTED
Pass Resolution Authorizing Professional Services Agreement Between HR Green, Inc. and
Village of Lemont, Illinois for State Street LAFO Resurfacing Phase I Preliminary Engineering
Services.
ATTACHMENTS
A Resolution Approving Professional Services Agreement Between HR Green, Inc. and
Village of Lemont, Illinois for State Street LAFO Resurfacing Preliminary Phase I Engineering
Services.pdf
VILLAGE OF LEMONT
RESOLUTION
NUMBER R- -24
A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT
BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR
STATE STREET LAFO RESURFACING PRELIMINARY PHASE I ENGINEERING
SERVICES
JOHN EGOFSKE, Village President
CHARLENE M. SMOLLEN, Clerk
JANELLE KITTRIDGE
DAVE MAHER
KEN MCCLAFFERTY
KEVIN SHA UGHNESSY
RICK SNIEGOWSKI
RON STAPLETON
Trustees
Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont o,� �+�2024
RESOLUTION NO. R- IrO -24
A RESOLUTION APPROVING PROFESSIONAL SERIVCES AGREEMENT
BETWEEN HR GREEN, INC. AND THE VILLAGE OF LEMONT, ILLINOIS FOR
STATE STREET LAFO RESURFACING PRELIMINARY PHASE I ENGINEERING
SERVICES
WHEREAS the Village of Lemont, Counties of Cook, Will, and DuPage, Illinois, ("the
Village") is a municipality in the State of Illinois with full powers to enact Ordinances and adopt
Resolutions for the benefits of the residents of the Village; and
WHEREAS, the Village and HR Green, Inc. wish to enter a professional services
agreement for State Street LAFO Resurfacing Preliminary Phase I Engineering services as further
outlined in the professional services agreement attached hereto as Exhibit A ("Agreement'); and
WHEREAS, the Mayor and Board of Trustees find that it is in the best interests of the
Village to authorize the Agreement attached hereto as Exhibit A.
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of
the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows:
SECTION 1:
That the above recitals and legislative findings are found to be true and correct and are
hereby incorporated herein and made a part hereof as if fully set forth in their entirety.
SECTION 2:
The Mayor and Board of Trustees of the Village of Lemont hereby approve the
Agreement with HR Green, Inc. in substantially the same form as attached hereto as Exhibit A,
subject to attorney review.
SECTION 3:
The Mayor and Clerk are hereby authorized, respectively, to execute the Agreement with
HR Green, Inc.
SECTION 4:
This Resolution, and its parts, are declared to be severable and any section, subsection,
sentence, clause, provision, or portion of this Resolution that is declared invalid such decision
shall not affect the validity of any other portion of this Resolution, which shall remain in full
force and effect.
SECTION 5:
All Resolutions and Ordinances in conflict herewith are hereby repealed to the extent of
such conflict.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS,
ON THIS DAY OF Cq 2024.
ti
PRESIDENT AND VILLAGE BOARD MEMBERS:
AYES:: NAYES: ABSENT: ABSTAIN:
Janelle Kittridge
Dave Maher
IrA
Ken McClafferty
Kevin Shaughnessy
Rick Sniegowski
Ron Stapleton
ATTEST:
JOHN EGOFSKE
President
I �90 4&!9 1 '�
CHARLENE IkI.SMOLLEN
Village Clerk
4LIti0,
Exhibit A
State Street LAFO Resurfacing Preliminary Phase I Engineering Services Agreement
HRGreen.
PROFESSIONAL SERVICES AGREEMENT
For
State Street LAFO
Village of Lemont
Mr. George Schafer, Village Administrator
418 Main Street
Lemont, IL 60439
815.257.1550
gschafer(a)lemont.il.us
Prepared by: Bruce A. Hill, PE
Municipal Executive — Governmental Services
HR Green, Inc.
323 Alana Drive
New Lenox, IL 60451
815.320.7130
Bruce. hill(cDhrgeen.com
Reviewed by: Timothy J. Hartnett
President, Governmental Services / Principal
HR Green Project Number: 2303599
January 30, 2024
Version 2.3 02052021
TABLE OF CONTENTS
1.0 PROJECT UNDERSTANDING
2.0 SCOPE OF SERVICES
3.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT
4.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES
5.0 SERVICES BY OTHERS
6.0 CLIENT RESPONSIBILITIES
7.0 PROFESSIONAL SERVICES FEE
8.0 TERMS AND CONDITIONS
Version2.3 02052021
HRGreen®
Professional Services Agreement
State Street LAFO
HR Green Project No.: 2303599
January 30, 2024
Page 1 of 4
THIS AGREEMENT is between Village of Lemont (hereafter "CLIENT") and HR Green, Inc.
(hereafter "COMPANY").
1.0 Project Understanding
The Village of Lemont (VILLAGE) proposes to improve State Street by resurfacing it from
Cass Street to 127th Street. The total length of improvements is approximately 5,700 feet
or 1.08 miles.
The general scope of the improvements are hot -mix asphalt surface removal and
resurfacing, sidewalk and ADA ramp removal and replacement, spot curb and gutter
removal and replacement, pavement marking, pavement patching, structure adjustments,
and landscape restoration.
2.0 Scope of Services
The CLIENT agrees to employ COMPANY to perform the following services:
Phase I Engineering
HR Green, Inc. (COMPANY) will prepare a Phase I Study and Design Report for the
proposed improvements for resurfacing of State Street. The Phase I Study and Report will
be prepared to FHWA Standards and it has been anticipated that this project will be
processed following Local Agency Functional Overlay (LAFO) guidelines utilizing IDOT BLR
Form 46300.
A. Early Coordination
1. Coordinate and schedule a kick-off meeting with VILLAGE, IDOT Local Roads,
and Southwest Conference Planning Liaison;
2. Complete and submit Project Program Information (PPI) form.
B. Data Collection and Review
1. Prepare aerial mosaics of the project limits to be used for exhibits and meetings.
The latest County aerials will be utilized;
2. Coordinate with utility companies to obtain maps of utilities within the project
limits and place this information on CADD base maps;
3. Request existing roadway and utility plans from the VILLAGE (where available).
C. Preliminary Design Studies
1. Prepare location maps;
2. Prepare existing and proposed typical section sheets;
3. Prepare the resurfacing plan sheets (1" = 50' base maps).
D. Phase I Report
1. Prepare draft Phase I LAFO Submittal (BLR 46300) and report exhibits;
2. Preliminary Opinions of Probable Costs will be developed;
3. Provide IDOT two (2) draft reports for review and comment by Village staff;
4. Address IDOT's preliminary report and prepare final Phase I Report.
Version2.3 02052021
HRGreen®
Professional Services Agreement
State Street LAFO
HR Green Project No.: 2303599
January 30, 2024
Page 2 of 4
E. Meetings
1. This project will require the following meetings during Phase I:
a. Phase I Kick-off with IDOT (virtual Webex meeting);
b. In -person meeting at Village;
c. Meeting Information:
• COMPANY will have two (2) representatives at all meetings;
• COMPANY will prepare meeting minutes.
F. Pavement Cores and Soils Investigation
COMPANY will retain the services of a geotechnical sub -consultant to perform the
geotechnical investigation for the project. The tasks to be performed as part of the
project will include pavement cores (at 1,000-ft intervals, up to 2' depth) in
accordance with IDOT geotechnical standards.
IDOT will require the necessary analysis and certifications for Clean Construction
Demolition Debris (CCDD) as part of the project and the sub -consultant will develop
the required reports and IEPA certification forms (LPC 662/663) to be included as
part of the Phase I Project Report.
3.0 Deliverables and Schedules Included in this Agreement
The Company will provide the Client 2 approved copies of the Project Development
Report
Schedule: The project will be complete within 120 days from the receipt of Notice to
Proceed. It is anticipated that the PDR will be completed before September 30, 2024 ,
which is the end of Federal Fiscal Year 2024
This schedule was prepared to include reasonable allowances for review and approval
times required by the CLIENT and public authorities having jurisdiction over the project.
This schedule shall be equitably adjusted as the project progresses, allowing for changes
in the scope of the project requested by the CLIENT or for delays or other causes beyond
the control of COMPANY.
4.0 Items not included in Agreement/Supplemental Services
The following items are not included as part of this AGREEMENT:
- Phase II Engineering
- Phase III Engineering
- Construction
Supplemental services not included in the AGREEMENT can be provided by COMPANY
under separate agreement, if desired.
Version2.3 02052021
HRGreen.
5.0 Services by Others
None
6.0 Client Responsibilities
None
7.0 Professional Services Fee
7.1 Fees
Professional Services Agreement
State Street LAFO
HR Green Project No.: 2303599
January 30, 2024
Page 3 of 4
The fee for services will be based on COMPANY standard hourly rates current at the time
the AGREEMENT is signed. These standard hourly rates are subject to change upon 30
days' written notice. Non -salary expenses directly attributable to the project such as: (1)
living and traveling expenses of employees when away from the home office on business
connected with the project; (2) identifiable communication expenses; (3) identifiable
reproduction costs applicable to the work; and (4) outside services will be charged in
accordance with the rates current at the time the service is done.
7.2 Invoices
Invoices for COMPANY's services shall be submitted, on a monthly basis. Invoices shall
be due and payable upon receip tin accordance with Illinois Prompt Payment Act
50 I LCS505
Extra Services
Any service required but not included as part of this AGREEMENT shall be considered extra
services. Extra services will be billed on a Time and Material basis with prior approval of
the CLIENT.
7.3 Exclusion
This fee does not include attendance at any meetings or public hearings other than those
specifically listed in the Scope of Services. These service items are considered extra and
are billed separately on an hourly basis.
7.4 Payment
The CLIENT AGREES to pay COMPANY on the following basis:
Lump sum amount of $12,500 for all of the work as specified in the Agreement
$12,500.00.
Version2.3 02052021
HRGreen.
8.0 Terms and Conditions
Professional Services Agreement
State Street LAFO
HR Green Project No.: 2303599
January 30, 2024
Page 4 of 4
This Agreement is an addendum to and is considered part of the Master Agreement
between CLIENT and COMPANY. All terms and conditions contained in that agreement
apply to this Agreement.
This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties
signing and dating the AGREEMENT. Services will not begin until COMPANY receives a signed
agreement. COMPANY's services shall be limited to those expressly set forth in this
AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project
except as agreed to in writing. The effective date of the AGREEMENT shall be the last date
entered below.
Sincerely,
HR GREEN, INC.
z a *,Z-(
Bruce A. Hill, PE
Approved by:
Printed/Typed Name: Timothy J. Hartnett
President — Governmental Services /
Title: Principal Date
1 /30/24
VILLAGE OF LEMONT
Accepted by:
Printed/Typed Name: George Schafer
Title: Village Administrator Date: 2-(q —Zy
J:\2023\2303599\Adm i n\Contract\Client\pro-013024-State_St_LAFO-bh.docx
Version2.3 02052021