Loading...
R-62-23 Authorizing A Reduction of a Letter of Credit for Covington Knolls Unit 82VI1,LA.GE 01+P EMONT �L�62-a3 418 Main Street I Lemont, IL 60439 TO: Village Board Meeting FROM: Donna Pecina, Community Development THROUGH: SUBJECT: A Resolution Authorizing A Reduction of a Letter of Credit for Covington Knolls Unit 8 DATE: October 23, 2023 SUMMARY/BACKGROUND Farmingdale Development Company, developer of Covington Knolls 8, has requested a reduction to their letter of credit to $248,278.99. The Village Engineer has reviewed and accepts the reduction request. ANALYSIS Consistency with Village Policy Lemont 2030 Comprehensive Plan STAFF RECOMMENDATION Staff is recommending approval of the attached resolution. BOARD ACTION REQUESTED A motion to approve the attached resolution. ATTACHMENTS Resolution dated 10232023 Reduction of LOC Covington Knolls 8.pdf VILLAGE OF LEMONT RESOLUTION NO. q A RESOLUTION AUTHORIZING A REDUCTION OF A LETTER OF CREDIT FOR COVINGTON KNOLLS UNIT 8 ADOPTED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT THIS 23RD DAY OF OCTOBER, 2023 Published in pamphlet form by authority of the President and Board of Trustees of the Village of Lemont, Cook, Will and DuPage Counties, Illinois on this 23rd day of October, 2023. RESOLUTION NO. 9 2- A RESOLUTION AUTHORIZING A REDUCTION OF A LETTER OF CREDIT FOR COVINGTON KNOLLS UNIT 8 WHEREAS, pursuant to the Lemont, Illinois Municipal Code, Title 17 Unified Development Ordinance, an owner or developer of a subdivision is required to deposit certain security or evidence thereof with the Village of Lemont to guarantee the installation of subdivision improvements; and WHEREAS, in the matter of Covington Knolls Unit 8, located north of 127th Street and west of Covington Drive in Lemont, IL, Heartland Bank issued an Irrevocable Letter of Credit No. 6590137938 in the amount of $1,078,141.34 and was deposited with the Village of Lemont to guarantee completion of subdivision improvements; and WHEREAS, Farmingdale Development Company, developer of Covington Knolls Unit 8, has completed certain improvements and has requested a reduction in the aforementioned letter of credit; and WHEREAS, the Village Engineer of the Village of Lemont has inspected certain portions of the improvements and has found these portions to have been satisfactorily installed; and NOW, THEREFORE BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont that: 1. Irrevocable Letter of Credit No 6590137938 is hereby reduced to a balance of $248,278.99. ADOPTED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DuPAGE, ILLINOIS, on this 23rd day of October, 2023. PRESIDENT AND VILLAGE BOARD MEMBERS: AYES: NAYS: ABSENT: ABSTAIN Janelle Kittridge �/" Dave Maher�� Ken McClafferty Kevin Shaughnessy _ Rick Sniegowski Ron Stapleton JOHN EGOSKE, Village President Attest: CHARLENE M. SMOLLEN, Village Clerk I= ► 323 Alana Drive New Lenox, IL 60451 Main 815.462.9324 + Fax 713.965.0044 ►HKGREEN.COM October 17, 2023 Mr. Jason Berry, CEcD, AICP Economic & Community Development Director Village of Lemont 418 Main Street Lemont, Illinois 60439 Re: Covington Knolls — Phase 8 Letter of Credit Reduction #1 Dear Jason: This letter is to certify that I have reviewed the request from Farmingdale Development Company, dated 10/12/23, requesting a new letter of credit value for the LOC shown below and concur with such request. The backup information submitted by Farmingdale Development Company is attached with this letter. - LOC #6590137938 reduced to $248,278.99. This development has still not reached the maintenance phase yet. Should you have any questions concerning this matter, please do not hesitate to contact me. Sincerely, HR GREEN, INC. Bruce A. Hill, P.E. Enclosure cc: Mr. George Schafer, Village Administrator, w/Enc. Mr. Ralph Pukula, Director of Public Works, w/Enc. Mr. Jim Begy, P.E., LEED AP BD+C, Building Commissioner, w/ Enc. Ms. Jamie Tate, AICP, Consulting Planner, w/ Enc. Ms. Darshana Prakash, Finance Director, w/ Enc. File No. 2303616 \\hrgreen.coin\HRG\Data\2023\2303616\Construction\LOCs\Reduction t41\Itr_101623_2303616_LOC Reduction N1.docx Farmingdale Development Company LAND DEVELOPERS 6280 JOLIET ROAD COUNTRYSIDE. ILLINOIS 60525 708.482.8900 October 17, 2023 Village of Lemont Mr Jason Berry Mr. Bruce Hill 418 Main Street Lemont, IL 60439 Re: Letter of Credit #6590137938 Heartland Bank Covington Knolls Unit 8 Gentlemen, Since we have completed the majority of the improvements in Covington Knolls, Unit 8, we would like to request the reduction of the above letter of credit from $1,078,141.34, to $248,278.99. Upon approval, please contact Dan Nagle, Sr Vice President, DCNagle@hbtbank.com, 708-246- 3284 Office or 708-227-4622 Cell at Heartland Bank and Trust to make arrangements for the reduction of the LOC. Please let us know if you need any further information. Sincerely, FARMINGDALE DEVELOPMENT COMPANY JDG:Ifs LETTER OF CREDIT REDUCTIO REQUEST PROJECT: Covington Knolls (Phase 8) [Parking Lots] LOCATION: Warrenville, IL PROJECT #: 243 ITEM NO. DESCRIPTION UNIT QUANTITY REVISED: UNIT COST BY: PJW DATE: 10-13-23 TOTAL COST STATUS - C = COMPLETED EARTHWORK TOPSOIL STRIPING CU YD 6,200 $3.45 $ 21,390.00 C 2 CLAY EXCAVATION CU YD 9,500 $3.85 $ 35,598.75 C 3 TOPSOIL RESPREAD CU YD 407 $8.05 $ 3,276.35 C 4 SILT FENCE FOOT 4,846 $3.45 $ 16,718.70 C 5 MOBILIZATION LUMP 1 $11,500.00 $ 11,500.00 C 6 CONSTRUCTION LUMP 1 $8050.00 $ 8,050.00 ENTRANCE SUBTOTAL= 96,533.80 BASIN EXCAVATION/BI OSWALE MATERIALS 7 Mobilization EACH 1 $5,750.00 $ 5,760.00 C 8 4" Perforated PVC LF 937 $17.25 $ 16.163.25 C 9 24" FES EACH 3 $920.00 $ 2,760.00 C 10 Earth Excavation CU.YD 730 $13.80 $ 10,074.00 C 11 Sand (Engineered Soil) CU.YD 250 $16.10 $ 4,025.00 C 12 Mulch/Compost(Engineered Soil) CU.YD 150 $16.10 $ 2.415.00 C 13 CA-7 Stone CU.YD 675 $23.00 $ 15,525.00 C 14 Sod (Basin Bottom) SY 3350 $4.60 $ 16,330.00 $ 1.,840.00 *1 SUBTOTAL = $ 73,042.25 WATERMAIN 15 8"DIPWM FOOT 1434 $37.55 $53,846.70 C 16 8" VALVE AND VAULT EACH 3 $2,294.25 $6.882.75 C 17 CONNECT TO EX. WATERMAIN EACH 2 $2,294.25 $4,588.50 C 18 FIRE HYDRANT w/ AUX VALVE EACH 5 $2,587.50 $12,937.60 C 19 TRENCH BACKFILL CU YD 380 $36.80 $13,984.00 C. 20 LONG WTR SERVICE w/ TAP SADDLE EACH 10 $1,610.00 $16.100.00 C 21 SHORT WTR SERVICE wl TAP SADDLE EACH 14 $920.00 $12.880.00 C 22 PRESSURE TEST LUMP 1 1725 $1,725.00 C SUBTOTAL= $122,944.45 SANITARY SEWER 23 8" PVC SDR26 FOOT 948 S29 90 $28,345.20 C 24 4' DIA. MANHOLE w/ CHIMNEY SEAL EACH 5 $2,702.50 $13,512.50 C 25 CONNECT TO EX. SAN. SEWER EACH 1 $575.00 $575.00 C 26 TRENCH BACKFILL CU YD 785 $36.80 $28.888.00 C 27 LONG SANITARY SERVICE EACH 12 $1,150.00 $13,800.00 C 28 SHORT SANITARY SERVICE EACH 12 $805.00 $9.660.00 C 29 TV INSPECTION FOOT 948 $3.45 $3 270.60 C SUBTOTAL= $98.051.30 STORM SEWER 30 12" RCP FOOT 452 $28.75 $12,995.00 C 31 15" RCP FOOT 350 $31.05 $10,867.50 C 32 18" RCP FOOT 150 $33.36 $6,002.50 C 33 21" RCP FOOT 145 $35.65 $5,169.25 C 34 24" RCP FOOT 1344 $39.10 $52,550.40 C 35 27" RCP FOOT 154 $44.85 $6,906.90 C 36 REMOVE EX. STORM SEWER FOOT 296 $8.63 $2,553.00 C 37 PLUG 8 SEAL EX STRUCTURES EACH 4 $287.50 $1,150.00 C 38 CB, TYPE C - 24" EACH 2 $1,380.00 $2,760.00 C 39 CB, TYPE A - 48" EACH 19 $2,530.00 $48,070.00 C 40 MH, TYPE A-48" EACH 2 $2,300.00 $4,600.00 C 41 CB, TYPE A - 60" EACH 2 $2,780 00 $5.520.00 C 42 MH, TYPE A-60" EACH 7 $41:i3000 $17,710.00 C 43 CONNECT TO EXISTING EACH 5 $690.00 $3,450.00 C 44 TRENCH BACKFILL CU YD 215 $36.80 $7,912.00 C 38 TV INSPECTION FOOT 8120 $3.45 $28,014.00 C SUBTOTAL= 215.230.55 WST1. A C-ASSOCIATES PROJECT: Covington Knolls (Phase 8) [Parking Lots) BY: DATE: REVISED: P,1 W LOCATION: Warrenville, IL 10-13-23 PROJECT#: 243 ITEM NO. DESCRIPTION UNIT QUANTITIY UNIT COST TOTAL COST PAVING & MISCELLANEOUS 39 CURB AND GUTTER WI 4" BASE CSE FOOT 1996 $23.00 $45,908.00 C 40 BITUMINOUS BASE COURSE SQ YO 3279 $25.30 $84958.70 C 41 BITUMINOUS BINDER COURSE SQ YD 3279 $7.76 $25,463.24 C 42 BITUMINOUS SURFACE COURSE SQ YD 3279 $7.48 $24,510.53 $ 24,510,00 43 BASE COURSE FINE GRADING SQ YD 3279 $0.98 $3,205.22 C 44 ROAD FABRIC (NON -WOVEN, 8-, geo) SO YD 3279 $1.44 $4,713.56 C 45 LIGHT POLES EACH 5 $3,450.00 $17,250.00 $ 17,250.00 46 SODDING (PARKWAYS) SO YD 2391 $3.45 $8,248.95 $ 8,248.95 47 STREET TREES @ 40' SPACI NG EACH 50 $460.00 $23,000.00 $ 23,000.00 48 TPCC SIDEWALK w/X'SUBBASE SOFT 11502 $518 $59,522.85 $ 59,522.85 49 GRASS PAVER -BLOCK ACCESS WAY SQ FT 3907 $9.20 $35,944.40 C SUBTOTAL= $330,715.45 $ 134,371.80 1' 15% CONTINGENCY = $140,627.13 PROJECT TOTAL= $1,078,141.34 15%CONTINGENCY ORIGINAL 10 % BOND ORIGINAL LETTER OF CREDIT AMOUNT AMOUNT OF REDUCTION REQUESTED *1 400 yards remaining in west basins TOTAL = $937,514.21 $ 20,155.77 $ 93,751.42 $ 248,278.99 $1,078,141.34 $ 829,862.35